一种估算矿石工作指标值的方法——以米度铜矿为例

Q4 Earth and Planetary Sciences
M. Noaparast, S. Rahmati, Golnaz Jozanikohan, S. Aslani, A. Ghorbani
{"title":"一种估算矿石工作指标值的方法——以米度铜矿为例","authors":"M. Noaparast, S. Rahmati, Golnaz Jozanikohan, S. Aslani, A. Ghorbani","doi":"10.22059/IJMGE.2012.51323","DOIUrl":null,"url":null,"abstract":"It is always attempted to reduce the costs of comminution in mineral processing plants. One of thedifficulties in size reduction section is not to be designed properly. The key factor to design size reductionunits such as crushers and grinding mills, is ore’s work index. The work index, wi, presents the oregrindability, and is used in Bond formula to calculate the required energy. Bond has defined a specificrelationship between some parameters which is applied to calculate wi, which are control screen, fineparticles produced, feed and product d80.In this research work, a high grade copper sample from Miduk copper concentrator was prepared, and itswork index values were experimentally estimated, using different control screens, 600, 425, 212, 150, 106and 75 microns. The obtained results from the tests showed two different behaviors in fine production.According to these two trends the required models were then defined to present the fine mass calculationusing control screen. In next step, an equation was presented in order to calculate Miduk copper ore workindex for any size. In addition to verify the model creditability, a test using 300 microns control screenwas performed and its result was compared with calculated ones using defined model, which showed agood fit. Finally the experimental and calculated values were compared and their relative error was equalto 4.11% which is an indication of good fit for the results.","PeriodicalId":36564,"journal":{"name":"International Journal of Mining and Geo-Engineering","volume":"75 1","pages":"133-140"},"PeriodicalIF":0.0000,"publicationDate":"2012-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"A Methodology to Estimate Ores Work Index Values, Using Miduk Copper Mine Sample\",\"authors\":\"M. Noaparast, S. Rahmati, Golnaz Jozanikohan, S. Aslani, A. Ghorbani\",\"doi\":\"10.22059/IJMGE.2012.51323\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"It is always attempted to reduce the costs of comminution in mineral processing plants. One of thedifficulties in size reduction section is not to be designed properly. The key factor to design size reductionunits such as crushers and grinding mills, is ore’s work index. The work index, wi, presents the oregrindability, and is used in Bond formula to calculate the required energy. Bond has defined a specificrelationship between some parameters which is applied to calculate wi, which are control screen, fineparticles produced, feed and product d80.In this research work, a high grade copper sample from Miduk copper concentrator was prepared, and itswork index values were experimentally estimated, using different control screens, 600, 425, 212, 150, 106and 75 microns. The obtained results from the tests showed two different behaviors in fine production.According to these two trends the required models were then defined to present the fine mass calculationusing control screen. In next step, an equation was presented in order to calculate Miduk copper ore workindex for any size. In addition to verify the model creditability, a test using 300 microns control screenwas performed and its result was compared with calculated ones using defined model, which showed agood fit. Finally the experimental and calculated values were compared and their relative error was equalto 4.11% which is an indication of good fit for the results.\",\"PeriodicalId\":36564,\"journal\":{\"name\":\"International Journal of Mining and Geo-Engineering\",\"volume\":\"75 1\",\"pages\":\"133-140\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Mining and Geo-Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22059/IJMGE.2012.51323\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Earth and Planetary Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Mining and Geo-Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22059/IJMGE.2012.51323","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 1

摘要

在矿物加工厂,人们总是试图降低粉碎成本。减径段设计不当是减径段设计的难点之一。矿石的工作指标是设计破碎机、磨机等减粒度装置的关键因素。功指数wi表示可磨性,用Bond公式计算所需能量。Bond定义了一些用于计算wi的参数之间的具体关系,这些参数是控制筛,产生的细颗粒,进料和产品d80。本研究以米杜克铜选矿厂为研究对象,在600、425、212、150、106和75微米的不同控制屏下制备了一种高品位铜样品,并对其工作指数进行了实验估计。试验得到的结果在精细生产中表现出两种不同的行为。根据这两种趋势,定义了用控制屏进行精细质量计算所需的模型。在此基础上,推导出了任一尺寸下Miduk铜矿工作指数的计算公式。为了验证模型的可信性,利用300微米控制屏进行了试验,并与定义模型的计算结果进行了比较,结果吻合较好。最后将实验值与计算值进行了比较,两者的相对误差为4.11%,表明结果吻合较好。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A Methodology to Estimate Ores Work Index Values, Using Miduk Copper Mine Sample
It is always attempted to reduce the costs of comminution in mineral processing plants. One of thedifficulties in size reduction section is not to be designed properly. The key factor to design size reductionunits such as crushers and grinding mills, is ore’s work index. The work index, wi, presents the oregrindability, and is used in Bond formula to calculate the required energy. Bond has defined a specificrelationship between some parameters which is applied to calculate wi, which are control screen, fineparticles produced, feed and product d80.In this research work, a high grade copper sample from Miduk copper concentrator was prepared, and itswork index values were experimentally estimated, using different control screens, 600, 425, 212, 150, 106and 75 microns. The obtained results from the tests showed two different behaviors in fine production.According to these two trends the required models were then defined to present the fine mass calculationusing control screen. In next step, an equation was presented in order to calculate Miduk copper ore workindex for any size. In addition to verify the model creditability, a test using 300 microns control screenwas performed and its result was compared with calculated ones using defined model, which showed agood fit. Finally the experimental and calculated values were compared and their relative error was equalto 4.11% which is an indication of good fit for the results.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
International Journal of Mining and Geo-Engineering
International Journal of Mining and Geo-Engineering Earth and Planetary Sciences-Geotechnical Engineering and Engineering Geology
CiteScore
0.80
自引率
0.00%
发文量
0
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信