{"title":"考虑运行不确定性的多扇区块状溶洞矿同步生产调度","authors":"Shahrokh Paravarzar, H. Askari-Nasab, Y. Pourrahimian, X. Emery","doi":"10.1080/25726668.2021.1872261","DOIUrl":null,"url":null,"abstract":"ABSTRACT The main objective of this study is to provide a practical and near-optimal mine production schedule for block caving operations considering operational uncertainty. The problem is defined in the context of goal programming optimization to meet the operational objectives, including tonnage and grade as daily production targets. The considered operational constraints include drawpoints and ore pass design, draw rate, mine production, and transportation capacities in different operational levels, tonnage and grade constraints, and mine production targets in the presence of several mining sectors. The developed model is verified and validated using historical operational data obtained from an actual block caving operation. The practicality and flexibility of the framework are examined through three different operational scenarios and compared with the real block caving operation mine plans and historical production data.","PeriodicalId":44166,"journal":{"name":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","volume":null,"pages":null},"PeriodicalIF":1.8000,"publicationDate":"2021-01-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Simultaneous multi-sector block cave mine production scheduling considering operational uncertainties\",\"authors\":\"Shahrokh Paravarzar, H. Askari-Nasab, Y. Pourrahimian, X. Emery\",\"doi\":\"10.1080/25726668.2021.1872261\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT The main objective of this study is to provide a practical and near-optimal mine production schedule for block caving operations considering operational uncertainty. The problem is defined in the context of goal programming optimization to meet the operational objectives, including tonnage and grade as daily production targets. The considered operational constraints include drawpoints and ore pass design, draw rate, mine production, and transportation capacities in different operational levels, tonnage and grade constraints, and mine production targets in the presence of several mining sectors. The developed model is verified and validated using historical operational data obtained from an actual block caving operation. The practicality and flexibility of the framework are examined through three different operational scenarios and compared with the real block caving operation mine plans and historical production data.\",\"PeriodicalId\":44166,\"journal\":{\"name\":\"Mining Technology-Transactions of the Institutions of Mining and Metallurgy\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.8000,\"publicationDate\":\"2021-01-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Mining Technology-Transactions of the Institutions of Mining and Metallurgy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/25726668.2021.1872261\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MINING & MINERAL PROCESSING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/25726668.2021.1872261","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
引用次数: 0

摘要

本研究的主要目的是为考虑作业不确定性的块状崩落作业提供一个实用的、接近最优的矿山生产计划。该问题是在目标规划优化的背景下定义的,以满足运营目标,包括吨位和等级作为每日生产目标。所考虑的作业限制包括抽采点和矿道设计、抽采率、不同作业水平的矿山生产和运输能力、吨位和品位限制以及存在几个采矿部门的矿山生产目标。利用实际块体崩落过程中获得的历史作业数据,对所建立的模型进行了验证。通过三种不同的作业场景,并与实际块体崩落作业方案和历史生产数据进行对比,验证了该框架的实用性和灵活性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Simultaneous multi-sector block cave mine production scheduling considering operational uncertainties
ABSTRACT The main objective of this study is to provide a practical and near-optimal mine production schedule for block caving operations considering operational uncertainty. The problem is defined in the context of goal programming optimization to meet the operational objectives, including tonnage and grade as daily production targets. The considered operational constraints include drawpoints and ore pass design, draw rate, mine production, and transportation capacities in different operational levels, tonnage and grade constraints, and mine production targets in the presence of several mining sectors. The developed model is verified and validated using historical operational data obtained from an actual block caving operation. The practicality and flexibility of the framework are examined through three different operational scenarios and compared with the real block caving operation mine plans and historical production data.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
2.20
自引率
9.10%
发文量
5
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信