基于博弈论方法的解除管制市场下扩产计划实施延迟风险缓解

Sarjiya, Rizki Firmansyah Setya Budi, S. P. Hadi
{"title":"基于博弈论方法的解除管制市场下扩产计划实施延迟风险缓解","authors":"Sarjiya, Rizki Firmansyah Setya Budi, S. P. Hadi","doi":"10.1109/ICITEED.2019.8929956","DOIUrl":null,"url":null,"abstract":"Delay on power plant constructions is a big problem in Ambon power system. Independent power producer (IPP) is an alternative solution to mitigate the risk of delays. The using of IPP makes the electricity market in Ambon power system becomes a deregulated market. So, before determining the IPP as the expansion power plants in Ambon power system, it is necessary to analyze the interest of investors to invest in the deregulated market (Ambon power system). The research’s purpose is to mitigate the delay risk of GEP implementation by IPP. This research carried out an investor interest analysis so it can be determined which power plants can be built by IPP and which ones must be handled by PLN. This research used modification of game theory method to analyze the investor interest in Ambon system. The research result showed that IPP solution is impossible because they are not interested. All power plants will be built by PLN. The alternative solutions to minimize the delay risk are utilizing capital market, increasing the ability of PLN to generate internal funds, and developed a project finance model where EPC contractors also give a portion on project funding.","PeriodicalId":6598,"journal":{"name":"2019 11th International Conference on Information Technology and Electrical Engineering (ICITEE)","volume":"14 1","pages":"1-6"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Delay Risk Mitigation of Generation Expansion Planning Implementation in the Deregulated Market based on Game Theory Approach\",\"authors\":\"Sarjiya, Rizki Firmansyah Setya Budi, S. P. Hadi\",\"doi\":\"10.1109/ICITEED.2019.8929956\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Delay on power plant constructions is a big problem in Ambon power system. Independent power producer (IPP) is an alternative solution to mitigate the risk of delays. The using of IPP makes the electricity market in Ambon power system becomes a deregulated market. So, before determining the IPP as the expansion power plants in Ambon power system, it is necessary to analyze the interest of investors to invest in the deregulated market (Ambon power system). The research’s purpose is to mitigate the delay risk of GEP implementation by IPP. This research carried out an investor interest analysis so it can be determined which power plants can be built by IPP and which ones must be handled by PLN. This research used modification of game theory method to analyze the investor interest in Ambon system. The research result showed that IPP solution is impossible because they are not interested. All power plants will be built by PLN. The alternative solutions to minimize the delay risk are utilizing capital market, increasing the ability of PLN to generate internal funds, and developed a project finance model where EPC contractors also give a portion on project funding.\",\"PeriodicalId\":6598,\"journal\":{\"name\":\"2019 11th International Conference on Information Technology and Electrical Engineering (ICITEE)\",\"volume\":\"14 1\",\"pages\":\"1-6\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 11th International Conference on Information Technology and Electrical Engineering (ICITEE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICITEED.2019.8929956\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 11th International Conference on Information Technology and Electrical Engineering (ICITEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICITEED.2019.8929956","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

电厂建设延误是安邦电力系统存在的一个大问题。独立发电机组(IPP)是一种降低延迟风险的替代解决方案。IPP的使用使安邦电力系统的电力市场成为一个放松管制的市场。因此,在确定IPP作为Ambon电力系统的扩建电厂之前,有必要分析投资者在放松管制的市场(Ambon电力系统)中投资的利益。本研究的目的是减轻IPP实施GEP的延迟风险。本研究进行了投资者利益分析,因此可以确定哪些发电厂可以由IPP建造,哪些必须由PLN处理。本研究运用修正的博弈论方法对安邦系统的投资者利益进行分析。研究结果表明,IPP解决方案是不可能的,因为他们不感兴趣。所有发电厂都将由PLN建造。最小化延迟风险的替代解决方案是利用资本市场,提高PLN产生内部资金的能力,并开发项目融资模式,其中EPC承包商也提供部分项目资金。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Delay Risk Mitigation of Generation Expansion Planning Implementation in the Deregulated Market based on Game Theory Approach
Delay on power plant constructions is a big problem in Ambon power system. Independent power producer (IPP) is an alternative solution to mitigate the risk of delays. The using of IPP makes the electricity market in Ambon power system becomes a deregulated market. So, before determining the IPP as the expansion power plants in Ambon power system, it is necessary to analyze the interest of investors to invest in the deregulated market (Ambon power system). The research’s purpose is to mitigate the delay risk of GEP implementation by IPP. This research carried out an investor interest analysis so it can be determined which power plants can be built by IPP and which ones must be handled by PLN. This research used modification of game theory method to analyze the investor interest in Ambon system. The research result showed that IPP solution is impossible because they are not interested. All power plants will be built by PLN. The alternative solutions to minimize the delay risk are utilizing capital market, increasing the ability of PLN to generate internal funds, and developed a project finance model where EPC contractors also give a portion on project funding.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信