配电自动化系统主站试验方案

Yinghui Xu, Xiaohui Xu
{"title":"配电自动化系统主站试验方案","authors":"Yinghui Xu, Xiaohui Xu","doi":"10.1109/TENCON.2008.4766500","DOIUrl":null,"url":null,"abstract":"Schemes are presented to implement FAT (factory accept test) of the master station of DAS (distribution automation system), test configuration contains emulated distribution network, test environment and test software, two types of test environments including total software scheme and software-hardware combined scheme are analyzed, and then generalize the conditions for automatic test. The implementation schemes of manual test and automatic test are analyzed in detail for the typical fault situations of feeder automation, and also include several kinds of special faults such as: telecontrol triggering fault, concurrent multi-faults, multi-sources fault, etc. Reliability tests make up of three aspects: 1) long-term continuous running under typically normal condition; 2) continuous automatic telecontrol with short period; 3) data avalanche test. The importance is analyzed for automatic test software performing long-term continuous test and result logging according to developmental and practical situation, and generalize the required time duration and data volume for presented test schemes.","PeriodicalId":22230,"journal":{"name":"TENCON 2008 - 2008 IEEE Region 10 Conference","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2008-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Test schemes for master station of distribution automation systems\",\"authors\":\"Yinghui Xu, Xiaohui Xu\",\"doi\":\"10.1109/TENCON.2008.4766500\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Schemes are presented to implement FAT (factory accept test) of the master station of DAS (distribution automation system), test configuration contains emulated distribution network, test environment and test software, two types of test environments including total software scheme and software-hardware combined scheme are analyzed, and then generalize the conditions for automatic test. The implementation schemes of manual test and automatic test are analyzed in detail for the typical fault situations of feeder automation, and also include several kinds of special faults such as: telecontrol triggering fault, concurrent multi-faults, multi-sources fault, etc. Reliability tests make up of three aspects: 1) long-term continuous running under typically normal condition; 2) continuous automatic telecontrol with short period; 3) data avalanche test. The importance is analyzed for automatic test software performing long-term continuous test and result logging according to developmental and practical situation, and generalize the required time duration and data volume for presented test schemes.\",\"PeriodicalId\":22230,\"journal\":{\"name\":\"TENCON 2008 - 2008 IEEE Region 10 Conference\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"TENCON 2008 - 2008 IEEE Region 10 Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TENCON.2008.4766500\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"TENCON 2008 - 2008 IEEE Region 10 Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TENCON.2008.4766500","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

提出了实现配电自动化系统主站出厂验收测试的方案,测试组态包括仿真配电网、测试环境和测试软件,分析了软件总方案和软硬件结合方案两种测试环境,并归纳出自动化测试的条件。针对馈线自动化的典型故障情况,详细分析了手动测试和自动测试的实施方案,并包括了遥控触发故障、并发多故障、多源故障等几种特殊故障。可靠性试验包括三个方面:1)在典型正常工况下长期连续运行;2)短周期连续自动遥控;3)数据雪崩测试。根据发展和实际情况,分析了自动测试软件进行长期连续测试和结果记录的重要性,总结了所提出的测试方案所需的时间和数据量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Test schemes for master station of distribution automation systems
Schemes are presented to implement FAT (factory accept test) of the master station of DAS (distribution automation system), test configuration contains emulated distribution network, test environment and test software, two types of test environments including total software scheme and software-hardware combined scheme are analyzed, and then generalize the conditions for automatic test. The implementation schemes of manual test and automatic test are analyzed in detail for the typical fault situations of feeder automation, and also include several kinds of special faults such as: telecontrol triggering fault, concurrent multi-faults, multi-sources fault, etc. Reliability tests make up of three aspects: 1) long-term continuous running under typically normal condition; 2) continuous automatic telecontrol with short period; 3) data avalanche test. The importance is analyzed for automatic test software performing long-term continuous test and result logging according to developmental and practical situation, and generalize the required time duration and data volume for presented test schemes.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信