迈向楼宇自动化系统的全面生命周期方法

M. Lehmann, Jorg Andreas, T. L. Mai, K. Kabitzsch
{"title":"迈向楼宇自动化系统的全面生命周期方法","authors":"M. Lehmann, Jorg Andreas, T. L. Mai, K. Kabitzsch","doi":"10.1109/ISIE.2017.8001474","DOIUrl":null,"url":null,"abstract":"The communication between different partners to handle the different tasks during the life cycle of buildings is far from being perfect. Fragmented engineering, lack of data consistency, insufficient system documentation or sensitivity for data sharing are only a few of many problems in this field that have not been efficiently handled through researches as well as in practice. This paper focuses on a deeper analysis of these problems mainly in the planning and engineering phases (they are the basis for all other phases) from both technical and economical point of view. An approach to handle these problems will be presented and thoroughly discussed.","PeriodicalId":6597,"journal":{"name":"2017 IEEE 26th International Symposium on Industrial Electronics (ISIE)","volume":"1 1","pages":"1541-1547"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Towards a comprehensive life cycle approach of building automation systems\",\"authors\":\"M. Lehmann, Jorg Andreas, T. L. Mai, K. Kabitzsch\",\"doi\":\"10.1109/ISIE.2017.8001474\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The communication between different partners to handle the different tasks during the life cycle of buildings is far from being perfect. Fragmented engineering, lack of data consistency, insufficient system documentation or sensitivity for data sharing are only a few of many problems in this field that have not been efficiently handled through researches as well as in practice. This paper focuses on a deeper analysis of these problems mainly in the planning and engineering phases (they are the basis for all other phases) from both technical and economical point of view. An approach to handle these problems will be presented and thoroughly discussed.\",\"PeriodicalId\":6597,\"journal\":{\"name\":\"2017 IEEE 26th International Symposium on Industrial Electronics (ISIE)\",\"volume\":\"1 1\",\"pages\":\"1541-1547\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 IEEE 26th International Symposium on Industrial Electronics (ISIE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISIE.2017.8001474\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 IEEE 26th International Symposium on Industrial Electronics (ISIE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISIE.2017.8001474","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

在建筑的生命周期中,不同的合作伙伴之间处理不同任务的沟通还远远不够完善。工程碎片化、数据缺乏一致性、系统文档化不足或数据共享敏感性不足,这些都是该领域在研究和实践中尚未得到有效解决的众多问题中的一小部分。本文主要从技术和经济的角度对规划和工程阶段(它们是所有其他阶段的基础)的这些问题进行更深入的分析。将提出并深入讨论处理这些问题的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Towards a comprehensive life cycle approach of building automation systems
The communication between different partners to handle the different tasks during the life cycle of buildings is far from being perfect. Fragmented engineering, lack of data consistency, insufficient system documentation or sensitivity for data sharing are only a few of many problems in this field that have not been efficiently handled through researches as well as in practice. This paper focuses on a deeper analysis of these problems mainly in the planning and engineering phases (they are the basis for all other phases) from both technical and economical point of view. An approach to handle these problems will be presented and thoroughly discussed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信