{"title":"南苏门答腊省Musi Banyuasin Regency Sena Sungai Lilin区采煤分配系统脱水","authors":"H. Prabowo, W. Wahyudi, Rolitu Rolitu","doi":"10.24036/jptk.v6i2.32623","DOIUrl":null,"url":null,"abstract":"The purpose of this research is to calculate the total design discharge of water entering the mining site in the sena pit of PT Putra Muba Coal (PMC), design the appropriate shape and dimensions of the sump to accommodate the amount of water entering the mining site and calculate the number of pumps needed to remove water entering the mine to the settling pond. The source of water entering the mine area comes from rainwater entering the mine opening, water runoff from the rainwater catchment area in the area around the mine opening, and groundwater rise. Based on the results of the analysis of rainfall data for 2013-2022, a rainfall plan of 77, 225 mm/day, rainfall intensity of 9.714 mm/hour with a rainfall return period of 2 years was obtained. The rainfall catchment area at the research site is 72,936 m2 with a discharge generated of 0.03 m3 / second and groundwater discharge of 0.00812 m3 / second. To remove the water entering the mine, it is flowed naturally into the sump with dimensions of 50 m length, 14 m top width, 13 m bottom width, and 5 m depth. The dimensions of the open channel are planned with a channel width of 32 cm, a flow depth of 28 cm, a wet cross-sectional area of 13.6 cm2, a wet circumference of 97 cm, a hydraulic radius of 9.25 cm, and a channel length of 233m.  The water in the sump is pumped into an open channel. The pump used has a maximum discharge of 150 m3 / hour and a total pump head of 11.8712 m with a pipe diameter of 6 inches.","PeriodicalId":55675,"journal":{"name":"Jurnal Pendidikan Teknologi dan Kejuruan","volume":"73 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-05-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Distribution System Dewatering in Coal Mining at PIT Sena Sungai Lilin District, Musi Banyuasin Regency, South Sumatra Province\",\"authors\":\"H. Prabowo, W. Wahyudi, Rolitu Rolitu\",\"doi\":\"10.24036/jptk.v6i2.32623\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The purpose of this research is to calculate the total design discharge of water entering the mining site in the sena pit of PT Putra Muba Coal (PMC), design the appropriate shape and dimensions of the sump to accommodate the amount of water entering the mining site and calculate the number of pumps needed to remove water entering the mine to the settling pond. The source of water entering the mine area comes from rainwater entering the mine opening, water runoff from the rainwater catchment area in the area around the mine opening, and groundwater rise. Based on the results of the analysis of rainfall data for 2013-2022, a rainfall plan of 77, 225 mm/day, rainfall intensity of 9.714 mm/hour with a rainfall return period of 2 years was obtained. The rainfall catchment area at the research site is 72,936 m2 with a discharge generated of 0.03 m3 / second and groundwater discharge of 0.00812 m3 / second. To remove the water entering the mine, it is flowed naturally into the sump with dimensions of 50 m length, 14 m top width, 13 m bottom width, and 5 m depth. The dimensions of the open channel are planned with a channel width of 32 cm, a flow depth of 28 cm, a wet cross-sectional area of 13.6 cm2, a wet circumference of 97 cm, a hydraulic radius of 9.25 cm, and a channel length of 233m.  The water in the sump is pumped into an open channel. The pump used has a maximum discharge of 150 m3 / hour and a total pump head of 11.8712 m with a pipe diameter of 6 inches.\",\"PeriodicalId\":55675,\"journal\":{\"name\":\"Jurnal Pendidikan Teknologi dan Kejuruan\",\"volume\":\"73 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-05-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Pendidikan Teknologi dan Kejuruan\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24036/jptk.v6i2.32623\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Pendidikan Teknologi dan Kejuruan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24036/jptk.v6i2.32623","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究的目的是计算普特拉穆巴煤(PMC) sena坑进入采场的总设计排水量,设计适当的水槽形状和尺寸以容纳进入采场的水量,并计算将进入矿井的水排入沉淀池所需的水泵数量。进入矿区的水源来自进入井口的雨水,井口周围区域雨水集水区的雨水径流,地下水上升。通过对2013-2022年降水资料的分析,得出降水计划为77,225 mm/d,降雨强度为9.714 mm/h,降水回复期为2年。研究点降雨集水区面积为72936 m2,产生的流量为0.03 m3 / s,地下水排放量为0.00812 m3 / s。为排出进入矿井的水,自然流入长50米、顶宽14米、底宽13米、深5米的污水池。明渠的尺寸规划为河道宽度32厘米,流深28厘米,湿横截面积13.6平方厘米,湿周长97厘米,水力半径9.25厘米,河道长度233米。水池里的水被抽到一个开放的通道里。所使用的泵最大流量为150m3 / h,总泵扬程为11.8712 m,管径为6英寸。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Distribution System Dewatering in Coal Mining at PIT Sena Sungai Lilin District, Musi Banyuasin Regency, South Sumatra Province
The purpose of this research is to calculate the total design discharge of water entering the mining site in the sena pit of PT Putra Muba Coal (PMC), design the appropriate shape and dimensions of the sump to accommodate the amount of water entering the mining site and calculate the number of pumps needed to remove water entering the mine to the settling pond. The source of water entering the mine area comes from rainwater entering the mine opening, water runoff from the rainwater catchment area in the area around the mine opening, and groundwater rise. Based on the results of the analysis of rainfall data for 2013-2022, a rainfall plan of 77, 225 mm/day, rainfall intensity of 9.714 mm/hour with a rainfall return period of 2 years was obtained. The rainfall catchment area at the research site is 72,936 m2 with a discharge generated of 0.03 m3 / second and groundwater discharge of 0.00812 m3 / second. To remove the water entering the mine, it is flowed naturally into the sump with dimensions of 50 m length, 14 m top width, 13 m bottom width, and 5 m depth. The dimensions of the open channel are planned with a channel width of 32 cm, a flow depth of 28 cm, a wet cross-sectional area of 13.6 cm2, a wet circumference of 97 cm, a hydraulic radius of 9.25 cm, and a channel length of 233m.  The water in the sump is pumped into an open channel. The pump used has a maximum discharge of 150 m3 / hour and a total pump head of 11.8712 m with a pipe diameter of 6 inches.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
20
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信