优化利益相关者管理:变压器更换的操作决策

A. Tryollinna
{"title":"优化利益相关者管理:变压器更换的操作决策","authors":"A. Tryollinna","doi":"10.1109/ICHVEPS47643.2019.9011063","DOIUrl":null,"url":null,"abstract":"PT PLN (Persero) Transmission West Java (called PLN UIT JBB) is one unit of PT PLN (Persero) which has a strategic role in the electrical business in the DKI Jakarta & Banten. UIT JBB serves mostly VVIP and Zero Down Time area, besides High-voltage Consumers and regular consumers.Because of the service performance to customers becomes the main concern for UIT JBB, the work program must also in line with these objectives. But, the problem is in the planning of the work program itself, especially when planning the asset replacement.The current replacement planning for PT PLN (Persero) is conducted by referring to the Director Decree No. 149.K/DIR/2013 about The Replacement Criteria of The Substation Equipment which is considering the technical condition, age, and risk (environmental condition). Because there are constraints in terms of the availability of data and information about the condition of the installed equipment, the attention of annual work program is only about on the equipment which has old age and anomalies. This causes a lot of equipment will be in the replacement proposal.Therefore, to improve the service performance to stakeholder, UIT JBB makes a method in prioritizing the replacement or treatment based on the asset condition and also the substation criticality. The substation criticality is made by considering on the area or consumer that supplied by the substation according to the criteria of the UIT JBB’s stakeholder. While the asset condition themselves are obtained through the result of the combination of health index and susceptibility index. Where the health index is describing the readiness of the asset which can be obtained from maintenance results, meanwhile susceptibility index is the external factors that can be affecting the vulnerability of the equipment.This paper will discuss the method used in prioritizing the work program, especially the transformer replacement. The result of the method is the priority 1 to priority 4 of the transformer in the replacement proposal which can be used to determine which transformer must be replaced first.","PeriodicalId":6677,"journal":{"name":"2019 2nd International Conference on High Voltage Engineering and Power Systems (ICHVEPS)","volume":"6 1","pages":"067-071"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimizing Stakeholder Management: Operational Decision Making for Transformer Replacement\",\"authors\":\"A. Tryollinna\",\"doi\":\"10.1109/ICHVEPS47643.2019.9011063\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PT PLN (Persero) Transmission West Java (called PLN UIT JBB) is one unit of PT PLN (Persero) which has a strategic role in the electrical business in the DKI Jakarta & Banten. UIT JBB serves mostly VVIP and Zero Down Time area, besides High-voltage Consumers and regular consumers.Because of the service performance to customers becomes the main concern for UIT JBB, the work program must also in line with these objectives. But, the problem is in the planning of the work program itself, especially when planning the asset replacement.The current replacement planning for PT PLN (Persero) is conducted by referring to the Director Decree No. 149.K/DIR/2013 about The Replacement Criteria of The Substation Equipment which is considering the technical condition, age, and risk (environmental condition). Because there are constraints in terms of the availability of data and information about the condition of the installed equipment, the attention of annual work program is only about on the equipment which has old age and anomalies. This causes a lot of equipment will be in the replacement proposal.Therefore, to improve the service performance to stakeholder, UIT JBB makes a method in prioritizing the replacement or treatment based on the asset condition and also the substation criticality. The substation criticality is made by considering on the area or consumer that supplied by the substation according to the criteria of the UIT JBB’s stakeholder. While the asset condition themselves are obtained through the result of the combination of health index and susceptibility index. Where the health index is describing the readiness of the asset which can be obtained from maintenance results, meanwhile susceptibility index is the external factors that can be affecting the vulnerability of the equipment.This paper will discuss the method used in prioritizing the work program, especially the transformer replacement. The result of the method is the priority 1 to priority 4 of the transformer in the replacement proposal which can be used to determine which transformer must be replaced first.\",\"PeriodicalId\":6677,\"journal\":{\"name\":\"2019 2nd International Conference on High Voltage Engineering and Power Systems (ICHVEPS)\",\"volume\":\"6 1\",\"pages\":\"067-071\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 2nd International Conference on High Voltage Engineering and Power Systems (ICHVEPS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICHVEPS47643.2019.9011063\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 2nd International Conference on High Voltage Engineering and Power Systems (ICHVEPS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICHVEPS47643.2019.9011063","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

PT PLN (Persero)传输西爪哇(称为PLN UIT JBB)是PT PLN (Persero)的一个单位,在DKI雅加达和万丹的电气业务中具有战略作用。uitjbb主要服务于VVIP和零停机区,除高压用户和普通用户外。由于对客户的服务绩效成为UIT JBB的主要关注点,因此工作计划也必须符合这些目标。但是,问题在于工作方案本身的规划,特别是在规划资产置换时。目前对PT PLN (Persero)的替换计划是参照第149号主任法令进行的。K/DIR/2013《变电站设备更换标准》,考虑了技术条件、使用年限和风险(环境条件)。由于已安装设备状态的数据和信息的可获得性受到限制,年度工作计划的重点只放在老旧和异常的设备上。这导致很多设备都会在更换建议中。因此,为了提高对利益相关者的服务绩效,UIT JBB提出了一种基于资产状况和变电站临界状态的优先更换或处理方法。根据UIT JBB利益相关者的标准,通过考虑变电站提供的区域或消费者来确定变电站的临界性。而资产状况本身则是由健康指数和易感指数结合得到的结果。其中,健康指数描述了从维护结果中获得的资产的就绪情况,而易感性指数则是可能影响设备易损性的外部因素。本文将讨论工作计划优先排序的方法,特别是变压器更换。该方法的结果是替换建议中变压器的优先级1至优先级4,可用于确定必须首先更换哪台变压器。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Optimizing Stakeholder Management: Operational Decision Making for Transformer Replacement
PT PLN (Persero) Transmission West Java (called PLN UIT JBB) is one unit of PT PLN (Persero) which has a strategic role in the electrical business in the DKI Jakarta & Banten. UIT JBB serves mostly VVIP and Zero Down Time area, besides High-voltage Consumers and regular consumers.Because of the service performance to customers becomes the main concern for UIT JBB, the work program must also in line with these objectives. But, the problem is in the planning of the work program itself, especially when planning the asset replacement.The current replacement planning for PT PLN (Persero) is conducted by referring to the Director Decree No. 149.K/DIR/2013 about The Replacement Criteria of The Substation Equipment which is considering the technical condition, age, and risk (environmental condition). Because there are constraints in terms of the availability of data and information about the condition of the installed equipment, the attention of annual work program is only about on the equipment which has old age and anomalies. This causes a lot of equipment will be in the replacement proposal.Therefore, to improve the service performance to stakeholder, UIT JBB makes a method in prioritizing the replacement or treatment based on the asset condition and also the substation criticality. The substation criticality is made by considering on the area or consumer that supplied by the substation according to the criteria of the UIT JBB’s stakeholder. While the asset condition themselves are obtained through the result of the combination of health index and susceptibility index. Where the health index is describing the readiness of the asset which can be obtained from maintenance results, meanwhile susceptibility index is the external factors that can be affecting the vulnerability of the equipment.This paper will discuss the method used in prioritizing the work program, especially the transformer replacement. The result of the method is the priority 1 to priority 4 of the transformer in the replacement proposal which can be used to determine which transformer must be replaced first.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信