直井和水平井二次裂缝定向条件研究

A. Martemyanov, E. Shel, V. Bratov, I. Chebyshev, G. Paderin, I. Bazyrov
{"title":"直井和水平井二次裂缝定向条件研究","authors":"A. Martemyanov, E. Shel, V. Bratov, I. Chebyshev, G. Paderin, I. Bazyrov","doi":"10.2118/196966-ms","DOIUrl":null,"url":null,"abstract":"\n An approach to determine stress field near wellbore with existing hydraulic fracture accounting for rising pressure and fluid filtration along the crack has been developed. An estimations of secondary fracture initiation time near wellbore as well as moment of primary crack growth start have been produced. Factual data about mechanical rock properties, stress state and pore fluid pressure was used. It has been shown finally that reorientation of secondary fracture in the case of vertical well is improbable during reinjection. Calculations were made with various magnitude and rate of pumping pressure increasing, value of pore pressure inside formation and main tectonic stress ratio acting at infinity. Similar analysis in the case of horizontal well demonstrated several alternative mechanisms of secondary fracture initiation: simulteniously with existing crack growth new fractures along and orthogonal to well trajectory may appear. Which of type will become dominant depends on actual geomachanical conditions and primary fracture characteristics. Obtained estimations have been compared with field observations.","PeriodicalId":10977,"journal":{"name":"Day 2 Wed, October 23, 2019","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-10-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Conditions of Secondary Fracture Reorientation for Cases of Vertical and Horizontal Wells\",\"authors\":\"A. Martemyanov, E. Shel, V. Bratov, I. Chebyshev, G. Paderin, I. Bazyrov\",\"doi\":\"10.2118/196966-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n An approach to determine stress field near wellbore with existing hydraulic fracture accounting for rising pressure and fluid filtration along the crack has been developed. An estimations of secondary fracture initiation time near wellbore as well as moment of primary crack growth start have been produced. Factual data about mechanical rock properties, stress state and pore fluid pressure was used. It has been shown finally that reorientation of secondary fracture in the case of vertical well is improbable during reinjection. Calculations were made with various magnitude and rate of pumping pressure increasing, value of pore pressure inside formation and main tectonic stress ratio acting at infinity. Similar analysis in the case of horizontal well demonstrated several alternative mechanisms of secondary fracture initiation: simulteniously with existing crack growth new fractures along and orthogonal to well trajectory may appear. Which of type will become dominant depends on actual geomachanical conditions and primary fracture characteristics. Obtained estimations have been compared with field observations.\",\"PeriodicalId\":10977,\"journal\":{\"name\":\"Day 2 Wed, October 23, 2019\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-10-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Wed, October 23, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/196966-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, October 23, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/196966-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

提出了一种考虑裂缝上升压力和流体沿裂缝渗流的已有水力裂缝确定井筒附近应力场的方法。给出了井筒附近二次裂缝起裂时间和初次裂缝扩展开始时刻的估计。使用了岩石力学性质、应力状态和孔隙流体压力的实际数据。结果表明,直井在回注过程中不可能发生二次裂缝定向。计算了不同的泵注压力增加幅度和速率、作用于无穷远处的地层内孔隙压力值和主构造应力比。对水平井的类似分析显示了几种次生裂缝起裂机制:在裂缝扩展的同时,可能出现沿井眼轨迹或垂直于井眼轨迹的新裂缝。哪种类型将占主导地位取决于实际的地质力学条件和原生裂缝特征。已将所得估计与实地观测进行了比较。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Conditions of Secondary Fracture Reorientation for Cases of Vertical and Horizontal Wells
An approach to determine stress field near wellbore with existing hydraulic fracture accounting for rising pressure and fluid filtration along the crack has been developed. An estimations of secondary fracture initiation time near wellbore as well as moment of primary crack growth start have been produced. Factual data about mechanical rock properties, stress state and pore fluid pressure was used. It has been shown finally that reorientation of secondary fracture in the case of vertical well is improbable during reinjection. Calculations were made with various magnitude and rate of pumping pressure increasing, value of pore pressure inside formation and main tectonic stress ratio acting at infinity. Similar analysis in the case of horizontal well demonstrated several alternative mechanisms of secondary fracture initiation: simulteniously with existing crack growth new fractures along and orthogonal to well trajectory may appear. Which of type will become dominant depends on actual geomachanical conditions and primary fracture characteristics. Obtained estimations have been compared with field observations.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信