Matthew Botelle, R. Avery, A. Hooper, Steve Feeney
{"title":"HS2 Old Oak Common:协同交付英国最大的新建车站","authors":"Matthew Botelle, R. Avery, A. Hooper, Steve Feeney","doi":"10.1680/jcien.22.00137","DOIUrl":null,"url":null,"abstract":"First stop on the £45 billion, 215 km first phase of Britain’s High Speed Two railway between London and the West Midlands will be at Old Oak Common in north-west London. Costing £1.7 billion and due for completion between 2029 and 2033, the 14-platform structure is the UK’s largest-ever new-build station project. This paper provides an overview of the project and the central role collaboration has played in the enabling works, design and construction contracts, resulting in the development of a truly integrated project team.","PeriodicalId":54573,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Civil Engineering","volume":"5 1","pages":""},"PeriodicalIF":0.4000,"publicationDate":"2022-10-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"HS2 Old Oak Common: collaborative delivery of the UK’s largest new-build station\",\"authors\":\"Matthew Botelle, R. Avery, A. Hooper, Steve Feeney\",\"doi\":\"10.1680/jcien.22.00137\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"First stop on the £45 billion, 215 km first phase of Britain’s High Speed Two railway between London and the West Midlands will be at Old Oak Common in north-west London. Costing £1.7 billion and due for completion between 2029 and 2033, the 14-platform structure is the UK’s largest-ever new-build station project. This paper provides an overview of the project and the central role collaboration has played in the enabling works, design and construction contracts, resulting in the development of a truly integrated project team.\",\"PeriodicalId\":54573,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Civil Engineering\",\"volume\":\"5 1\",\"pages\":\"\"},\"PeriodicalIF\":0.4000,\"publicationDate\":\"2022-10-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Civil Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1680/jcien.22.00137\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Civil Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1680/jcien.22.00137","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
HS2 Old Oak Common: collaborative delivery of the UK’s largest new-build station
First stop on the £45 billion, 215 km first phase of Britain’s High Speed Two railway between London and the West Midlands will be at Old Oak Common in north-west London. Costing £1.7 billion and due for completion between 2029 and 2033, the 14-platform structure is the UK’s largest-ever new-build station project. This paper provides an overview of the project and the central role collaboration has played in the enabling works, design and construction contracts, resulting in the development of a truly integrated project team.
期刊介绍:
Civil Engineering, listed by the Web of Science, is the ICE''s flagship journal. Practical and diverse in its scope, it publishes overview papers for the non-specialist on any subject relevant to civil engineering today. Topics range from landmark projects to philosophical, ethical, environmental, management and safety issues.
Peer review, copyediting, and colour publication by Civil Engineering are free. If accepted, published papers are easily found by Google search, as well as in specialist citation indexes. There is also the option of making your article open access, should you wish to.
Published authors receive a free electronic copy of their article to share with their peers. Furthermore, as well exposure to ICE''s 91,000-strong membership, published papers are promoted via our social media channels, accessing the wider civil engineering community.
It is free to submit a paper to this journal. Papers appear Ahead of Print (below) as soon as they are ready to be published. Ahead of print articles are fully citable. using the DOI system