{"title":"小龙矿成本估算与战略成本管理研究","authors":"Y. Xu, Qun Liu","doi":"10.1109/ICIEEM.2009.5344533","DOIUrl":null,"url":null,"abstract":"The paper analyzes the theory on SCM The object is the Xiao Long Mine's cost expediture constitution. It formed a way, the work flow model analysis tool, estimating the cost of Xiao Long Mine. This way is combined with the theories of ABC, TOC and SCMIn conclusion, it clarifies the improvement on account issue concerning the activity and convergence character.","PeriodicalId":6326,"journal":{"name":"2009 16th International Conference on Industrial Engineering and Engineering Management","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2009-12-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The research on Xiao Long Mine's estimating cost & strategic cost management\",\"authors\":\"Y. Xu, Qun Liu\",\"doi\":\"10.1109/ICIEEM.2009.5344533\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper analyzes the theory on SCM The object is the Xiao Long Mine's cost expediture constitution. It formed a way, the work flow model analysis tool, estimating the cost of Xiao Long Mine. This way is combined with the theories of ABC, TOC and SCMIn conclusion, it clarifies the improvement on account issue concerning the activity and convergence character.\",\"PeriodicalId\":6326,\"journal\":{\"name\":\"2009 16th International Conference on Industrial Engineering and Engineering Management\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-12-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 16th International Conference on Industrial Engineering and Engineering Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICIEEM.2009.5344533\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 16th International Conference on Industrial Engineering and Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIEEM.2009.5344533","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The research on Xiao Long Mine's estimating cost & strategic cost management
The paper analyzes the theory on SCM The object is the Xiao Long Mine's cost expediture constitution. It formed a way, the work flow model analysis tool, estimating the cost of Xiao Long Mine. This way is combined with the theories of ABC, TOC and SCMIn conclusion, it clarifies the improvement on account issue concerning the activity and convergence character.