Durkin Sm, Moroziyuk Oa, Ruzin Lm, Polishvayko Dv, Abzaletdinov Ga
{"title":"亚列格斯科耶油田引进热采创新技术的效果","authors":"Durkin Sm, Moroziyuk Oa, Ruzin Lm, Polishvayko Dv, Abzaletdinov Ga","doi":"10.4172/2157-7463.1000327","DOIUrl":null,"url":null,"abstract":"Presented in this paper are results of the introduction of a modernized single-horizon system of development with heat-insulated pipes at the inclined block \"ÐiевеNнNй\" (“North”) Oil Mine â 2 on the Substation Control «SC-2 bis» (ÐÐУ-2биN) and Substation Control «SC-3 bis» (ÐÐУ-3биN) pilot plots of Yaregskoye Oilfield. \nIn plots SC-2 bis and SC-3 bis, thermometry is systematically carried on the control wells to determine the temperature distribution in the reservoir, as well as the rational distribution of steam injection in the developed plot. A method for determining the effectiveness of injection wells on pilot plots was developed by staff at Ukhta State Technical University. In line with the method, studies which helped to determine the acceleration of underground injection wells necessary for calculating the volume of steam injection at each pilot plot were carried out. \nAlso, regular sampling of water extracted from wells for determining the presence of chlorides is carried out. Based on the analysis of these samples, wells in which have inflows of reservoir water from the aquifer are detected and develop measures to isolate them are then developed.","PeriodicalId":16699,"journal":{"name":"Journal of Petroleum & Environmental Biotechnology","volume":"34 1","pages":"1-6"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Results of Introducing Innovative Thermal Mining Technologies at Yaregskoye Oilfield\",\"authors\":\"Durkin Sm, Moroziyuk Oa, Ruzin Lm, Polishvayko Dv, Abzaletdinov Ga\",\"doi\":\"10.4172/2157-7463.1000327\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Presented in this paper are results of the introduction of a modernized single-horizon system of development with heat-insulated pipes at the inclined block \\\"ÐiевеNнNй\\\" (“North”) Oil Mine â 2 on the Substation Control «SC-2 bis» (ÐÐУ-2биN) and Substation Control «SC-3 bis» (ÐÐУ-3биN) pilot plots of Yaregskoye Oilfield. \\nIn plots SC-2 bis and SC-3 bis, thermometry is systematically carried on the control wells to determine the temperature distribution in the reservoir, as well as the rational distribution of steam injection in the developed plot. A method for determining the effectiveness of injection wells on pilot plots was developed by staff at Ukhta State Technical University. In line with the method, studies which helped to determine the acceleration of underground injection wells necessary for calculating the volume of steam injection at each pilot plot were carried out. \\nAlso, regular sampling of water extracted from wells for determining the presence of chlorides is carried out. Based on the analysis of these samples, wells in which have inflows of reservoir water from the aquifer are detected and develop measures to isolate them are then developed.\",\"PeriodicalId\":16699,\"journal\":{\"name\":\"Journal of Petroleum & Environmental Biotechnology\",\"volume\":\"34 1\",\"pages\":\"1-6\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-06-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Petroleum & Environmental Biotechnology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4172/2157-7463.1000327\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Petroleum & Environmental Biotechnology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4172/2157-7463.1000327","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Results of Introducing Innovative Thermal Mining Technologies at Yaregskoye Oilfield
Presented in this paper are results of the introduction of a modernized single-horizon system of development with heat-insulated pipes at the inclined block "ÐiевеNнNй" (“North”) Oil Mine â 2 on the Substation Control «SC-2 bis» (ÐÐУ-2биN) and Substation Control «SC-3 bis» (ÐÐУ-3биN) pilot plots of Yaregskoye Oilfield.
In plots SC-2 bis and SC-3 bis, thermometry is systematically carried on the control wells to determine the temperature distribution in the reservoir, as well as the rational distribution of steam injection in the developed plot. A method for determining the effectiveness of injection wells on pilot plots was developed by staff at Ukhta State Technical University. In line with the method, studies which helped to determine the acceleration of underground injection wells necessary for calculating the volume of steam injection at each pilot plot were carried out.
Also, regular sampling of water extracted from wells for determining the presence of chlorides is carried out. Based on the analysis of these samples, wells in which have inflows of reservoir water from the aquifer are detected and develop measures to isolate them are then developed.