{"title":"通过使用固井记分卡和作业后执行数据来确定固井隔离的结构化方法","authors":"T. Heu, Anson Wee, C. Combe, Razif Mohd-Radzi, Ting-Ting Zhang","doi":"10.2118/192096-MS","DOIUrl":null,"url":null,"abstract":"\n Conventional ‘textbook’ primary cement job execution has always been associated with the combination of bumping top wiper plug, successful casing pressure test and/or no losses during the job. These criteria have been referenced by the general industry as positive indications and conveniently adopted as qualification for a successful cement job without considering other key parameters that contributes to proper cement isolation behind casing. In a deepwater development campaign offshore Malaysia, cement isolation behind the 9-5/8\" production casing serves as critical barrier to ensure well integrity throughout the production lifecycle. To achieve this, the authors have deployed a structured approach focused on designing for success and optimizing a set of key performance indicators (KPIs) with pre- and post-drilled hole conditions. This paper outlines the approach based on the experience from the drilling campaign of nine oil producer wells.","PeriodicalId":11240,"journal":{"name":"Day 1 Tue, October 23, 2018","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-10-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Structured Approach in Qualifying Cement Isolation Through the Use of Cementing Scorecard and Post-Job Execution Data\",\"authors\":\"T. Heu, Anson Wee, C. Combe, Razif Mohd-Radzi, Ting-Ting Zhang\",\"doi\":\"10.2118/192096-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Conventional ‘textbook’ primary cement job execution has always been associated with the combination of bumping top wiper plug, successful casing pressure test and/or no losses during the job. These criteria have been referenced by the general industry as positive indications and conveniently adopted as qualification for a successful cement job without considering other key parameters that contributes to proper cement isolation behind casing. In a deepwater development campaign offshore Malaysia, cement isolation behind the 9-5/8\\\" production casing serves as critical barrier to ensure well integrity throughout the production lifecycle. To achieve this, the authors have deployed a structured approach focused on designing for success and optimizing a set of key performance indicators (KPIs) with pre- and post-drilled hole conditions. This paper outlines the approach based on the experience from the drilling campaign of nine oil producer wells.\",\"PeriodicalId\":11240,\"journal\":{\"name\":\"Day 1 Tue, October 23, 2018\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-10-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 1 Tue, October 23, 2018\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/192096-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Tue, October 23, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/192096-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Structured Approach in Qualifying Cement Isolation Through the Use of Cementing Scorecard and Post-Job Execution Data
Conventional ‘textbook’ primary cement job execution has always been associated with the combination of bumping top wiper plug, successful casing pressure test and/or no losses during the job. These criteria have been referenced by the general industry as positive indications and conveniently adopted as qualification for a successful cement job without considering other key parameters that contributes to proper cement isolation behind casing. In a deepwater development campaign offshore Malaysia, cement isolation behind the 9-5/8" production casing serves as critical barrier to ensure well integrity throughout the production lifecycle. To achieve this, the authors have deployed a structured approach focused on designing for success and optimizing a set of key performance indicators (KPIs) with pre- and post-drilled hole conditions. This paper outlines the approach based on the experience from the drilling campaign of nine oil producer wells.