尼日利亚东北部迈杜古里受叛乱影响地区建筑项目交付绩效评估

A. Ahmad
{"title":"尼日利亚东北部迈杜古里受叛乱影响地区建筑项目交付绩效评估","authors":"A. Ahmad","doi":"10.36108/ujees/2202.40.0101","DOIUrl":null,"url":null,"abstract":"The study carried out a performance evaluation of insurgency risk factors in Borno. The insurgency risk factors were analysed in terms of three keys that enhance the success of project delivery i.e. Cost, Time and Quality. The data for the study were collected through a questionnaire survey and administered to the professionals involved in the construction projects i.e. the Civil Engineers, Architects, Quantity Surveyors, Builders and Project Managers on construction projects in Maiduguri. The obtained information from the above-mentioned professionals relating to their years of experience and the number of projects they have handled during the insurgency period. A sample size of two hundred and twenty (220) from the total list of the aforementioned respondents Civil Engineers, (52), Builders, (40), Architects, (49), Quantity Surveyors, (43), and Project Managers, (36) i.e. two hundred and forty-eight (248). The sample size was collected using the purposive sampling technique as the targeted sample. The data were analysed using the Relative Importance Index (RII) in order to achieve a concrete and accurate analysis. The results were evaluated and ranked based on the high potential risks prevalent within the construction projects executed during the insurgency period.","PeriodicalId":23413,"journal":{"name":"UNIOSUN Journal of Engineering and Environmental Sciences","volume":"31 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Performance Evaluation of Construction Projects Delivery in Insurgency Affected Locations in Maiduguri, North East, Nigeria\",\"authors\":\"A. Ahmad\",\"doi\":\"10.36108/ujees/2202.40.0101\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The study carried out a performance evaluation of insurgency risk factors in Borno. The insurgency risk factors were analysed in terms of three keys that enhance the success of project delivery i.e. Cost, Time and Quality. The data for the study were collected through a questionnaire survey and administered to the professionals involved in the construction projects i.e. the Civil Engineers, Architects, Quantity Surveyors, Builders and Project Managers on construction projects in Maiduguri. The obtained information from the above-mentioned professionals relating to their years of experience and the number of projects they have handled during the insurgency period. A sample size of two hundred and twenty (220) from the total list of the aforementioned respondents Civil Engineers, (52), Builders, (40), Architects, (49), Quantity Surveyors, (43), and Project Managers, (36) i.e. two hundred and forty-eight (248). The sample size was collected using the purposive sampling technique as the targeted sample. The data were analysed using the Relative Importance Index (RII) in order to achieve a concrete and accurate analysis. The results were evaluated and ranked based on the high potential risks prevalent within the construction projects executed during the insurgency period.\",\"PeriodicalId\":23413,\"journal\":{\"name\":\"UNIOSUN Journal of Engineering and Environmental Sciences\",\"volume\":\"31 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-03-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"UNIOSUN Journal of Engineering and Environmental Sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36108/ujees/2202.40.0101\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"UNIOSUN Journal of Engineering and Environmental Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36108/ujees/2202.40.0101","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

该研究对博尔诺州的叛乱风险因素进行了绩效评估。根据提高项目交付成功的三个关键因素,即成本、时间和质量,对叛乱风险因素进行了分析。该研究的数据是通过问卷调查收集的,并向参与建筑项目的专业人员进行管理,即迈杜古里建筑项目的土木工程师、建筑师、工料测量师、建筑商和项目经理。从上述专业人员处获得的资料说明了他们的经验年限和他们在叛乱期间处理的项目数目。从上述受访者的总名单中抽取220人(220人)作为样本,土木工程师(52人)、建造商(40人)、建筑师(49人)、工料测量师(43人)和项目经理(36人),即248人。样本量的采集采用目的性抽样技术作为目标样本。使用相对重要性指数(RII)对数据进行分析,以实现具体和准确的分析。结果是根据在叛乱期间执行的建设项目中普遍存在的高潜在风险进行评估和排名的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Performance Evaluation of Construction Projects Delivery in Insurgency Affected Locations in Maiduguri, North East, Nigeria
The study carried out a performance evaluation of insurgency risk factors in Borno. The insurgency risk factors were analysed in terms of three keys that enhance the success of project delivery i.e. Cost, Time and Quality. The data for the study were collected through a questionnaire survey and administered to the professionals involved in the construction projects i.e. the Civil Engineers, Architects, Quantity Surveyors, Builders and Project Managers on construction projects in Maiduguri. The obtained information from the above-mentioned professionals relating to their years of experience and the number of projects they have handled during the insurgency period. A sample size of two hundred and twenty (220) from the total list of the aforementioned respondents Civil Engineers, (52), Builders, (40), Architects, (49), Quantity Surveyors, (43), and Project Managers, (36) i.e. two hundred and forty-eight (248). The sample size was collected using the purposive sampling technique as the targeted sample. The data were analysed using the Relative Importance Index (RII) in order to achieve a concrete and accurate analysis. The results were evaluated and ranked based on the high potential risks prevalent within the construction projects executed during the insurgency period.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信