钻井作业对油井完整性和产量的影响:分析与评价

Sachit Saumya, S. Sarkar, Juli Singh, Ajit Kumar, G. Agarwal, Isha Khambra, Jitesh Vij, Bhaswati Das, P. Shedde, C. Majumdar, S. Pabla
{"title":"钻井作业对油井完整性和产量的影响:分析与评价","authors":"Sachit Saumya, S. Sarkar, Juli Singh, Ajit Kumar, G. Agarwal, Isha Khambra, Jitesh Vij, Bhaswati Das, P. Shedde, C. Majumdar, S. Pabla","doi":"10.2118/193208-MS","DOIUrl":null,"url":null,"abstract":"\n Drilling is carried out in the very early stage of the well and it is critical for ensuring smooth execution of every aspect of well construction such as faster drilling, better hole cleaning, superior logging, running casing efficiently, maintaining wellbore integrity and achieving economic production. This paper will demonstrate the significance of best drilling practices to achieve good wellbore geometry, which has a profound effect on total well construction and production time and cost and sometimes even determine the success of the well.\n Poor wellbore geometry, because of improper choice of drilling system i.e. mud motor or rotatory steerable, is generally related to the washed out and/or spiraled wellbore. Washed out hole is recognized by using calipers, however, the hole spiraling is difficult to detect at the early stage of the well. In spiraled holes, it becomes virtually impossible to get a good cementing job done. The poor cementing conditions behind the casing are identified using ultra-sonic images or high amplitudes values of CBL/VDL. These channels behind casing are, a clear threat to production and life cycle of the well. It is widely assumed that the squeeze jobs are an option to improve cement behind casing, however, it does not hold true in case of a spiral borehole. This paper compares the wells, drilled with different drilling system and their impact on the wellbore geometry. It also exhibits the aftermath effects on wellbore construction, well integrity and production.","PeriodicalId":11079,"journal":{"name":"Day 4 Thu, November 15, 2018","volume":"20 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Impact of Drilling Practices on Well Integrity and Production: An Analysis and Assessment\",\"authors\":\"Sachit Saumya, S. Sarkar, Juli Singh, Ajit Kumar, G. Agarwal, Isha Khambra, Jitesh Vij, Bhaswati Das, P. Shedde, C. Majumdar, S. Pabla\",\"doi\":\"10.2118/193208-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Drilling is carried out in the very early stage of the well and it is critical for ensuring smooth execution of every aspect of well construction such as faster drilling, better hole cleaning, superior logging, running casing efficiently, maintaining wellbore integrity and achieving economic production. This paper will demonstrate the significance of best drilling practices to achieve good wellbore geometry, which has a profound effect on total well construction and production time and cost and sometimes even determine the success of the well.\\n Poor wellbore geometry, because of improper choice of drilling system i.e. mud motor or rotatory steerable, is generally related to the washed out and/or spiraled wellbore. Washed out hole is recognized by using calipers, however, the hole spiraling is difficult to detect at the early stage of the well. In spiraled holes, it becomes virtually impossible to get a good cementing job done. The poor cementing conditions behind the casing are identified using ultra-sonic images or high amplitudes values of CBL/VDL. These channels behind casing are, a clear threat to production and life cycle of the well. It is widely assumed that the squeeze jobs are an option to improve cement behind casing, however, it does not hold true in case of a spiral borehole. This paper compares the wells, drilled with different drilling system and their impact on the wellbore geometry. It also exhibits the aftermath effects on wellbore construction, well integrity and production.\",\"PeriodicalId\":11079,\"journal\":{\"name\":\"Day 4 Thu, November 15, 2018\",\"volume\":\"20 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-11-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 4 Thu, November 15, 2018\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/193208-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Thu, November 15, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/193208-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

钻井是在井的早期阶段进行的,它对于确保井建设的各个方面的顺利执行至关重要,例如更快的钻井、更好的井眼清洁、更好的测井、高效下套管、保持井眼完整性和实现经济生产。本文将展示最佳钻井实践对于获得良好的井筒几何形状的重要性,这对整个井的建设、生产时间和成本有着深远的影响,有时甚至决定了井的成功。由于钻井系统(泥浆马达或旋转导向装置)的选择不当,导致井筒几何形状不佳,这通常与洗出和/或螺旋井筒有关。洗井井眼可以用卡钳识别,但井眼螺旋在井初很难检测到。在螺旋井眼中,几乎不可能完成良好的固井作业。利用超声波图像或CBL/VDL的高振幅值来识别套管后面的不良固井状况。套管后的这些通道对油井的生产和生命周期构成了明显的威胁。人们普遍认为,挤压作业是改善套管后固井的一种选择,然而,对于螺旋井眼来说,情况并非如此。本文比较了不同钻井系统下的井及其对井筒几何形状的影响。它还显示了对井筒施工、井完整性和生产的后续影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Impact of Drilling Practices on Well Integrity and Production: An Analysis and Assessment
Drilling is carried out in the very early stage of the well and it is critical for ensuring smooth execution of every aspect of well construction such as faster drilling, better hole cleaning, superior logging, running casing efficiently, maintaining wellbore integrity and achieving economic production. This paper will demonstrate the significance of best drilling practices to achieve good wellbore geometry, which has a profound effect on total well construction and production time and cost and sometimes even determine the success of the well. Poor wellbore geometry, because of improper choice of drilling system i.e. mud motor or rotatory steerable, is generally related to the washed out and/or spiraled wellbore. Washed out hole is recognized by using calipers, however, the hole spiraling is difficult to detect at the early stage of the well. In spiraled holes, it becomes virtually impossible to get a good cementing job done. The poor cementing conditions behind the casing are identified using ultra-sonic images or high amplitudes values of CBL/VDL. These channels behind casing are, a clear threat to production and life cycle of the well. It is widely assumed that the squeeze jobs are an option to improve cement behind casing, however, it does not hold true in case of a spiral borehole. This paper compares the wells, drilled with different drilling system and their impact on the wellbore geometry. It also exhibits the aftermath effects on wellbore construction, well integrity and production.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信