{"title":"组织约束和资金约束下的购物中心建设优化","authors":"I. Meneiliuk, O. Nikiforov","doi":"10.26906/znp.2019.52.1699","DOIUrl":null,"url":null,"abstract":"The article presents the results of optimizing the construction duration of the object and the average monthly financing intensityof the shopping center construction under organizational and financial constraints, namely: the work processes alignment– 68-76%; the maximum monthly financing intensity – 40 million UAN; number of work brigades – 1-2; the maximum constructionduration – 360 days. There were developed the method for optimizing and the results of numerical modeling of organizationaland financial decisions were obtained. The most efficient models of construction were identified by graphicalway under limited conditions of their implementation.","PeriodicalId":32910,"journal":{"name":"Zbirnik naukovikh prats'' Seriia Galuzeve mashinobuduvannia budivnitstvo","volume":"11 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-07-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimization of shopping center construction under organizational and financial constraints\",\"authors\":\"I. Meneiliuk, O. Nikiforov\",\"doi\":\"10.26906/znp.2019.52.1699\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The article presents the results of optimizing the construction duration of the object and the average monthly financing intensityof the shopping center construction under organizational and financial constraints, namely: the work processes alignment– 68-76%; the maximum monthly financing intensity – 40 million UAN; number of work brigades – 1-2; the maximum constructionduration – 360 days. There were developed the method for optimizing and the results of numerical modeling of organizationaland financial decisions were obtained. The most efficient models of construction were identified by graphicalway under limited conditions of their implementation.\",\"PeriodicalId\":32910,\"journal\":{\"name\":\"Zbirnik naukovikh prats'' Seriia Galuzeve mashinobuduvannia budivnitstvo\",\"volume\":\"11 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-07-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Zbirnik naukovikh prats'' Seriia Galuzeve mashinobuduvannia budivnitstvo\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.26906/znp.2019.52.1699\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Zbirnik naukovikh prats'' Seriia Galuzeve mashinobuduvannia budivnitstvo","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26906/znp.2019.52.1699","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Optimization of shopping center construction under organizational and financial constraints
The article presents the results of optimizing the construction duration of the object and the average monthly financing intensityof the shopping center construction under organizational and financial constraints, namely: the work processes alignment– 68-76%; the maximum monthly financing intensity – 40 million UAN; number of work brigades – 1-2; the maximum constructionduration – 360 days. There were developed the method for optimizing and the results of numerical modeling of organizationaland financial decisions were obtained. The most efficient models of construction were identified by graphicalway under limited conditions of their implementation.