{"title":"通过使用跨式封隔器,将应用程序导向固液井,成功案例","authors":"A. Gadelhak, Mohamed Al-Badi, Ahmed Al-Bairaq, E. Al Mheiri, Abdullah Haj Al-Hosani, Z. Ahmed, Sami Ullah Bashir Ahmed, Mubashir Ahmed, Waleed Omar Abedelkhalik, Sameh Hassan Naser, Haysam El-Shater, Wessam Al Assar, Steve Ross, Blair Duncan","doi":"10.2118/207840-ms","DOIUrl":null,"url":null,"abstract":"\n \n \n The Increase of inactive wells due to subsurface integrity issue is observed in brown fields, Fig-1 is, showing the record for onshore UAE asset, the economic challenges is calling for alternative solutions to restore well integrity with lower cost.\n Straddle packer application is consists of two tandom packers with spacer pipe in between with anchoring system deployed riglessly in the well to isolate the communication point between Ann A and Tubing.Fig-2,\n \n \n \n Communication between tubing and annulus A (Failure of primary barrier) is identified as the right candidate wells for straddle packer application,\n First step is to clearly identify the point of communication, it has been done by annulus pressure investigation excersize during flowing and shut in condition, observing the return of annulus fluid which was the same produced gas\n Noise log has been conducted and clearly identified the communication point at SPM (Side Pocket Mandrel) to be used for emergency killing,\n Tubing integrity test was conducted using nippless plugs and inflow test below and above the leak point and confirm no other leak points within the tubing\n Engineering drawing for the leaking assembly was reviewed to design the dimension of straddle packer assembly, length and packer size\n It is recommended to deploy the assembly using electric line correlation for accurate depth selection\n After setting annulus pressure observed no build up\n Well opened safely to production\n \n \n \n Leak point arrested, well primary barrier restored\n Removed from DWS (drilling and workover schedule) and restore well production in addition to improving inactive string KPI for Gas asset\n Save almost work over cost for gas well XX-197\n \n \n \n The way forward is to check the scalability of extending this application among other ADNOC assets and to screen the right candidate wells for this application\n To add this application as a part of well integrity procedures and recommendations for such like cases\n","PeriodicalId":11069,"journal":{"name":"Day 2 Tue, November 16, 2021","volume":"13 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Lead Application to Cure Sap Wells by Deploying Straddle Packer, Success Story\",\"authors\":\"A. Gadelhak, Mohamed Al-Badi, Ahmed Al-Bairaq, E. Al Mheiri, Abdullah Haj Al-Hosani, Z. Ahmed, Sami Ullah Bashir Ahmed, Mubashir Ahmed, Waleed Omar Abedelkhalik, Sameh Hassan Naser, Haysam El-Shater, Wessam Al Assar, Steve Ross, Blair Duncan\",\"doi\":\"10.2118/207840-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n \\n \\n The Increase of inactive wells due to subsurface integrity issue is observed in brown fields, Fig-1 is, showing the record for onshore UAE asset, the economic challenges is calling for alternative solutions to restore well integrity with lower cost.\\n Straddle packer application is consists of two tandom packers with spacer pipe in between with anchoring system deployed riglessly in the well to isolate the communication point between Ann A and Tubing.Fig-2,\\n \\n \\n \\n Communication between tubing and annulus A (Failure of primary barrier) is identified as the right candidate wells for straddle packer application,\\n First step is to clearly identify the point of communication, it has been done by annulus pressure investigation excersize during flowing and shut in condition, observing the return of annulus fluid which was the same produced gas\\n Noise log has been conducted and clearly identified the communication point at SPM (Side Pocket Mandrel) to be used for emergency killing,\\n Tubing integrity test was conducted using nippless plugs and inflow test below and above the leak point and confirm no other leak points within the tubing\\n Engineering drawing for the leaking assembly was reviewed to design the dimension of straddle packer assembly, length and packer size\\n It is recommended to deploy the assembly using electric line correlation for accurate depth selection\\n After setting annulus pressure observed no build up\\n Well opened safely to production\\n \\n \\n \\n Leak point arrested, well primary barrier restored\\n Removed from DWS (drilling and workover schedule) and restore well production in addition to improving inactive string KPI for Gas asset\\n Save almost work over cost for gas well XX-197\\n \\n \\n \\n The way forward is to check the scalability of extending this application among other ADNOC assets and to screen the right candidate wells for this application\\n To add this application as a part of well integrity procedures and recommendations for such like cases\\n\",\"PeriodicalId\":11069,\"journal\":{\"name\":\"Day 2 Tue, November 16, 2021\",\"volume\":\"13 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, November 16, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/207840-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, November 16, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/207840-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

由于地下完整性问题,棕色油田的闲置井数量有所增加,如图1所示,显示了阿联酋陆上资产的记录,经济挑战要求寻找替代解决方案,以更低的成本恢复井的完整性。跨式封隔器由两个随机封隔器组成,封隔器之间有隔水管,锚定系统在井中无钻机部署,以隔离Ann A与油管之间的通信点。图2,油管与环空之间的连通(主屏障失效)被确定为跨式封隔器应用的合适候选井,第一步是明确连通点,这是通过流动和关闭状态下的环空压力调查来实现的。观察了环空流体的回流,发现了同样的产出气体,进行了噪音测井,并清楚地确定了SPM(侧袋心轴)的通信点,用于紧急压井,使用无钳塞进行了油管完整性测试,并在泄漏点下方和上方进行了流入测试,确认油管内没有其他泄漏点,并审查了泄漏总成的工程图纸,设计了跨式封隔器总成的尺寸。在设置完环空压力后,观察到环空压力没有积聚,安全开井至生产,封堵泄漏点。从DWS(钻井和修井计划)中移除,除了改善天然气资产的非活动管柱KPI外,还恢复了油井生产。为XX-197气井节省了几乎超过成本的工作。下一步的方法是检查将该应用扩展到其他ADNOC资产中的可扩展性,并筛选适合该应用的候选井,将该应用作为井完整性程序的一部分,并为此类情况提供建议
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Lead Application to Cure Sap Wells by Deploying Straddle Packer, Success Story
The Increase of inactive wells due to subsurface integrity issue is observed in brown fields, Fig-1 is, showing the record for onshore UAE asset, the economic challenges is calling for alternative solutions to restore well integrity with lower cost. Straddle packer application is consists of two tandom packers with spacer pipe in between with anchoring system deployed riglessly in the well to isolate the communication point between Ann A and Tubing.Fig-2, Communication between tubing and annulus A (Failure of primary barrier) is identified as the right candidate wells for straddle packer application, First step is to clearly identify the point of communication, it has been done by annulus pressure investigation excersize during flowing and shut in condition, observing the return of annulus fluid which was the same produced gas Noise log has been conducted and clearly identified the communication point at SPM (Side Pocket Mandrel) to be used for emergency killing, Tubing integrity test was conducted using nippless plugs and inflow test below and above the leak point and confirm no other leak points within the tubing Engineering drawing for the leaking assembly was reviewed to design the dimension of straddle packer assembly, length and packer size It is recommended to deploy the assembly using electric line correlation for accurate depth selection After setting annulus pressure observed no build up Well opened safely to production Leak point arrested, well primary barrier restored Removed from DWS (drilling and workover schedule) and restore well production in addition to improving inactive string KPI for Gas asset Save almost work over cost for gas well XX-197 The way forward is to check the scalability of extending this application among other ADNOC assets and to screen the right candidate wells for this application To add this application as a part of well integrity procedures and recommendations for such like cases
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信