有潮、有过箱的航道调度

Lara Nehrke, Arne Schulz
{"title":"有潮、有过箱的航道调度","authors":"Lara Nehrke, Arne Schulz","doi":"10.1002/nav.22033","DOIUrl":null,"url":null,"abstract":"Due to the increasing amount of goods transported by vessels and the resulting increased size of the vessels, waterway scheduling becomes a challenging task. Waterways can often only be expanded with enormous costs and environmental damage. Therefore, this paper investigates a scheduling problem on a restricted waterway. Wide vessels are only allowed to pass in a passing box and vessels with deep draught can only pass the waterway in a time window around high tide. We present a mixed‐integer program (MIP) for the problem setting and develop techniques which allow us to fix variables and reduce the number of variables and constraints of the model. The resulting model formulations are evaluated in a comprehensive computational study on a real‐world setting at the river Elbe next to Hamburg (Germany).","PeriodicalId":19120,"journal":{"name":"Naval Research Logistics (NRL)","volume":"14 1","pages":"609 - 621"},"PeriodicalIF":0.0000,"publicationDate":"2021-11-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Scheduling of waterways with tide and passing box\",\"authors\":\"Lara Nehrke, Arne Schulz\",\"doi\":\"10.1002/nav.22033\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Due to the increasing amount of goods transported by vessels and the resulting increased size of the vessels, waterway scheduling becomes a challenging task. Waterways can often only be expanded with enormous costs and environmental damage. Therefore, this paper investigates a scheduling problem on a restricted waterway. Wide vessels are only allowed to pass in a passing box and vessels with deep draught can only pass the waterway in a time window around high tide. We present a mixed‐integer program (MIP) for the problem setting and develop techniques which allow us to fix variables and reduce the number of variables and constraints of the model. The resulting model formulations are evaluated in a comprehensive computational study on a real‐world setting at the river Elbe next to Hamburg (Germany).\",\"PeriodicalId\":19120,\"journal\":{\"name\":\"Naval Research Logistics (NRL)\",\"volume\":\"14 1\",\"pages\":\"609 - 621\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-11-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Naval Research Logistics (NRL)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1002/nav.22033\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Naval Research Logistics (NRL)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/nav.22033","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

由于船舶货物运输量的增加,船舶的体积也随之增大,航道调度成为一项具有挑战性的任务。水道的扩张往往只会带来巨大的成本和环境破坏。因此,本文研究了限制航道上的调度问题。宽型船舶只能在通行箱内通行,吃水大的船舶只能在涨潮前后的时间窗口内通行。我们提出了一个用于问题设置的混合整数程序(MIP),并开发了允许我们固定变量并减少模型中变量和约束数量的技术。在汉堡(德国)附近易北河的真实世界环境中,对所得模型公式进行了全面的计算研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Scheduling of waterways with tide and passing box
Due to the increasing amount of goods transported by vessels and the resulting increased size of the vessels, waterway scheduling becomes a challenging task. Waterways can often only be expanded with enormous costs and environmental damage. Therefore, this paper investigates a scheduling problem on a restricted waterway. Wide vessels are only allowed to pass in a passing box and vessels with deep draught can only pass the waterway in a time window around high tide. We present a mixed‐integer program (MIP) for the problem setting and develop techniques which allow us to fix variables and reduce the number of variables and constraints of the model. The resulting model formulations are evaluated in a comprehensive computational study on a real‐world setting at the river Elbe next to Hamburg (Germany).
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信