{"title":"ABP MPD在墨西哥湾深水应用的商业案例","authors":"Sharief Moghazy, R. V. Noort, S. Shayegi","doi":"10.2118/194538-MS","DOIUrl":null,"url":null,"abstract":"\n Surface Applied Back Pressure Managed Pressure Drilling (MPD) systems provide a potentially game changing technology for Deepwater Gulf of Mexico drilling applications by means of annular pressure manipulation for drilling through narrow margins, cementing across potential loss zones, assisting in running completions, and mitigating non-productive time. The technology however, is not without cost and the challenge remains to build the business case to utilize MPD in Deepwater applications. Recently several wells were successfully drilled using this technology to the planned target depth accessing reserves that would not have been possible otherwise. This type of scenario where using MPD to stay within a narrow margin has been the means to justify the upfront costs to get a rig outfitted with MPD and the operating costs of the system during use. Once a rig is outfitted with MPD, the economics for a project shift, however, justifying the business case purely based on NPT savings is still not typically viable. This paper will provide the operator's perspective of the cost-benefit analysis for MPD use and provide business case examples for the use in Deepwater Gulf of Mexico. The impact of lessons learned on an ongoing campaign and the savings viable for this and other implementation scenarios will also be discussed to develop a robust case for MPD adoption.","PeriodicalId":11150,"journal":{"name":"Day 2 Wed, April 10, 2019","volume":"103 8 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-04-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Business Case for ABP MPD Use in Deepwater Gulf of Mexico\",\"authors\":\"Sharief Moghazy, R. V. Noort, S. Shayegi\",\"doi\":\"10.2118/194538-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Surface Applied Back Pressure Managed Pressure Drilling (MPD) systems provide a potentially game changing technology for Deepwater Gulf of Mexico drilling applications by means of annular pressure manipulation for drilling through narrow margins, cementing across potential loss zones, assisting in running completions, and mitigating non-productive time. The technology however, is not without cost and the challenge remains to build the business case to utilize MPD in Deepwater applications. Recently several wells were successfully drilled using this technology to the planned target depth accessing reserves that would not have been possible otherwise. This type of scenario where using MPD to stay within a narrow margin has been the means to justify the upfront costs to get a rig outfitted with MPD and the operating costs of the system during use. Once a rig is outfitted with MPD, the economics for a project shift, however, justifying the business case purely based on NPT savings is still not typically viable. This paper will provide the operator's perspective of the cost-benefit analysis for MPD use and provide business case examples for the use in Deepwater Gulf of Mexico. The impact of lessons learned on an ongoing campaign and the savings viable for this and other implementation scenarios will also be discussed to develop a robust case for MPD adoption.\",\"PeriodicalId\":11150,\"journal\":{\"name\":\"Day 2 Wed, April 10, 2019\",\"volume\":\"103 8 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-04-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Wed, April 10, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/194538-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, April 10, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/194538-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

地面应用背压控压钻井(MPD)系统为墨西哥湾深水钻井应用提供了一种潜在的改变游戏规则的技术,通过环空压力控制进行窄间隙钻井,在潜在漏失区域进行固井,协助下完井,减少非生产时间。然而,这项技术并非没有成本,在深水应用中建立MPD的商业案例仍然是一个挑战。最近,利用该技术成功钻探了几口井,达到了计划的目标深度,从而获得了原本不可能实现的储量。在这种情况下,使用MPD来保持较小的边际利润,这是证明安装MPD的钻机的前期成本和系统在使用过程中的运营成本是合理的。然而,一旦钻井平台配备了MPD,单纯基于节省NPT来证明商业案例的合理性仍然是不可行的。本文将为作业者提供MPD使用成本效益分析的视角,并提供在墨西哥湾深水使用MPD的商业案例。还将讨论经验教训对正在进行的活动的影响,以及该方案和其他实施方案的可行节省,以制定采用MPD的有力案例。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Business Case for ABP MPD Use in Deepwater Gulf of Mexico
Surface Applied Back Pressure Managed Pressure Drilling (MPD) systems provide a potentially game changing technology for Deepwater Gulf of Mexico drilling applications by means of annular pressure manipulation for drilling through narrow margins, cementing across potential loss zones, assisting in running completions, and mitigating non-productive time. The technology however, is not without cost and the challenge remains to build the business case to utilize MPD in Deepwater applications. Recently several wells were successfully drilled using this technology to the planned target depth accessing reserves that would not have been possible otherwise. This type of scenario where using MPD to stay within a narrow margin has been the means to justify the upfront costs to get a rig outfitted with MPD and the operating costs of the system during use. Once a rig is outfitted with MPD, the economics for a project shift, however, justifying the business case purely based on NPT savings is still not typically viable. This paper will provide the operator's perspective of the cost-benefit analysis for MPD use and provide business case examples for the use in Deepwater Gulf of Mexico. The impact of lessons learned on an ongoing campaign and the savings viable for this and other implementation scenarios will also be discussed to develop a robust case for MPD adoption.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信