{"title":"按顺序供应的物料需求规划:多层次优化方法","authors":"Á. Bányai","doi":"10.24867/jpe-2022-01-025","DOIUrl":null,"url":null,"abstract":"Material requirement planning (MRP) plays an important role in the life of production companies, because it has a great impact on the efficiency of manufacturing operations and it influences the total cost. Just-in-time and just-in-sequence supply offer new solutions to improve the cost-efficiency from inventory holding point of view. Within the frame of this article the author focuses on the build-to-sequence strategy of just-in-sequence supply and demonstrate an integrated approach of material requirement planning. The suggested methodology includes the determination of build-to-sequence orders, the optimisation of material requirement from lead time and cost point of view and determine the optimal sequence of operations to fulfil build-to-sequence demands. The computational results show, that the integrated optimisation leads to an increased cost efficiency, while the required manufacturing operations are performed with a decreased lead time.","PeriodicalId":16024,"journal":{"name":"Journal of Industrial and Production Engineering","volume":null,"pages":null},"PeriodicalIF":4.0000,"publicationDate":"2022-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"MATERIAL REQUIREMENT PLANNING FOR BUILD-TO-SEQUENCE SUPPLY: A MULTI-LEVEL OPTIMISATION APPROACH\",\"authors\":\"Á. Bányai\",\"doi\":\"10.24867/jpe-2022-01-025\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Material requirement planning (MRP) plays an important role in the life of production companies, because it has a great impact on the efficiency of manufacturing operations and it influences the total cost. Just-in-time and just-in-sequence supply offer new solutions to improve the cost-efficiency from inventory holding point of view. Within the frame of this article the author focuses on the build-to-sequence strategy of just-in-sequence supply and demonstrate an integrated approach of material requirement planning. The suggested methodology includes the determination of build-to-sequence orders, the optimisation of material requirement from lead time and cost point of view and determine the optimal sequence of operations to fulfil build-to-sequence demands. The computational results show, that the integrated optimisation leads to an increased cost efficiency, while the required manufacturing operations are performed with a decreased lead time.\",\"PeriodicalId\":16024,\"journal\":{\"name\":\"Journal of Industrial and Production Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":4.0000,\"publicationDate\":\"2022-06-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Industrial and Production Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24867/jpe-2022-01-025\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Industrial and Production Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24867/jpe-2022-01-025","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

摘要

物料需求计划(MRP)在生产企业的生命周期中扮演着重要的角色,因为它对制造作业的效率有很大的影响,它影响着总成本。从库存持有的角度来看,准时化和有序化供应为提高成本效益提供了新的解决方案。在这篇文章的框架内,作者着重于按顺序构建just-in-sequence供应策略,并演示了一种材料需求计划的集成方法。建议的方法包括确定按顺序建造的订单,从交货时间和成本的角度优化材料需求,并确定最佳的操作顺序以满足按顺序建造的需求。计算结果表明,集成优化导致成本效率提高,同时所需的制造操作在更短的交货时间内完成。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
MATERIAL REQUIREMENT PLANNING FOR BUILD-TO-SEQUENCE SUPPLY: A MULTI-LEVEL OPTIMISATION APPROACH
Material requirement planning (MRP) plays an important role in the life of production companies, because it has a great impact on the efficiency of manufacturing operations and it influences the total cost. Just-in-time and just-in-sequence supply offer new solutions to improve the cost-efficiency from inventory holding point of view. Within the frame of this article the author focuses on the build-to-sequence strategy of just-in-sequence supply and demonstrate an integrated approach of material requirement planning. The suggested methodology includes the determination of build-to-sequence orders, the optimisation of material requirement from lead time and cost point of view and determine the optimal sequence of operations to fulfil build-to-sequence demands. The computational results show, that the integrated optimisation leads to an increased cost efficiency, while the required manufacturing operations are performed with a decreased lead time.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
7.50
自引率
6.70%
发文量
21
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信