{"title":"铁路自动化与远程机械继电器设备更换时机的计算","authors":"S. Bochkarev","doi":"10.17587/it.29.437-444","DOIUrl":null,"url":null,"abstract":"In 2021, at the Obukhovo station of the Oktyabrskaya railway. testing of the technology for counting the number of operations of relay equipment began. The results of testing the technology at the Obukhovo station showed that relay equipment with a high intensity of operation generates faster the standard number of operations specified in the technical specifications for the equipment. Relay equipment with a high intensity of operation needs to be replaced earlier than the scheduled period, and equipment with a low intensity of operation needs to be replaced less often than the scheduled period. The routine method of replacing relay equipment does not take into account the intensity of its work. The article proposes a scientific approach that allows you to manage the resource of the relay equipment of railway automation and telemechanic at the stage of its operation based on the calculation of the timing of its replacement. To calculate the timing of the replacement of relay equipment, objective data on the values of their actual number of operations are used. The article proposes the calculation of the timing of the replacement of relay equipment based on its characteristics, service life under technical conditions, scheduled terms in the instructions, and the intensity of its work. The calculation of the cost of failure and maintenance of relay equipment over the entire service life is given to determine the optimal replacement period for relay equipment, for which the replacement period occurs earlier than the scheduled period. The calculation of the timing of the replacement of relay equipment makes it possible to switch from the scheduled maintenance method to maintenance based on the actual state and ensure the transition to address planning. This will reduce labor costs for maintenance and the risk of relay equipment failures.","PeriodicalId":37476,"journal":{"name":"Radioelektronika, Nanosistemy, Informacionnye Tehnologii","volume":"76 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-08-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Calculation of the Timing of the Replacement of Relay Equipment for Railway Automation and Telemechanic\",\"authors\":\"S. Bochkarev\",\"doi\":\"10.17587/it.29.437-444\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In 2021, at the Obukhovo station of the Oktyabrskaya railway. testing of the technology for counting the number of operations of relay equipment began. The results of testing the technology at the Obukhovo station showed that relay equipment with a high intensity of operation generates faster the standard number of operations specified in the technical specifications for the equipment. Relay equipment with a high intensity of operation needs to be replaced earlier than the scheduled period, and equipment with a low intensity of operation needs to be replaced less often than the scheduled period. The routine method of replacing relay equipment does not take into account the intensity of its work. The article proposes a scientific approach that allows you to manage the resource of the relay equipment of railway automation and telemechanic at the stage of its operation based on the calculation of the timing of its replacement. To calculate the timing of the replacement of relay equipment, objective data on the values of their actual number of operations are used. The article proposes the calculation of the timing of the replacement of relay equipment based on its characteristics, service life under technical conditions, scheduled terms in the instructions, and the intensity of its work. The calculation of the cost of failure and maintenance of relay equipment over the entire service life is given to determine the optimal replacement period for relay equipment, for which the replacement period occurs earlier than the scheduled period. The calculation of the timing of the replacement of relay equipment makes it possible to switch from the scheduled maintenance method to maintenance based on the actual state and ensure the transition to address planning. This will reduce labor costs for maintenance and the risk of relay equipment failures.\",\"PeriodicalId\":37476,\"journal\":{\"name\":\"Radioelektronika, Nanosistemy, Informacionnye Tehnologii\",\"volume\":\"76 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-08-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Radioelektronika, Nanosistemy, Informacionnye Tehnologii\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.17587/it.29.437-444\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Materials Science\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Radioelektronika, Nanosistemy, Informacionnye Tehnologii","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17587/it.29.437-444","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Materials Science","Score":null,"Total":0}
Calculation of the Timing of the Replacement of Relay Equipment for Railway Automation and Telemechanic
In 2021, at the Obukhovo station of the Oktyabrskaya railway. testing of the technology for counting the number of operations of relay equipment began. The results of testing the technology at the Obukhovo station showed that relay equipment with a high intensity of operation generates faster the standard number of operations specified in the technical specifications for the equipment. Relay equipment with a high intensity of operation needs to be replaced earlier than the scheduled period, and equipment with a low intensity of operation needs to be replaced less often than the scheduled period. The routine method of replacing relay equipment does not take into account the intensity of its work. The article proposes a scientific approach that allows you to manage the resource of the relay equipment of railway automation and telemechanic at the stage of its operation based on the calculation of the timing of its replacement. To calculate the timing of the replacement of relay equipment, objective data on the values of their actual number of operations are used. The article proposes the calculation of the timing of the replacement of relay equipment based on its characteristics, service life under technical conditions, scheduled terms in the instructions, and the intensity of its work. The calculation of the cost of failure and maintenance of relay equipment over the entire service life is given to determine the optimal replacement period for relay equipment, for which the replacement period occurs earlier than the scheduled period. The calculation of the timing of the replacement of relay equipment makes it possible to switch from the scheduled maintenance method to maintenance based on the actual state and ensure the transition to address planning. This will reduce labor costs for maintenance and the risk of relay equipment failures.
期刊介绍:
Journal “Radioelectronics. Nanosystems. Information Technologies” (abbr RENSIT) publishes original articles, reviews and brief reports, not previously published, on topical problems in radioelectronics (including biomedical) and fundamentals of information, nano- and biotechnologies and adjacent areas of physics and mathematics. The authors of the journal are academicians, corresponding members and foreign members of the Russian Academy of Natural Sciences (RANS) and their colleagues, as well as other russian and foreign authors on the proposal of the members of RANS, which can be obtained by the author before sending articles to the editor or after its arrival on the recommendation of a member of the editorial board or another member of the RANS, who gave the opinion on the article at the request of the editior. The editors will accept articles in both Russian and English languages. Articles are internally peer reviewed (double-blind peer review) by members of the Editorial Board. Some articles undergo external review, if necessary. Designed for researchers, graduate students, physics students of senior courses and teachers. It turns out 2 times a year (that includes 2 rooms)