{"title":"容重估算在矿山规划中的影响","authors":"Celso Reis, C. Arroyo, A. Curi, Marcelo Zangrandi","doi":"10.1080/25726668.2021.1876481","DOIUrl":null,"url":null,"abstract":"ABSTRACT The incorporation of bulk density uncertainty for Mineral Resource and Mineral Reserves (MRMR) steps is of great importance for successful mine planning process. In practice, most mining projects use an average density value for each lithological type of the deposit. However, density determinations require special attention as they directly affect the conversion of volumes to tonnages and ore grades to metal contents. The objective of this study is to measure and minimize the risks associated with the MRMR stages, including the density variability in mine planning. Traditional interpolation techniques in geostatistics were used to represent density spatial distribution in a block model, similarly to those used for grade estimation. This approach was developed and applied at a Brazilian iron ore mine. The results indicate MRMR are underestimated if density uncertainty is not considered. Mine design changes were observed, including 5% impact on the Life-of-mine (LOM) and 2% in Net Present Value (NPV).","PeriodicalId":44166,"journal":{"name":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","volume":"20 1","pages":"60 - 65"},"PeriodicalIF":1.8000,"publicationDate":"2021-01-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Impact of bulk density estimation in mine planning\",\"authors\":\"Celso Reis, C. Arroyo, A. Curi, Marcelo Zangrandi\",\"doi\":\"10.1080/25726668.2021.1876481\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT The incorporation of bulk density uncertainty for Mineral Resource and Mineral Reserves (MRMR) steps is of great importance for successful mine planning process. In practice, most mining projects use an average density value for each lithological type of the deposit. However, density determinations require special attention as they directly affect the conversion of volumes to tonnages and ore grades to metal contents. The objective of this study is to measure and minimize the risks associated with the MRMR stages, including the density variability in mine planning. Traditional interpolation techniques in geostatistics were used to represent density spatial distribution in a block model, similarly to those used for grade estimation. This approach was developed and applied at a Brazilian iron ore mine. The results indicate MRMR are underestimated if density uncertainty is not considered. Mine design changes were observed, including 5% impact on the Life-of-mine (LOM) and 2% in Net Present Value (NPV).\",\"PeriodicalId\":44166,\"journal\":{\"name\":\"Mining Technology-Transactions of the Institutions of Mining and Metallurgy\",\"volume\":\"20 1\",\"pages\":\"60 - 65\"},\"PeriodicalIF\":1.8000,\"publicationDate\":\"2021-01-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Mining Technology-Transactions of the Institutions of Mining and Metallurgy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/25726668.2021.1876481\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MINING & MINERAL PROCESSING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/25726668.2021.1876481","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
Impact of bulk density estimation in mine planning
ABSTRACT The incorporation of bulk density uncertainty for Mineral Resource and Mineral Reserves (MRMR) steps is of great importance for successful mine planning process. In practice, most mining projects use an average density value for each lithological type of the deposit. However, density determinations require special attention as they directly affect the conversion of volumes to tonnages and ore grades to metal contents. The objective of this study is to measure and minimize the risks associated with the MRMR stages, including the density variability in mine planning. Traditional interpolation techniques in geostatistics were used to represent density spatial distribution in a block model, similarly to those used for grade estimation. This approach was developed and applied at a Brazilian iron ore mine. The results indicate MRMR are underestimated if density uncertainty is not considered. Mine design changes were observed, including 5% impact on the Life-of-mine (LOM) and 2% in Net Present Value (NPV).