静、动态井眼强化对阿曼石油开发井眼规划的影响

Petrus In ‘T Panhuis, S. Mahajan, C. Prin, Ahmed Al Ajmi
{"title":"静、动态井眼强化对阿曼石油开发井眼规划的影响","authors":"Petrus In ‘T Panhuis, S. Mahajan, C. Prin, Ahmed Al Ajmi","doi":"10.2118/207239-ms","DOIUrl":null,"url":null,"abstract":"\n Formation Integrity Tests (FIT) or Leak-Off Tests (LOT) are common techniques to reduce the uncertainty in Fracture Gradient (FG) prediction for well planning, but are usually performed at the casing shoe. This article will discuss the first examples of open-hole LOT and FIT in Petroleum Development Oman (PDO), targeting depleted formations in water injector or oil producer wells. The data was used to justify continued drilling of slim wells with two casing strings, where otherwise three casing strings would be required, provided dynamic wellbore strengthening is applied.\n In addition, the concept of static wellbore strengthening was also trialed for the first time in Oman, using the hesitation squeeze testing procedure, by which the effective leak-off pressure was incrementally increased to match the maximum ECD required for cementing.","PeriodicalId":10981,"journal":{"name":"Day 4 Thu, November 18, 2021","volume":"73 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Impact of Static and Dynamic Wellbore Strengthening on Well Planning in Petroleum Development Oman\",\"authors\":\"Petrus In ‘T Panhuis, S. Mahajan, C. Prin, Ahmed Al Ajmi\",\"doi\":\"10.2118/207239-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Formation Integrity Tests (FIT) or Leak-Off Tests (LOT) are common techniques to reduce the uncertainty in Fracture Gradient (FG) prediction for well planning, but are usually performed at the casing shoe. This article will discuss the first examples of open-hole LOT and FIT in Petroleum Development Oman (PDO), targeting depleted formations in water injector or oil producer wells. The data was used to justify continued drilling of slim wells with two casing strings, where otherwise three casing strings would be required, provided dynamic wellbore strengthening is applied.\\n In addition, the concept of static wellbore strengthening was also trialed for the first time in Oman, using the hesitation squeeze testing procedure, by which the effective leak-off pressure was incrementally increased to match the maximum ECD required for cementing.\",\"PeriodicalId\":10981,\"journal\":{\"name\":\"Day 4 Thu, November 18, 2021\",\"volume\":\"73 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 4 Thu, November 18, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/207239-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Thu, November 18, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/207239-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

地层完整性测试(FIT)或泄漏测试(LOT)是减少裂缝梯度(FG)预测不确定性的常用技术,但通常在套管鞋处进行。本文将讨论阿曼石油开发公司(PDO)的裸眼LOT和FIT的第一个例子,目标是注水井或采油井中的衰竭地层。这些数据被用来证明使用两套管柱的小井的持续钻井,否则需要三套管柱,只要施加动态井眼加固。此外,阿曼也首次尝试了静态井筒强化的概念,使用了犹豫挤压测试程序,通过该程序,有效泄漏压力逐渐增加,以匹配固井所需的最大ECD。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Impact of Static and Dynamic Wellbore Strengthening on Well Planning in Petroleum Development Oman
Formation Integrity Tests (FIT) or Leak-Off Tests (LOT) are common techniques to reduce the uncertainty in Fracture Gradient (FG) prediction for well planning, but are usually performed at the casing shoe. This article will discuss the first examples of open-hole LOT and FIT in Petroleum Development Oman (PDO), targeting depleted formations in water injector or oil producer wells. The data was used to justify continued drilling of slim wells with two casing strings, where otherwise three casing strings would be required, provided dynamic wellbore strengthening is applied. In addition, the concept of static wellbore strengthening was also trialed for the first time in Oman, using the hesitation squeeze testing procedure, by which the effective leak-off pressure was incrementally increased to match the maximum ECD required for cementing.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信