Petrus In ‘T Panhuis, S. Mahajan, C. Prin, Ahmed Al Ajmi
{"title":"静、动态井眼强化对阿曼石油开发井眼规划的影响","authors":"Petrus In ‘T Panhuis, S. Mahajan, C. Prin, Ahmed Al Ajmi","doi":"10.2118/207239-ms","DOIUrl":null,"url":null,"abstract":"\n Formation Integrity Tests (FIT) or Leak-Off Tests (LOT) are common techniques to reduce the uncertainty in Fracture Gradient (FG) prediction for well planning, but are usually performed at the casing shoe. This article will discuss the first examples of open-hole LOT and FIT in Petroleum Development Oman (PDO), targeting depleted formations in water injector or oil producer wells. The data was used to justify continued drilling of slim wells with two casing strings, where otherwise three casing strings would be required, provided dynamic wellbore strengthening is applied.\n In addition, the concept of static wellbore strengthening was also trialed for the first time in Oman, using the hesitation squeeze testing procedure, by which the effective leak-off pressure was incrementally increased to match the maximum ECD required for cementing.","PeriodicalId":10981,"journal":{"name":"Day 4 Thu, November 18, 2021","volume":"73 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Impact of Static and Dynamic Wellbore Strengthening on Well Planning in Petroleum Development Oman\",\"authors\":\"Petrus In ‘T Panhuis, S. Mahajan, C. Prin, Ahmed Al Ajmi\",\"doi\":\"10.2118/207239-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Formation Integrity Tests (FIT) or Leak-Off Tests (LOT) are common techniques to reduce the uncertainty in Fracture Gradient (FG) prediction for well planning, but are usually performed at the casing shoe. This article will discuss the first examples of open-hole LOT and FIT in Petroleum Development Oman (PDO), targeting depleted formations in water injector or oil producer wells. The data was used to justify continued drilling of slim wells with two casing strings, where otherwise three casing strings would be required, provided dynamic wellbore strengthening is applied.\\n In addition, the concept of static wellbore strengthening was also trialed for the first time in Oman, using the hesitation squeeze testing procedure, by which the effective leak-off pressure was incrementally increased to match the maximum ECD required for cementing.\",\"PeriodicalId\":10981,\"journal\":{\"name\":\"Day 4 Thu, November 18, 2021\",\"volume\":\"73 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 4 Thu, November 18, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/207239-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Thu, November 18, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/207239-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Impact of Static and Dynamic Wellbore Strengthening on Well Planning in Petroleum Development Oman
Formation Integrity Tests (FIT) or Leak-Off Tests (LOT) are common techniques to reduce the uncertainty in Fracture Gradient (FG) prediction for well planning, but are usually performed at the casing shoe. This article will discuss the first examples of open-hole LOT and FIT in Petroleum Development Oman (PDO), targeting depleted formations in water injector or oil producer wells. The data was used to justify continued drilling of slim wells with two casing strings, where otherwise three casing strings would be required, provided dynamic wellbore strengthening is applied.
In addition, the concept of static wellbore strengthening was also trialed for the first time in Oman, using the hesitation squeeze testing procedure, by which the effective leak-off pressure was incrementally increased to match the maximum ECD required for cementing.