单点气举SPGL是泰国Greater Bongkot North油田的一项快速改造气举应用,可最大限度地提高石油产量和采收率

C. Peerakham, Sineenat Kruennumjai, T. Junmano, Cholavit Boonchun, Krit Ngamkamollert, Pradondate Ut-ang, J. Whangkitjamorn, Suwin Sompopsart
{"title":"单点气举SPGL是泰国Greater Bongkot North油田的一项快速改造气举应用,可最大限度地提高石油产量和采收率","authors":"C. Peerakham, Sineenat Kruennumjai, T. Junmano, Cholavit Boonchun, Krit Ngamkamollert, Pradondate Ut-ang, J. Whangkitjamorn, Suwin Sompopsart","doi":"10.2118/197809-ms","DOIUrl":null,"url":null,"abstract":"\n In Greater Bongkot North (GBN) Gas Condensate Field located in Gulf of Thailand, many oil wells have recently encountered liquid loading problems. Numerous attempts of gas pressurizing and lowering wellhead pressure have been made but could not sustain continuous oil production. This paper describes the use of innovative technique, Single Point Gas Lift (SPGL) Application, to revive oil production and increase oil recovery from liquid loading wells without the need for an expensive workover operation.\n SPGL is a retrofit retrievable gas lift straddle that can be installed in the existing production tubing via slick-line unit. This fit-for-purpose solution requires 3 main stages of planning and execution. Firstly, design parameters are identified by simulation software e.g. injection depth, injection rate and pressure. Then, gas lift vale (GLV) is installed by punching the tubing at designed depth, followed by installation of gas lift assembly across the punched depth which includes orifice, check valve and pack-off. Lastly, gas supply is injected into annulus and passes through the installed GLV into production tubing.\n The pilot test was conducted at well Bongkot-1, a liquid loaded horizontal oil well. SPGL installation was completed successfully followed by deployment of nitrogen injection unit as gas supply in order to prove the concept of SPGL. The gas lifting operation was begun with well unloading and then varying injection rate to determine an optimum gas injection rate. As a result of total 16 hours of nitrogen injection, the cumulative oil production volume of 3,000 STB was realized, indicating the success of the SPGL application. Consequently, long term production phase by utilizing gas supply from high pressure donor well is being implemented.\n The result proves that SPGL helps to not only revive liquid loading well but also recover more oil reserves and generate more revenues with low cost and simple operation. In 2019, at least 4 oil wells have been scheduled for installation of SPGL application and later with more proven track record of success, it could be extendedly applied to other oil/gas condensate wells, having liquid loading problems, in Greater Bongkot North Field and other fields operated by PTTEP.","PeriodicalId":11091,"journal":{"name":"Day 3 Wed, November 13, 2019","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-11-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Single Point Gas Lift SPGL, A Quick Win Retrofit Gas Lift Application to Maximize Oil Production and Recovery in Greater Bongkot North Field, Thailand\",\"authors\":\"C. Peerakham, Sineenat Kruennumjai, T. Junmano, Cholavit Boonchun, Krit Ngamkamollert, Pradondate Ut-ang, J. Whangkitjamorn, Suwin Sompopsart\",\"doi\":\"10.2118/197809-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n In Greater Bongkot North (GBN) Gas Condensate Field located in Gulf of Thailand, many oil wells have recently encountered liquid loading problems. Numerous attempts of gas pressurizing and lowering wellhead pressure have been made but could not sustain continuous oil production. This paper describes the use of innovative technique, Single Point Gas Lift (SPGL) Application, to revive oil production and increase oil recovery from liquid loading wells without the need for an expensive workover operation.\\n SPGL is a retrofit retrievable gas lift straddle that can be installed in the existing production tubing via slick-line unit. This fit-for-purpose solution requires 3 main stages of planning and execution. Firstly, design parameters are identified by simulation software e.g. injection depth, injection rate and pressure. Then, gas lift vale (GLV) is installed by punching the tubing at designed depth, followed by installation of gas lift assembly across the punched depth which includes orifice, check valve and pack-off. Lastly, gas supply is injected into annulus and passes through the installed GLV into production tubing.\\n The pilot test was conducted at well Bongkot-1, a liquid loaded horizontal oil well. SPGL installation was completed successfully followed by deployment of nitrogen injection unit as gas supply in order to prove the concept of SPGL. The gas lifting operation was begun with well unloading and then varying injection rate to determine an optimum gas injection rate. As a result of total 16 hours of nitrogen injection, the cumulative oil production volume of 3,000 STB was realized, indicating the success of the SPGL application. Consequently, long term production phase by utilizing gas supply from high pressure donor well is being implemented.\\n The result proves that SPGL helps to not only revive liquid loading well but also recover more oil reserves and generate more revenues with low cost and simple operation. In 2019, at least 4 oil wells have been scheduled for installation of SPGL application and later with more proven track record of success, it could be extendedly applied to other oil/gas condensate wells, having liquid loading problems, in Greater Bongkot North Field and other fields operated by PTTEP.\",\"PeriodicalId\":11091,\"journal\":{\"name\":\"Day 3 Wed, November 13, 2019\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-11-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Wed, November 13, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/197809-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, November 13, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/197809-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在泰国湾的Greater Bongkot North凝析气田(GBN),许多油井最近都遇到了液体加载问题。人们曾多次尝试气体加压和降低井口压力,但都无法维持连续的石油生产。本文介绍了采用创新技术——单点气举(SPGL)应用,在不需要昂贵的修井作业的情况下,恢复石油产量并提高液体加载井的石油采收率。SPGL是一种改进型可回收气举跨式装置,可以通过钢丝绳装置安装在现有的生产油管上。这种适合目的的解决方案需要三个主要的计划和执行阶段。首先,通过仿真软件确定注射深度、注射速度和压力等设计参数。然后,通过在设计深度上冲孔油管来安装气举阀(GLV),然后在冲孔深度上安装气举总成,包括孔板、止回阀和封隔器。最后,将气体注入环空,并通过安装的GLV进入生产油管。先导试验在Bongkot-1井进行,这是一口含液水平井。为了验证SPGL的概念,SPGL安装成功完成,随后部署了注氮装置作为供气装置。首先进行气举作业,卸载井,然后改变注气速率,以确定最佳注气速率。经过16小时的注氮,实现了3000 STB的累计产油量,标志着SPGL应用的成功。因此,利用高压供气井的长期生产阶段正在实施。实验结果表明,SPGL不仅能有效地提高储液率,还能以低成本、简单的操作方式获得更多的石油储量和收益。2019年,至少有4口油井计划安装SPGL应用程序,之后,随着更多成功的记录,它可以扩展应用于PTTEP运营的Greater Bongkot North油田和其他油田的其他油/气凝析井,这些井存在液体负载问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Single Point Gas Lift SPGL, A Quick Win Retrofit Gas Lift Application to Maximize Oil Production and Recovery in Greater Bongkot North Field, Thailand
In Greater Bongkot North (GBN) Gas Condensate Field located in Gulf of Thailand, many oil wells have recently encountered liquid loading problems. Numerous attempts of gas pressurizing and lowering wellhead pressure have been made but could not sustain continuous oil production. This paper describes the use of innovative technique, Single Point Gas Lift (SPGL) Application, to revive oil production and increase oil recovery from liquid loading wells without the need for an expensive workover operation. SPGL is a retrofit retrievable gas lift straddle that can be installed in the existing production tubing via slick-line unit. This fit-for-purpose solution requires 3 main stages of planning and execution. Firstly, design parameters are identified by simulation software e.g. injection depth, injection rate and pressure. Then, gas lift vale (GLV) is installed by punching the tubing at designed depth, followed by installation of gas lift assembly across the punched depth which includes orifice, check valve and pack-off. Lastly, gas supply is injected into annulus and passes through the installed GLV into production tubing. The pilot test was conducted at well Bongkot-1, a liquid loaded horizontal oil well. SPGL installation was completed successfully followed by deployment of nitrogen injection unit as gas supply in order to prove the concept of SPGL. The gas lifting operation was begun with well unloading and then varying injection rate to determine an optimum gas injection rate. As a result of total 16 hours of nitrogen injection, the cumulative oil production volume of 3,000 STB was realized, indicating the success of the SPGL application. Consequently, long term production phase by utilizing gas supply from high pressure donor well is being implemented. The result proves that SPGL helps to not only revive liquid loading well but also recover more oil reserves and generate more revenues with low cost and simple operation. In 2019, at least 4 oil wells have been scheduled for installation of SPGL application and later with more proven track record of success, it could be extendedly applied to other oil/gas condensate wells, having liquid loading problems, in Greater Bongkot North Field and other fields operated by PTTEP.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信