小龙矿成本估算与战略成本管理研究

Y. Xu, Qun Liu
{"title":"小龙矿成本估算与战略成本管理研究","authors":"Y. Xu, Qun Liu","doi":"10.1109/ICIEEM.2009.5344533","DOIUrl":null,"url":null,"abstract":"The paper analyzes the theory on SCM The object is the Xiao Long Mine's cost expediture constitution. It formed a way, the work flow model analysis tool, estimating the cost of Xiao Long Mine. This way is combined with the theories of ABC, TOC and SCMIn conclusion, it clarifies the improvement on account issue concerning the activity and convergence character.","PeriodicalId":6326,"journal":{"name":"2009 16th International Conference on Industrial Engineering and Engineering Management","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2009-12-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The research on Xiao Long Mine's estimating cost & strategic cost management\",\"authors\":\"Y. Xu, Qun Liu\",\"doi\":\"10.1109/ICIEEM.2009.5344533\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper analyzes the theory on SCM The object is the Xiao Long Mine's cost expediture constitution. It formed a way, the work flow model analysis tool, estimating the cost of Xiao Long Mine. This way is combined with the theories of ABC, TOC and SCMIn conclusion, it clarifies the improvement on account issue concerning the activity and convergence character.\",\"PeriodicalId\":6326,\"journal\":{\"name\":\"2009 16th International Conference on Industrial Engineering and Engineering Management\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-12-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 16th International Conference on Industrial Engineering and Engineering Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICIEEM.2009.5344533\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 16th International Conference on Industrial Engineering and Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIEEM.2009.5344533","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文对供应链管理理论进行了分析,以小龙矿的成本支出构成为研究对象。它形成了一种方法,即工作流模型分析工具,估算小龙矿的成本。该方法结合ABC、TOC和SCMIn的理论结论,明确了会计问题在活动性和收敛性方面的改进。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The research on Xiao Long Mine's estimating cost & strategic cost management
The paper analyzes the theory on SCM The object is the Xiao Long Mine's cost expediture constitution. It formed a way, the work flow model analysis tool, estimating the cost of Xiao Long Mine. This way is combined with the theories of ABC, TOC and SCMIn conclusion, it clarifies the improvement on account issue concerning the activity and convergence character.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信