建立影响豪登省中小企业建设项目绩效结果的风险管理核心因素

IF 0.8 Q4 CONSTRUCTION & BUILDING TECHNOLOGY
B. Y. Renault, J. Agumba, N. Ansary
{"title":"建立影响豪登省中小企业建设项目绩效结果的风险管理核心因素","authors":"B. Y. Renault, J. Agumba, N. Ansary","doi":"10.21315/jcdc2020.25.2.4","DOIUrl":null,"url":null,"abstract":"The quest for delivering successful construction projects has urged South African\nsmall and medium enterprises (SMEs) to adopt risk management in their projects. However, it has been evinced that SMEs projects in South Africa especially in the Gauteng province have encountered poor performances. Thus, this article determines core risk management factors influencing project outcome of SMEs. A deductive approach was embraced using a questionnaire. The data were collected from 181 conveniently sampled respondents in Gauteng, graded from Grade 1 to 6 of the CIDB (Construction Industry Development Board) grading system. The Statistical Package for the Social Science (SPSS) version 23 was used to analyse the data by computing exploratory factor analysis and multiple regression analysis. It was revealed that SMEs performance outcome is influenced by eight risk management factors. The influential factors are organisational environment, defining project objectives, resource requirements, risk measurement, risk identification, risk assessment, risk response and action planning and monitoring, review and continuous improvement. The risk management factors established in this article are reliable and valid in projects undertaken by SMEs in the South African construction industry and the findings can serve as a guideline for contractors to achieve success in this context. The study may be repeated in other countries globally, however, it cannot be generalised due to the restrictions pertaining to the geographical area.","PeriodicalId":51876,"journal":{"name":"Journal of Construction in Developing Countries","volume":"49 1","pages":""},"PeriodicalIF":0.8000,"publicationDate":"2020-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Establishing Core Factors of Risk Management Influencing Performance Outcome of Small and Medium Firm's Construction Projects in Gauteng\",\"authors\":\"B. Y. Renault, J. Agumba, N. Ansary\",\"doi\":\"10.21315/jcdc2020.25.2.4\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The quest for delivering successful construction projects has urged South African\\nsmall and medium enterprises (SMEs) to adopt risk management in their projects. However, it has been evinced that SMEs projects in South Africa especially in the Gauteng province have encountered poor performances. Thus, this article determines core risk management factors influencing project outcome of SMEs. A deductive approach was embraced using a questionnaire. The data were collected from 181 conveniently sampled respondents in Gauteng, graded from Grade 1 to 6 of the CIDB (Construction Industry Development Board) grading system. The Statistical Package for the Social Science (SPSS) version 23 was used to analyse the data by computing exploratory factor analysis and multiple regression analysis. It was revealed that SMEs performance outcome is influenced by eight risk management factors. The influential factors are organisational environment, defining project objectives, resource requirements, risk measurement, risk identification, risk assessment, risk response and action planning and monitoring, review and continuous improvement. The risk management factors established in this article are reliable and valid in projects undertaken by SMEs in the South African construction industry and the findings can serve as a guideline for contractors to achieve success in this context. The study may be repeated in other countries globally, however, it cannot be generalised due to the restrictions pertaining to the geographical area.\",\"PeriodicalId\":51876,\"journal\":{\"name\":\"Journal of Construction in Developing Countries\",\"volume\":\"49 1\",\"pages\":\"\"},\"PeriodicalIF\":0.8000,\"publicationDate\":\"2020-12-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Construction in Developing Countries\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21315/jcdc2020.25.2.4\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Construction in Developing Countries","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21315/jcdc2020.25.2.4","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 3

摘要

为了实现成功的建设项目,南非中小型企业(SMEs)在其项目中采用风险管理。然而,有证据表明,南非特别是豪登省的中小企业项目表现不佳。从而确定影响中小企业项目成果的核心风险管理因素。通过问卷调查,采用了演绎法。数据收集自豪登省的181个方便抽样的受访者,根据CIDB(建筑业发展委员会)的评分系统分为1到6级。采用SPSS (Statistical Package for The Social Science)第23版对数据进行计算探索性因子分析和多元回归分析。结果表明,中小企业绩效结果受8个风险管理因素的影响。影响因素包括组织环境、确定项目目标、资源需求、风险度量、风险识别、风险评估、风险应对和行动计划与监控、审查和持续改进。本文中建立的风险管理因素在南非建筑业中小企业承担的项目中是可靠和有效的,研究结果可以作为承包商在这种情况下取得成功的指导方针。这项研究可以在全球其他国家重复进行,但是,由于地理区域的限制,它不能推广。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Establishing Core Factors of Risk Management Influencing Performance Outcome of Small and Medium Firm's Construction Projects in Gauteng
The quest for delivering successful construction projects has urged South African small and medium enterprises (SMEs) to adopt risk management in their projects. However, it has been evinced that SMEs projects in South Africa especially in the Gauteng province have encountered poor performances. Thus, this article determines core risk management factors influencing project outcome of SMEs. A deductive approach was embraced using a questionnaire. The data were collected from 181 conveniently sampled respondents in Gauteng, graded from Grade 1 to 6 of the CIDB (Construction Industry Development Board) grading system. The Statistical Package for the Social Science (SPSS) version 23 was used to analyse the data by computing exploratory factor analysis and multiple regression analysis. It was revealed that SMEs performance outcome is influenced by eight risk management factors. The influential factors are organisational environment, defining project objectives, resource requirements, risk measurement, risk identification, risk assessment, risk response and action planning and monitoring, review and continuous improvement. The risk management factors established in this article are reliable and valid in projects undertaken by SMEs in the South African construction industry and the findings can serve as a guideline for contractors to achieve success in this context. The study may be repeated in other countries globally, however, it cannot be generalised due to the restrictions pertaining to the geographical area.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Construction in Developing Countries
Journal of Construction in Developing Countries CONSTRUCTION & BUILDING TECHNOLOGY-
CiteScore
1.50
自引率
0.00%
发文量
25
审稿时长
20 weeks
期刊介绍: The Journal of Construction in Developing Countries seeks to provide a central vehicle for the exchange and dissemination of knowledge on issues relevant to the built environment of developing countries. The journal provides a wide range of original research an application papers on current developments and advances in the built environment as well as the economic, social, cultural and technological contexts of developing countries. It also publishes detailed case studies, as well as short communications and discussions. Topics covered include, but are not restricted to planning, urban economics, rural and regional development, housing, management and resource issues, sustiainability, knowledge and technology transfer, construction procurement, facilities management, information an communication technologies, strategies and policy issues, design issues, conservation and environmental issues.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信