T. Aoki, K. Sugihara, H. Suwa, T. Negishi, Takeshi Morita
{"title":"事故损坏核电站退役安全功能可靠性评价与风险管理研究","authors":"T. Aoki, K. Sugihara, H. Suwa, T. Negishi, Takeshi Morita","doi":"10.3327/TAESJ.J17.007","DOIUrl":null,"url":null,"abstract":"Takayuki AOKI, Kazuhiro SUGIHARA, Hidekazu SUWA, Takayuki NEGISHI and Takeshi MORITA Graduate School of Engineering, Tohoku University, 6‒6‒01‒2 Aoba, Aramaki, Aoba-ku, Sendai 980‒8579, Japan The Japan Atomic Power Company, Mitoshirocho Bldg., 1‒1 Kanda-Mitoshiro-cho, Chiyoda-ku, Tokyo 101‒0053, Japan Nuclear Engineering and Services Company, Ochanomizu Kyoun Building 11 floor, 2 Chome-2, Kandasurugadai, Chiyoda-ku, Tokyo 101‒0062, Japan (Received July 4, 2017; accepted in revised form March 2, 2018; published online May 14, 2018)","PeriodicalId":8595,"journal":{"name":"Atomic Energy Society of Japan","volume":"31 1","pages":"86-97"},"PeriodicalIF":0.0000,"publicationDate":"2018-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Study on Evaluation of Safety Function Reliability and Risk Management during the Decommissioning of an Accident-damaged Nuclear Power Plant\",\"authors\":\"T. Aoki, K. Sugihara, H. Suwa, T. Negishi, Takeshi Morita\",\"doi\":\"10.3327/TAESJ.J17.007\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Takayuki AOKI, Kazuhiro SUGIHARA, Hidekazu SUWA, Takayuki NEGISHI and Takeshi MORITA Graduate School of Engineering, Tohoku University, 6‒6‒01‒2 Aoba, Aramaki, Aoba-ku, Sendai 980‒8579, Japan The Japan Atomic Power Company, Mitoshirocho Bldg., 1‒1 Kanda-Mitoshiro-cho, Chiyoda-ku, Tokyo 101‒0053, Japan Nuclear Engineering and Services Company, Ochanomizu Kyoun Building 11 floor, 2 Chome-2, Kandasurugadai, Chiyoda-ku, Tokyo 101‒0062, Japan (Received July 4, 2017; accepted in revised form March 2, 2018; published online May 14, 2018)\",\"PeriodicalId\":8595,\"journal\":{\"name\":\"Atomic Energy Society of Japan\",\"volume\":\"31 1\",\"pages\":\"86-97\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Atomic Energy Society of Japan\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3327/TAESJ.J17.007\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Atomic Energy Society of Japan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3327/TAESJ.J17.007","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
日本东北大学工学研究生院,青木孝之,杉原和弘,SUWA秀和,根岸孝之,森田武,6-6-01-2,仙台市青台区阿木木,青叶,980-8579,日本;日本原子能公司,三茂町大厦,1-1,千代田区,东京,101-0053;日本核工程与服务公司,日本,东京,千代田区,kanda - urugaai, kam -2 2楼11层,东京,101-0062(2017年7月4日收到;2018年3月2日以修改后的形式接受;2018年5月14日在线发布)
Study on Evaluation of Safety Function Reliability and Risk Management during the Decommissioning of an Accident-damaged Nuclear Power Plant
Takayuki AOKI, Kazuhiro SUGIHARA, Hidekazu SUWA, Takayuki NEGISHI and Takeshi MORITA Graduate School of Engineering, Tohoku University, 6‒6‒01‒2 Aoba, Aramaki, Aoba-ku, Sendai 980‒8579, Japan The Japan Atomic Power Company, Mitoshirocho Bldg., 1‒1 Kanda-Mitoshiro-cho, Chiyoda-ku, Tokyo 101‒0053, Japan Nuclear Engineering and Services Company, Ochanomizu Kyoun Building 11 floor, 2 Chome-2, Kandasurugadai, Chiyoda-ku, Tokyo 101‒0062, Japan (Received July 4, 2017; accepted in revised form March 2, 2018; published online May 14, 2018)