压力瞬态分析的替代方法

F. Franco, A. Rincón, M. Useche
{"title":"压力瞬态分析的替代方法","authors":"F. Franco, A. Rincón, M. Useche","doi":"10.2118/193261-ms","DOIUrl":null,"url":null,"abstract":"\n An alternative method is presented for estimation of reservoir properties that are usually estimated in a classic buildup test are obtained using flowing conditions thereby eliminating the need for shut-in periods and measurement of static pressure data.\n The proposed approach is based on the effect of two consecutive periods of production with different rates in a single well-reservoir model. The well is initially produced at a constant rate until pseudo-steady state conditions are reached, followed by a different rate that will generate a pressure transient response measured at bottom of the wellbore. A mathematical formulation is applied to estimate the reservoir pressure as function of radius of investigation, which is equal to the bottom hole pressure observed during a shut-in buildup test.\n A single well-reservoir model with known petrophysical parameters, fluid properties, pressure and temperature is used as a reference to evaluate the proposed methodology. The reservoir (i.e. the simulation model) is tested by applying two methods: the first one, is the simulation of a classic buildup test, and the second one, is the simulation of two flow rates periods according to the new theory; the results are compared with the model of reference, calculating percentage of error for permeability, skin, and average reservoir pressure. Additionally, it is demonstrated that a shut-in period is not required to obtain data equivalent to a classic buildup test since it is possible to calculate it from dynamic behavior.\n The ability to complete a well pressure transient analysis test from flowing conditions and provide valid and reliable results has a direct impact in reduction of cost and deferred production for companies involved in oil and gas operations.","PeriodicalId":11208,"journal":{"name":"Day 2 Tue, November 13, 2018","volume":"40 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Alternative Method for Pressure Transient Analysis\",\"authors\":\"F. Franco, A. Rincón, M. Useche\",\"doi\":\"10.2118/193261-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n An alternative method is presented for estimation of reservoir properties that are usually estimated in a classic buildup test are obtained using flowing conditions thereby eliminating the need for shut-in periods and measurement of static pressure data.\\n The proposed approach is based on the effect of two consecutive periods of production with different rates in a single well-reservoir model. The well is initially produced at a constant rate until pseudo-steady state conditions are reached, followed by a different rate that will generate a pressure transient response measured at bottom of the wellbore. A mathematical formulation is applied to estimate the reservoir pressure as function of radius of investigation, which is equal to the bottom hole pressure observed during a shut-in buildup test.\\n A single well-reservoir model with known petrophysical parameters, fluid properties, pressure and temperature is used as a reference to evaluate the proposed methodology. The reservoir (i.e. the simulation model) is tested by applying two methods: the first one, is the simulation of a classic buildup test, and the second one, is the simulation of two flow rates periods according to the new theory; the results are compared with the model of reference, calculating percentage of error for permeability, skin, and average reservoir pressure. Additionally, it is demonstrated that a shut-in period is not required to obtain data equivalent to a classic buildup test since it is possible to calculate it from dynamic behavior.\\n The ability to complete a well pressure transient analysis test from flowing conditions and provide valid and reliable results has a direct impact in reduction of cost and deferred production for companies involved in oil and gas operations.\",\"PeriodicalId\":11208,\"journal\":{\"name\":\"Day 2 Tue, November 13, 2018\",\"volume\":\"40 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-11-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, November 13, 2018\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/193261-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, November 13, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/193261-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文提出了一种可替代的储层性质估计方法,这种方法通常是通过使用流动条件来估计的,从而消除了关井期和静压数据测量的需要。所提出的方法是基于在单井-油藏模型中以不同速率连续两期生产的影响。该井最初以恒定速率生产,直到达到准稳态条件,然后以不同的速率生产,从而在井筒底部测量压力瞬态响应。应用数学公式来估计油藏压力作为研究半径的函数,其等于关井建井测试中观察到的井底压力。以已知岩石物理参数、流体性质、压力和温度的单井-储层模型为参考,对所提出的方法进行了评价。采用两种方法对储层(即模拟模型)进行测试:第一种方法是模拟经典堆积试验,第二种方法是根据新理论模拟两个流量周期;结果与参考模型进行了比较,计算了渗透率、表皮和平均储层压力的误差百分比。此外,由于可以根据动态特性计算数据,因此不需要关井时间来获得与经典累积测试等效的数据。能够根据流动状况完成井压瞬态分析测试,并提供有效可靠的结果,对油气公司降低成本和推迟生产具有直接影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Alternative Method for Pressure Transient Analysis
An alternative method is presented for estimation of reservoir properties that are usually estimated in a classic buildup test are obtained using flowing conditions thereby eliminating the need for shut-in periods and measurement of static pressure data. The proposed approach is based on the effect of two consecutive periods of production with different rates in a single well-reservoir model. The well is initially produced at a constant rate until pseudo-steady state conditions are reached, followed by a different rate that will generate a pressure transient response measured at bottom of the wellbore. A mathematical formulation is applied to estimate the reservoir pressure as function of radius of investigation, which is equal to the bottom hole pressure observed during a shut-in buildup test. A single well-reservoir model with known petrophysical parameters, fluid properties, pressure and temperature is used as a reference to evaluate the proposed methodology. The reservoir (i.e. the simulation model) is tested by applying two methods: the first one, is the simulation of a classic buildup test, and the second one, is the simulation of two flow rates periods according to the new theory; the results are compared with the model of reference, calculating percentage of error for permeability, skin, and average reservoir pressure. Additionally, it is demonstrated that a shut-in period is not required to obtain data equivalent to a classic buildup test since it is possible to calculate it from dynamic behavior. The ability to complete a well pressure transient analysis test from flowing conditions and provide valid and reliable results has a direct impact in reduction of cost and deferred production for companies involved in oil and gas operations.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信