巴里省(BAPPEDA)太阳能在线网格发电系统分析

I. K. Juniarta, I. N. Setiawan, I. A. Dwi Giriantari
{"title":"巴里省(BAPPEDA)太阳能在线网格发电系统分析","authors":"I. K. Juniarta, I. N. Setiawan, I. A. Dwi Giriantari","doi":"10.24843/spektrum.2022.v09.i01.p13","DOIUrl":null,"url":null,"abstract":"In the 2020 fiscal year, the Ministry of Energy and Mineral Resources of the Republic ofIndonesia provided PLTS On-Grid grants to the Province of Bali as many as 10 PLTS locationsin Denpasar City. One of them is in the Regional Development Planning Agency (BAPPEDA) ofBali Province with an installed capacity of 25 kWp which is connected to the PLN network.BAPPEDA Bali is an example of the NRE Development Program and the Regional Medium-Term Development (RPJMD) that supports the PV mini-grid sector. This research wasconducted to determine the performance of the PLTS electrical system and to simulate theresults of PLTS production using Helioscope software so that it can compare the simulationresults of 2 scenarios with real conditions to determine the level of effectiveness in savingelectricity bills and the factors that influence the results of PLTS energy production. The resultsshowed that the potential for electrical energy generated for a year from the simulation ofScenario 1 and Scenario 2 was 38.90MWh and 39.07MWh. It is known that the real energyproduction from July to December 2021 is 18,083 kWh with the simulation results of scenario 1and scenario 2 from July to December 2021 which are 19,810 kWh and 20,015 kWh. Thedifference between real energy production and the simulation results in scenario 1 and scenario2 is 1,727kWh with a percentage of 8.72%, and 1,931kWh with a percentage of 9.65%. Thepercentage of savings obtained for 6 months in 2021 compared to 6 months in 2020 is 56.42%with a saving value of Rp. 18,783,953.","PeriodicalId":30870,"journal":{"name":"Jurnal Ilmiah Spektrum","volume":"46 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"ANALISIS SISTEM KELISTRIKAN PADA PEMBANGKIT LISTRIK TENAGA SURYA ON-GRID KAPASITAS 25 KWP DI BADAN PERENCANAAN PEMBANGUNAN DAERAH (BAPPEDA) PROVINSI BALI\",\"authors\":\"I. K. Juniarta, I. N. Setiawan, I. A. Dwi Giriantari\",\"doi\":\"10.24843/spektrum.2022.v09.i01.p13\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the 2020 fiscal year, the Ministry of Energy and Mineral Resources of the Republic ofIndonesia provided PLTS On-Grid grants to the Province of Bali as many as 10 PLTS locationsin Denpasar City. One of them is in the Regional Development Planning Agency (BAPPEDA) ofBali Province with an installed capacity of 25 kWp which is connected to the PLN network.BAPPEDA Bali is an example of the NRE Development Program and the Regional Medium-Term Development (RPJMD) that supports the PV mini-grid sector. This research wasconducted to determine the performance of the PLTS electrical system and to simulate theresults of PLTS production using Helioscope software so that it can compare the simulationresults of 2 scenarios with real conditions to determine the level of effectiveness in savingelectricity bills and the factors that influence the results of PLTS energy production. The resultsshowed that the potential for electrical energy generated for a year from the simulation ofScenario 1 and Scenario 2 was 38.90MWh and 39.07MWh. It is known that the real energyproduction from July to December 2021 is 18,083 kWh with the simulation results of scenario 1and scenario 2 from July to December 2021 which are 19,810 kWh and 20,015 kWh. Thedifference between real energy production and the simulation results in scenario 1 and scenario2 is 1,727kWh with a percentage of 8.72%, and 1,931kWh with a percentage of 9.65%. Thepercentage of savings obtained for 6 months in 2021 compared to 6 months in 2020 is 56.42%with a saving value of Rp. 18,783,953.\",\"PeriodicalId\":30870,\"journal\":{\"name\":\"Jurnal Ilmiah Spektrum\",\"volume\":\"46 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Ilmiah Spektrum\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24843/spektrum.2022.v09.i01.p13\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ilmiah Spektrum","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24843/spektrum.2022.v09.i01.p13","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

在2020财年,印度尼西亚共和国能源和矿产资源部向巴厘岛省提供了位于登巴萨市的多达10个PLTS并网补助金。其中一个位于巴厘岛省区域发展规划局(BAPPEDA),装机容量为25千瓦时,与PLN网络相连。BAPPEDA巴厘项目是支持光伏微型电网行业的新能源发展计划和区域中期发展(RPJMD)的一个例子。本研究旨在确定PLTS电气系统的性能,并利用Helioscope软件对PLTS生产结果进行仿真,将2种场景的仿真结果与实际情况进行对比,以确定PLTS节能效果的高低以及影响PLTS能源生产结果的因素。结果表明,情景1和情景2模拟1年产生的电能潜力分别为38.90MWh和39.07MWh。已知2021年7 - 12月实际发电量为18083 kWh,情景1和情景2 2021年7 - 12月模拟结果分别为19810 kWh和20015 kWh。场景1和场景2的实际发电量与模拟结果的差异为1727千瓦时,百分比为8.72%,1931千瓦时,百分比为9.65%。与2020年6个月相比,2021年6个月节省的百分比为56.42%,节省价值为18,783,953卢比。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ANALISIS SISTEM KELISTRIKAN PADA PEMBANGKIT LISTRIK TENAGA SURYA ON-GRID KAPASITAS 25 KWP DI BADAN PERENCANAAN PEMBANGUNAN DAERAH (BAPPEDA) PROVINSI BALI
In the 2020 fiscal year, the Ministry of Energy and Mineral Resources of the Republic ofIndonesia provided PLTS On-Grid grants to the Province of Bali as many as 10 PLTS locationsin Denpasar City. One of them is in the Regional Development Planning Agency (BAPPEDA) ofBali Province with an installed capacity of 25 kWp which is connected to the PLN network.BAPPEDA Bali is an example of the NRE Development Program and the Regional Medium-Term Development (RPJMD) that supports the PV mini-grid sector. This research wasconducted to determine the performance of the PLTS electrical system and to simulate theresults of PLTS production using Helioscope software so that it can compare the simulationresults of 2 scenarios with real conditions to determine the level of effectiveness in savingelectricity bills and the factors that influence the results of PLTS energy production. The resultsshowed that the potential for electrical energy generated for a year from the simulation ofScenario 1 and Scenario 2 was 38.90MWh and 39.07MWh. It is known that the real energyproduction from July to December 2021 is 18,083 kWh with the simulation results of scenario 1and scenario 2 from July to December 2021 which are 19,810 kWh and 20,015 kWh. Thedifference between real energy production and the simulation results in scenario 1 and scenario2 is 1,727kWh with a percentage of 8.72%, and 1,931kWh with a percentage of 9.65%. Thepercentage of savings obtained for 6 months in 2021 compared to 6 months in 2020 is 56.42%with a saving value of Rp. 18,783,953.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信