资源分配不确定性对并行耦合迭代时间的影响研究

Qilin Tian, Huang Jiakang, Chao-Jung Huang, Zhang Ci, Zhang Yurong, Luo Mingliang, Xiangman Zhou
{"title":"资源分配不确定性对并行耦合迭代时间的影响研究","authors":"Qilin Tian, Huang Jiakang, Chao-Jung Huang, Zhang Ci, Zhang Yurong, Luo Mingliang, Xiangman Zhou","doi":"10.12783/dtetr/mcaee2020/35034","DOIUrl":null,"url":null,"abstract":"Aiming at the problem that the uncertainty of resource allocation can lead to the increase of the parallel iteration time of the coupled task set, a parallel iteration time optimization model under the uncertainty of resource allocation was constructed based on the analysis of the resource allocation uncertainty and iteration time model in the parallel iteration. Then the analytic hierarchy process (AHP) was introduced, and by determining the AHP model and the resource allocation matrix, an improved parallel iteration time optimization model under the uncertain resource allocation was constructed. Combined with an example of product development process, application research was carried out by applying the MATALB software, thereby verifying that the improved optimization model can reduce the parallel iteration time of the coupled task set under uncertain resource allocation. This research provides a reference for optimizing resource allocation and reducing time in product design and development.","PeriodicalId":11264,"journal":{"name":"DEStech Transactions on Engineering and Technology Research","volume":"27 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-10-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research on the Influence of Resource Allocation Uncertainty on Parallel Coupling Iteration Time\",\"authors\":\"Qilin Tian, Huang Jiakang, Chao-Jung Huang, Zhang Ci, Zhang Yurong, Luo Mingliang, Xiangman Zhou\",\"doi\":\"10.12783/dtetr/mcaee2020/35034\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Aiming at the problem that the uncertainty of resource allocation can lead to the increase of the parallel iteration time of the coupled task set, a parallel iteration time optimization model under the uncertainty of resource allocation was constructed based on the analysis of the resource allocation uncertainty and iteration time model in the parallel iteration. Then the analytic hierarchy process (AHP) was introduced, and by determining the AHP model and the resource allocation matrix, an improved parallel iteration time optimization model under the uncertain resource allocation was constructed. Combined with an example of product development process, application research was carried out by applying the MATALB software, thereby verifying that the improved optimization model can reduce the parallel iteration time of the coupled task set under uncertain resource allocation. This research provides a reference for optimizing resource allocation and reducing time in product design and development.\",\"PeriodicalId\":11264,\"journal\":{\"name\":\"DEStech Transactions on Engineering and Technology Research\",\"volume\":\"27 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-10-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"DEStech Transactions on Engineering and Technology Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.12783/dtetr/mcaee2020/35034\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"DEStech Transactions on Engineering and Technology Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12783/dtetr/mcaee2020/35034","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

针对资源分配的不确定性导致耦合任务集并行迭代时间增加的问题,在分析并行迭代中的资源分配不确定性和迭代时间模型的基础上,构建了资源分配不确定性下的并行迭代时间优化模型。然后引入层次分析法(AHP),通过确定AHP模型和资源分配矩阵,构建了不确定资源分配下改进的并行迭代时间优化模型;结合产品开发过程实例,应用MATALB软件进行了应用研究,验证了改进的优化模型能够在资源分配不确定的情况下减少耦合任务集的并行迭代时间。该研究为优化资源配置、缩短产品设计开发时间提供了参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Research on the Influence of Resource Allocation Uncertainty on Parallel Coupling Iteration Time
Aiming at the problem that the uncertainty of resource allocation can lead to the increase of the parallel iteration time of the coupled task set, a parallel iteration time optimization model under the uncertainty of resource allocation was constructed based on the analysis of the resource allocation uncertainty and iteration time model in the parallel iteration. Then the analytic hierarchy process (AHP) was introduced, and by determining the AHP model and the resource allocation matrix, an improved parallel iteration time optimization model under the uncertain resource allocation was constructed. Combined with an example of product development process, application research was carried out by applying the MATALB software, thereby verifying that the improved optimization model can reduce the parallel iteration time of the coupled task set under uncertain resource allocation. This research provides a reference for optimizing resource allocation and reducing time in product design and development.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信