Héctor Bernardo, Steve Thompson, Antonio Vázquez, A. Ward, David Taylor, J. Bullingham
{"title":"在英国新昆斯费里渡口推出北进高架桥:设计和施工","authors":"Héctor Bernardo, Steve Thompson, Antonio Vázquez, A. Ward, David Taylor, J. Bullingham","doi":"10.1680/JBREN.18.00018","DOIUrl":null,"url":null,"abstract":"Launching is a bridge erection method that provides significant advantages when there is difficult underdeck access for falsework, crane and heavy plant. In such cases, assembling the deck in a mor...","PeriodicalId":44437,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Bridge Engineering","volume":"12 1","pages":""},"PeriodicalIF":1.5000,"publicationDate":"2019-05-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Launched north approach viaduct in the new Queensferry crossing, UK: design and construction\",\"authors\":\"Héctor Bernardo, Steve Thompson, Antonio Vázquez, A. Ward, David Taylor, J. Bullingham\",\"doi\":\"10.1680/JBREN.18.00018\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Launching is a bridge erection method that provides significant advantages when there is difficult underdeck access for falsework, crane and heavy plant. In such cases, assembling the deck in a mor...\",\"PeriodicalId\":44437,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Bridge Engineering\",\"volume\":\"12 1\",\"pages\":\"\"},\"PeriodicalIF\":1.5000,\"publicationDate\":\"2019-05-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Bridge Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/JBREN.18.00018\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Bridge Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/JBREN.18.00018","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
Launched north approach viaduct in the new Queensferry crossing, UK: design and construction
Launching is a bridge erection method that provides significant advantages when there is difficult underdeck access for falsework, crane and heavy plant. In such cases, assembling the deck in a mor...