影响手工装配任务的认知问题实验分析

M. Giridhar, Lasin, V. V. Panicker
{"title":"影响手工装配任务的认知问题实验分析","authors":"M. Giridhar, Lasin, V. V. Panicker","doi":"10.1109/ICSCAN49426.2020.9262305","DOIUrl":null,"url":null,"abstract":"This research explores different ways of presenting material and information at workstations, using various assembly scenarios with fifteen subjects and six different types of pen. Use of intermixed parts, grouped parts, separated parts in different boxes, and part numbered box is the material presentation factors and information presentation factor involve text instructions and photographs. It can be inferred from the results that the number of parts assembled is higher when using part numbered box with instructions and with the least errors. However, using intermixed parts with instructions resulted in a decreased number of pens assembled. The assembly time provided for each subject was ten minutes. It is found that the workload and the stress factor in identifying the parts, distinguishing and assembling during the intermixed and grouped parts with instructions got reduced in the further scenarios. Work station design and planning can be done based on the cognitive skills of subjects, and according to their skills the various material and information presentation factors can be prepared. This results in effective utilization of manpower which leads to improved productivity and effectiveness.","PeriodicalId":6744,"journal":{"name":"2020 International Conference on System, Computation, Automation and Networking (ICSCAN)","volume":"39 1","pages":"1-6"},"PeriodicalIF":0.0000,"publicationDate":"2020-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Experimental analysis of cognitive issues impacting manual assembly task\",\"authors\":\"M. Giridhar, Lasin, V. V. Panicker\",\"doi\":\"10.1109/ICSCAN49426.2020.9262305\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This research explores different ways of presenting material and information at workstations, using various assembly scenarios with fifteen subjects and six different types of pen. Use of intermixed parts, grouped parts, separated parts in different boxes, and part numbered box is the material presentation factors and information presentation factor involve text instructions and photographs. It can be inferred from the results that the number of parts assembled is higher when using part numbered box with instructions and with the least errors. However, using intermixed parts with instructions resulted in a decreased number of pens assembled. The assembly time provided for each subject was ten minutes. It is found that the workload and the stress factor in identifying the parts, distinguishing and assembling during the intermixed and grouped parts with instructions got reduced in the further scenarios. Work station design and planning can be done based on the cognitive skills of subjects, and according to their skills the various material and information presentation factors can be prepared. This results in effective utilization of manpower which leads to improved productivity and effectiveness.\",\"PeriodicalId\":6744,\"journal\":{\"name\":\"2020 International Conference on System, Computation, Automation and Networking (ICSCAN)\",\"volume\":\"39 1\",\"pages\":\"1-6\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-07-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 International Conference on System, Computation, Automation and Networking (ICSCAN)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICSCAN49426.2020.9262305\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 International Conference on System, Computation, Automation and Networking (ICSCAN)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSCAN49426.2020.9262305","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本研究探索了在工作站中呈现材料和信息的不同方式,使用了15个主题和6种不同类型的笔的不同组装场景。使用混合零件、分组零件、分离零件在不同的盒子里,零件编号盒子是材料呈现因素和信息呈现因素,涉及文字说明和照片。由结果可以推断,使用带有说明的零件编号盒时,装配的零件数量较高,且误差最小。然而,使用混合部件和指令导致组装笔的数量减少。每个科目的集合时间为十分钟。研究发现,在进一步的场景中,混合零件和分组零件的识别、区分和装配的工作量和压力因子都有所减少。工作站的设计和规划可以根据被试的认知技能来完成,并根据他们的技能来准备各种材料和信息呈现因素。这样可以有效地利用人力,从而提高生产率和效率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Experimental analysis of cognitive issues impacting manual assembly task
This research explores different ways of presenting material and information at workstations, using various assembly scenarios with fifteen subjects and six different types of pen. Use of intermixed parts, grouped parts, separated parts in different boxes, and part numbered box is the material presentation factors and information presentation factor involve text instructions and photographs. It can be inferred from the results that the number of parts assembled is higher when using part numbered box with instructions and with the least errors. However, using intermixed parts with instructions resulted in a decreased number of pens assembled. The assembly time provided for each subject was ten minutes. It is found that the workload and the stress factor in identifying the parts, distinguishing and assembling during the intermixed and grouped parts with instructions got reduced in the further scenarios. Work station design and planning can be done based on the cognitive skills of subjects, and according to their skills the various material and information presentation factors can be prepared. This results in effective utilization of manpower which leads to improved productivity and effectiveness.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信