中国致密火山岩气藏水平井首次成功重复压裂实例研究

Wenjun Wang, Hongyan Guo, Youquan Huang, Ying Yu, Donggang Li, Qing-gang Li, Hongyu Sui
{"title":"中国致密火山岩气藏水平井首次成功重复压裂实例研究","authors":"Wenjun Wang, Hongyan Guo, Youquan Huang, Ying Yu, Donggang Li, Qing-gang Li, Hongyu Sui","doi":"10.2523/IPTC-19559-MS","DOIUrl":null,"url":null,"abstract":"\n This paper introduces the first successful refracturing example of horizontal well in a tight volcanic gas reservoir of Xushen gas field. The well was fractured and put into production in 2008, with the accumulated gas production of 0.64×108 m3. Due to the limited technical conditions of the horizontal well-stage fracturing process at that time, only four fracturing stages have been carried out. the horizontal section of the volcanic gas reservoirs with more than 600 meters of the well was not fractured, leaving a large potential for increasing production. In 2017, based on the fine research of gas reservoirs, the refracturing optimization design, multi-stage perforation, fracturing and commissioning integrated tubular completion and the diagnosis control of complex fractures in fracturing construction, the refracturing job of the well is implemented successfully with a good result.","PeriodicalId":11267,"journal":{"name":"Day 3 Thu, March 28, 2019","volume":"14 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-03-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Case Study for the First Successful Refracturing on Horizontal Well in Tight Volcanic Gas Reservoir in China\",\"authors\":\"Wenjun Wang, Hongyan Guo, Youquan Huang, Ying Yu, Donggang Li, Qing-gang Li, Hongyu Sui\",\"doi\":\"10.2523/IPTC-19559-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n This paper introduces the first successful refracturing example of horizontal well in a tight volcanic gas reservoir of Xushen gas field. The well was fractured and put into production in 2008, with the accumulated gas production of 0.64×108 m3. Due to the limited technical conditions of the horizontal well-stage fracturing process at that time, only four fracturing stages have been carried out. the horizontal section of the volcanic gas reservoirs with more than 600 meters of the well was not fractured, leaving a large potential for increasing production. In 2017, based on the fine research of gas reservoirs, the refracturing optimization design, multi-stage perforation, fracturing and commissioning integrated tubular completion and the diagnosis control of complex fractures in fracturing construction, the refracturing job of the well is implemented successfully with a good result.\",\"PeriodicalId\":11267,\"journal\":{\"name\":\"Day 3 Thu, March 28, 2019\",\"volume\":\"14 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-03-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Thu, March 28, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2523/IPTC-19559-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, March 28, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2523/IPTC-19559-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文介绍了徐深气田致密火山岩气藏水平井重复压裂的首个成功实例。该井2008年压裂投产,累计产气量0.64×108 m3。由于当时水平井段压裂工艺技术条件有限,只进行了4段压裂。600米以上的火山岩气藏水平段未进行压裂,增产潜力较大。2017年,通过对气藏的精细研究、重复压裂优化设计、多级射孔、压裂调试一体化管柱完井以及压裂施工中复杂裂缝的诊断控制,成功实施了该井的重复压裂作业,取得了良好的效果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A Case Study for the First Successful Refracturing on Horizontal Well in Tight Volcanic Gas Reservoir in China
This paper introduces the first successful refracturing example of horizontal well in a tight volcanic gas reservoir of Xushen gas field. The well was fractured and put into production in 2008, with the accumulated gas production of 0.64×108 m3. Due to the limited technical conditions of the horizontal well-stage fracturing process at that time, only four fracturing stages have been carried out. the horizontal section of the volcanic gas reservoirs with more than 600 meters of the well was not fractured, leaving a large potential for increasing production. In 2017, based on the fine research of gas reservoirs, the refracturing optimization design, multi-stage perforation, fracturing and commissioning integrated tubular completion and the diagnosis control of complex fractures in fracturing construction, the refracturing job of the well is implemented successfully with a good result.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信