{"title":"油气风化的不确定性:高污染气田的挑战与设计优化","authors":"Norlela Mustaffa, Rohaizad M Norpiah, Dyg Amalina Azzyati Awang Bakar, Qurratuaini M Nazori, Muliadi Agus","doi":"10.4043/31379-ms","DOIUrl":null,"url":null,"abstract":"\n Typically, for a high volume, low condensate-gas ratio offshore gas production field having high content of carbon dioxide (CO2), hydrogen sulphide (H2S), mercury and solid particulates having to meet Liquified Natural Gas (LNG) inlet specification would require an enormous facility exceeding the largest available floatover vessel capacity. Aside from an enormous and complex processing facility, it would also require a large emergency disposal system and sour service pipeline material to cater for start-up and process excursion scenarios. In order to obtain a commercially attractive solution while meeting technical integrity and designing for operational excellence in mind, several innovative design approaches were implemented. The scope of this paper will cover major optimization implemented at gas treatment system, emergency blowdown system, export gas pipeline, and venting system at receiving platform.","PeriodicalId":11081,"journal":{"name":"Day 2 Wed, March 23, 2022","volume":"4 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-03-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Weathering Uncertainties in Oil & Gas: Challenges and Design Optimization of High Contaminant Gas Field\",\"authors\":\"Norlela Mustaffa, Rohaizad M Norpiah, Dyg Amalina Azzyati Awang Bakar, Qurratuaini M Nazori, Muliadi Agus\",\"doi\":\"10.4043/31379-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Typically, for a high volume, low condensate-gas ratio offshore gas production field having high content of carbon dioxide (CO2), hydrogen sulphide (H2S), mercury and solid particulates having to meet Liquified Natural Gas (LNG) inlet specification would require an enormous facility exceeding the largest available floatover vessel capacity. Aside from an enormous and complex processing facility, it would also require a large emergency disposal system and sour service pipeline material to cater for start-up and process excursion scenarios. In order to obtain a commercially attractive solution while meeting technical integrity and designing for operational excellence in mind, several innovative design approaches were implemented. The scope of this paper will cover major optimization implemented at gas treatment system, emergency blowdown system, export gas pipeline, and venting system at receiving platform.\",\"PeriodicalId\":11081,\"journal\":{\"name\":\"Day 2 Wed, March 23, 2022\",\"volume\":\"4 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-03-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Wed, March 23, 2022\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4043/31379-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, March 23, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/31379-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Weathering Uncertainties in Oil & Gas: Challenges and Design Optimization of High Contaminant Gas Field
Typically, for a high volume, low condensate-gas ratio offshore gas production field having high content of carbon dioxide (CO2), hydrogen sulphide (H2S), mercury and solid particulates having to meet Liquified Natural Gas (LNG) inlet specification would require an enormous facility exceeding the largest available floatover vessel capacity. Aside from an enormous and complex processing facility, it would also require a large emergency disposal system and sour service pipeline material to cater for start-up and process excursion scenarios. In order to obtain a commercially attractive solution while meeting technical integrity and designing for operational excellence in mind, several innovative design approaches were implemented. The scope of this paper will cover major optimization implemented at gas treatment system, emergency blowdown system, export gas pipeline, and venting system at receiving platform.