{"title":"南海某台风破坏油田的快速恢复生产","authors":"Mao Jiayou","doi":"10.2118/172999-PA","DOIUrl":null,"url":null,"abstract":"Summary The Huizhou oil field is located at the Pearl River mouth in the continental-shelf region of the South China Sea, with an average water depth of approximately 117 m. The oil field’s main facilities include eight fixed-jacket platforms, two subsea-production wellheads (HZ32-5 and HZ26-1N), and one floating production, storage, and offloading (FPSO) vessel (Nanhai Faxian). Fig. 1 illustrates the general layout of the field. The peak daily oil production is approximately 70,000 BOPD. In September 2009, after a strong typhoon (Koppu) passed over this oil field, the FPSO vessel’s permanent mooring system was seriously damaged. All production risers connected to the FPSO vessel’s turret were ruptured, and production was forced to shut down. To resume production in a fast-track manner, several engineering cases were studied. Finally, the concept of using a dynamic-positioning (DP) FPSO vessel to temporarily resume production was selected. Detailed design and operability analysis was performed by the owner of the DP-FPSO vessel, and various flexible pipes and other materials were sourced quickly in local and international markets. The offshore installation took place throughout the harsh winter monsoonal season from November 2009 to February 2010. Finally, the field was brought back into production after 5.5 months of production stoppage. The DPFPSO system operated for more than 18 months and proved safe and effective. This was a world record time for an FPSO vessel operated in DP mode.","PeriodicalId":19446,"journal":{"name":"Oil and gas facilities","volume":"373 1","pages":"66-71"},"PeriodicalIF":0.0000,"publicationDate":"2014-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Fast Production Recovery of a Typhoon-Damaged Oil Field in the South China Sea\",\"authors\":\"Mao Jiayou\",\"doi\":\"10.2118/172999-PA\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Summary The Huizhou oil field is located at the Pearl River mouth in the continental-shelf region of the South China Sea, with an average water depth of approximately 117 m. The oil field’s main facilities include eight fixed-jacket platforms, two subsea-production wellheads (HZ32-5 and HZ26-1N), and one floating production, storage, and offloading (FPSO) vessel (Nanhai Faxian). Fig. 1 illustrates the general layout of the field. The peak daily oil production is approximately 70,000 BOPD. In September 2009, after a strong typhoon (Koppu) passed over this oil field, the FPSO vessel’s permanent mooring system was seriously damaged. All production risers connected to the FPSO vessel’s turret were ruptured, and production was forced to shut down. To resume production in a fast-track manner, several engineering cases were studied. Finally, the concept of using a dynamic-positioning (DP) FPSO vessel to temporarily resume production was selected. Detailed design and operability analysis was performed by the owner of the DP-FPSO vessel, and various flexible pipes and other materials were sourced quickly in local and international markets. The offshore installation took place throughout the harsh winter monsoonal season from November 2009 to February 2010. Finally, the field was brought back into production after 5.5 months of production stoppage. The DPFPSO system operated for more than 18 months and proved safe and effective. This was a world record time for an FPSO vessel operated in DP mode.\",\"PeriodicalId\":19446,\"journal\":{\"name\":\"Oil and gas facilities\",\"volume\":\"373 1\",\"pages\":\"66-71\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Oil and gas facilities\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/172999-PA\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Oil and gas facilities","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/172999-PA","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

惠州油田位于南海陆架区珠江口,平均水深约117米。该油田的主要设施包括8个固定导管架平台,2个海底生产井口(HZ32-5和HZ26-1N)和1艘浮式生产储油卸油船(南海法仙)。图1显示了该场地的总体布局。最高日产量约为7万桶/天。2009年9月,强台风Koppu经过该油田后,FPSO船的永久系泊系统严重受损。所有连接到FPSO船转塔的生产立管都破裂,生产被迫关闭。为了快速恢复生产,对几个工程实例进行了研究。最后,选择了使用动态定位(DP) FPSO船暂时恢复生产的概念。DP-FPSO船的船东进行了详细的设计和可操作性分析,并在当地和国际市场上迅速采购了各种柔性管和其他材料。海上安装在2009年11月至2010年2月的严冬季风季节进行。在停产5.5个月后,该油田终于恢复了生产。DPFPSO系统运行了18个多月,证明是安全有效的。这是FPSO船舶在DP模式下运行的世界纪录。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Fast Production Recovery of a Typhoon-Damaged Oil Field in the South China Sea
Summary The Huizhou oil field is located at the Pearl River mouth in the continental-shelf region of the South China Sea, with an average water depth of approximately 117 m. The oil field’s main facilities include eight fixed-jacket platforms, two subsea-production wellheads (HZ32-5 and HZ26-1N), and one floating production, storage, and offloading (FPSO) vessel (Nanhai Faxian). Fig. 1 illustrates the general layout of the field. The peak daily oil production is approximately 70,000 BOPD. In September 2009, after a strong typhoon (Koppu) passed over this oil field, the FPSO vessel’s permanent mooring system was seriously damaged. All production risers connected to the FPSO vessel’s turret were ruptured, and production was forced to shut down. To resume production in a fast-track manner, several engineering cases were studied. Finally, the concept of using a dynamic-positioning (DP) FPSO vessel to temporarily resume production was selected. Detailed design and operability analysis was performed by the owner of the DP-FPSO vessel, and various flexible pipes and other materials were sourced quickly in local and international markets. The offshore installation took place throughout the harsh winter monsoonal season from November 2009 to February 2010. Finally, the field was brought back into production after 5.5 months of production stoppage. The DPFPSO system operated for more than 18 months and proved safe and effective. This was a world record time for an FPSO vessel operated in DP mode.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信