{"title":"基于数据对账技术的油气工业状态维护","authors":"I. Craciun, F. Lecoq, Suryaprakash Digavalli","doi":"10.2118/197526-ms","DOIUrl":null,"url":null,"abstract":"\n This article proposes a new approach for dealing with maintenance issues for large industrial processes. The case study is taken from an industrial implementation of a condition-based maintenance project for the heat exchangers from the crude preheating train of a European refinery. The application was developed based reconciled data using the advanced data validation and reconciliation tool, VALI, developed by Belsim.\n The article proposes the riguroous calculation and monitoring of the fouling factors of heat exchangers as crucial parameter to alert the operator about the condition of the heat exchangers. The calculation of fouling factors is performed automatically by the application with a minimum initial input effort from the part of the modeler: design date for film transfer coefficients for the both sides of the heat exchanger. Industrial data shows that the heat exchangers from the crude preheating train are prone to relatively quick fouling. The financial analysis of the impact of the fouling problem on the normalized daily fuel consumption in the crude furnace has shown that the high initial financial gain of a preheater cleaning can amount to as much as 20% of daily fuel cost. However, the performance degradation sets in very fast and the high initial gains are not sustained for prolonged periods of time. On the other hand, the overall performance degradation slows down in time and the performance of the crude preheating train stabilizes at lower values, making the decision process for heat exchanger cleaning more difficult in situations of pressures to maintain production volumes.","PeriodicalId":11091,"journal":{"name":"Day 3 Wed, November 13, 2019","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-11-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Condition Based Maintenance for Oil and Gas Industry Based on Data Reconciliation Techniques\",\"authors\":\"I. Craciun, F. Lecoq, Suryaprakash Digavalli\",\"doi\":\"10.2118/197526-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n This article proposes a new approach for dealing with maintenance issues for large industrial processes. The case study is taken from an industrial implementation of a condition-based maintenance project for the heat exchangers from the crude preheating train of a European refinery. The application was developed based reconciled data using the advanced data validation and reconciliation tool, VALI, developed by Belsim.\\n The article proposes the riguroous calculation and monitoring of the fouling factors of heat exchangers as crucial parameter to alert the operator about the condition of the heat exchangers. The calculation of fouling factors is performed automatically by the application with a minimum initial input effort from the part of the modeler: design date for film transfer coefficients for the both sides of the heat exchanger. Industrial data shows that the heat exchangers from the crude preheating train are prone to relatively quick fouling. The financial analysis of the impact of the fouling problem on the normalized daily fuel consumption in the crude furnace has shown that the high initial financial gain of a preheater cleaning can amount to as much as 20% of daily fuel cost. However, the performance degradation sets in very fast and the high initial gains are not sustained for prolonged periods of time. On the other hand, the overall performance degradation slows down in time and the performance of the crude preheating train stabilizes at lower values, making the decision process for heat exchanger cleaning more difficult in situations of pressures to maintain production volumes.\",\"PeriodicalId\":11091,\"journal\":{\"name\":\"Day 3 Wed, November 13, 2019\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-11-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Wed, November 13, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/197526-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, November 13, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/197526-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文提出了一种处理大型工业过程维护问题的新方法。本案例研究来自欧洲炼油厂原油预热装置热交换器状态维护项目的工业实施。该应用程序是使用Belsim开发的高级数据验证和对账工具VALI基于对账数据开发的。本文提出严格计算和监测换热器的结垢系数是提醒操作人员了解换热器状况的关键参数。结垢系数的计算是由应用程序自动执行的,从建模者的部分的最小初始输入努力:热交换器两侧的膜传递系数的设计日期。工业数据表明,原油预热系的换热器容易较快结垢。对结垢问题对粗炉规范日燃料消耗影响的财务分析表明,预热器清洗的高初始经济收益可高达日燃料成本的20%。然而,性能下降的速度非常快,并且最初的高收益不能持续很长时间。另一方面,随着时间的推移,整体性能下降速度减慢,原油预热系统的性能稳定在较低的值,这使得在维持产量的压力下,换热器清洗的决策过程更加困难。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Condition Based Maintenance for Oil and Gas Industry Based on Data Reconciliation Techniques
This article proposes a new approach for dealing with maintenance issues for large industrial processes. The case study is taken from an industrial implementation of a condition-based maintenance project for the heat exchangers from the crude preheating train of a European refinery. The application was developed based reconciled data using the advanced data validation and reconciliation tool, VALI, developed by Belsim. The article proposes the riguroous calculation and monitoring of the fouling factors of heat exchangers as crucial parameter to alert the operator about the condition of the heat exchangers. The calculation of fouling factors is performed automatically by the application with a minimum initial input effort from the part of the modeler: design date for film transfer coefficients for the both sides of the heat exchanger. Industrial data shows that the heat exchangers from the crude preheating train are prone to relatively quick fouling. The financial analysis of the impact of the fouling problem on the normalized daily fuel consumption in the crude furnace has shown that the high initial financial gain of a preheater cleaning can amount to as much as 20% of daily fuel cost. However, the performance degradation sets in very fast and the high initial gains are not sustained for prolonged periods of time. On the other hand, the overall performance degradation slows down in time and the performance of the crude preheating train stabilizes at lower values, making the decision process for heat exchanger cleaning more difficult in situations of pressures to maintain production volumes.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信