预算项目作为国家道路规划工作队东北区第四省的资金控制工具

Analisis Pub Date : 2021-09-01 DOI:10.37478/als.v11i2.1263
Maria Yunita Ina, Lambertus Langga
{"title":"预算项目作为国家道路规划工作队东北区第四省的资金控制工具","authors":"Maria Yunita Ina, Lambertus Langga","doi":"10.37478/als.v11i2.1263","DOIUrl":null,"url":null,"abstract":"This study aims to determine and analyze whether the difference that occurs is a favorable difference for the Janction Kelimutu Ende road project and to determine the function of the project budget plan as a cost control tool for the Janction Kelimutu Road project at the Regional National Road Implementation Unit Office IV East Nusa Tenggara Province. The method used in this research is quantitative research which emphasizes on resting the project method. The analytical method used in this research is variance analysis. The results in this study, namely (1) there is a difference between the  budget and the realization of the cost of the road widening project at the  Kelimutu Ende Junction; (2) the function of the protection budget made by the company has not functioned properly as a control tool,; and (3) the form of control carried out by the management as a result of an unfavorable difference between the budget and the realization of project costs, namely by conducting periodic supervision.","PeriodicalId":33467,"journal":{"name":"Analisis","volume":"4 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"PROYEK ANGGARAN SEBAGAI ALAT PENGENDALIAN BIAYA PADA KANTOR SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH IV PROVINSI NUSA TENGGARA TIMUR\",\"authors\":\"Maria Yunita Ina, Lambertus Langga\",\"doi\":\"10.37478/als.v11i2.1263\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study aims to determine and analyze whether the difference that occurs is a favorable difference for the Janction Kelimutu Ende road project and to determine the function of the project budget plan as a cost control tool for the Janction Kelimutu Road project at the Regional National Road Implementation Unit Office IV East Nusa Tenggara Province. The method used in this research is quantitative research which emphasizes on resting the project method. The analytical method used in this research is variance analysis. The results in this study, namely (1) there is a difference between the  budget and the realization of the cost of the road widening project at the  Kelimutu Ende Junction; (2) the function of the protection budget made by the company has not functioned properly as a control tool,; and (3) the form of control carried out by the management as a result of an unfavorable difference between the budget and the realization of project costs, namely by conducting periodic supervision.\",\"PeriodicalId\":33467,\"journal\":{\"name\":\"Analisis\",\"volume\":\"4 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Analisis\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.37478/als.v11i2.1263\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Analisis","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37478/als.v11i2.1263","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究旨在确定和分析发生的差异是否为Janction Kelimutu恩德公路项目的有利差异,并确定项目预算计划作为Janction Kelimutu公路项目成本控制工具在东努沙登加拉省区域国道实施单位办公室的作用。本研究采用的方法是定量研究,强调采用项目法。本研究使用的分析方法是方差分析。研究结果表明:(1)克利木图恩德枢纽道路加宽工程的预算与实现成本存在差异;(二)公司制定的保护预算作为控制工具的功能不能正常发挥的;(3)由于预算与项目成本实现之间的不利差异,管理层进行控制的形式,即通过定期监督进行控制。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
PROYEK ANGGARAN SEBAGAI ALAT PENGENDALIAN BIAYA PADA KANTOR SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH IV PROVINSI NUSA TENGGARA TIMUR
This study aims to determine and analyze whether the difference that occurs is a favorable difference for the Janction Kelimutu Ende road project and to determine the function of the project budget plan as a cost control tool for the Janction Kelimutu Road project at the Regional National Road Implementation Unit Office IV East Nusa Tenggara Province. The method used in this research is quantitative research which emphasizes on resting the project method. The analytical method used in this research is variance analysis. The results in this study, namely (1) there is a difference between the  budget and the realization of the cost of the road widening project at the  Kelimutu Ende Junction; (2) the function of the protection budget made by the company has not functioned properly as a control tool,; and (3) the form of control carried out by the management as a result of an unfavorable difference between the budget and the realization of project costs, namely by conducting periodic supervision.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
8
审稿时长
8 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信