中小型车站外幕墙工程造价控制研究

Yanli Han
{"title":"中小型车站外幕墙工程造价控制研究","authors":"Yanli Han","doi":"10.26789/jzjg.v7i6.1571","DOIUrl":null,"url":null,"abstract":"Comparative analysis is made on the cost indexes, subdivisions and quantities of the external curtain wall works of seven small and medium-sized station buildings in a high-speed railway project, and the influence of the price of main materials, the form of external curtain wall and the keel of external curtain wall on the cost of the external curtain wall works of small and medium-sized station buildings is discussed to find out the key factors for the cost control of the external curtain wall works, provide the basis for the design, and improve the coordination of the designers and the budget estimate preparers, it provides a reference for reasonably controlling and determining the cost of the outer curtain wall project of small and medium-sized station buildings.","PeriodicalId":67191,"journal":{"name":"建筑结构","volume":"15 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-08-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research on Cost Control of External Curtain Wall Engineering of Small and Medium-sized Station House\",\"authors\":\"Yanli Han\",\"doi\":\"10.26789/jzjg.v7i6.1571\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Comparative analysis is made on the cost indexes, subdivisions and quantities of the external curtain wall works of seven small and medium-sized station buildings in a high-speed railway project, and the influence of the price of main materials, the form of external curtain wall and the keel of external curtain wall on the cost of the external curtain wall works of small and medium-sized station buildings is discussed to find out the key factors for the cost control of the external curtain wall works, provide the basis for the design, and improve the coordination of the designers and the budget estimate preparers, it provides a reference for reasonably controlling and determining the cost of the outer curtain wall project of small and medium-sized station buildings.\",\"PeriodicalId\":67191,\"journal\":{\"name\":\"建筑结构\",\"volume\":\"15 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-08-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"建筑结构\",\"FirstCategoryId\":\"1087\",\"ListUrlMain\":\"https://doi.org/10.26789/jzjg.v7i6.1571\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"建筑结构","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.26789/jzjg.v7i6.1571","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

对某高铁工程中7个中小型车站建筑外幕墙工程的造价指标、分项及工程量进行了比较分析,并对主要材料价格的影响进行了分析。探讨了外幕墙形式和外幕墙龙骨对中小车站建筑外幕墙工程造价的影响,找出了外幕墙工程造价控制的关键因素,为设计提供依据,提高了设计人员与概算编制人员的协调性。为中小车站建筑外幕墙工程造价的合理控制和确定提供参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Research on Cost Control of External Curtain Wall Engineering of Small and Medium-sized Station House
Comparative analysis is made on the cost indexes, subdivisions and quantities of the external curtain wall works of seven small and medium-sized station buildings in a high-speed railway project, and the influence of the price of main materials, the form of external curtain wall and the keel of external curtain wall on the cost of the external curtain wall works of small and medium-sized station buildings is discussed to find out the key factors for the cost control of the external curtain wall works, provide the basis for the design, and improve the coordination of the designers and the budget estimate preparers, it provides a reference for reasonably controlling and determining the cost of the outer curtain wall project of small and medium-sized station buildings.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
20031
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信