优化基于fpr的供应商-零售商集成问题,包括外包商、返工、加速率和概率分解

IF 1.6 3区 工程技术 Q4 ENGINEERING, INDUSTRIAL
Y. Chiu, Chih-Yun Ke, Tiffany Chiu, Tsu-Ming Yeh
{"title":"优化基于fpr的供应商-零售商集成问题,包括外包商、返工、加速率和概率分解","authors":"Y. Chiu, Chih-Yun Ke, Tiffany Chiu, Tsu-Ming Yeh","doi":"10.5267/j.ijiec.2022.5.004","DOIUrl":null,"url":null,"abstract":"Internal supply chains exist in many global enterprises, where manufacturing tasks and sales jobs operate separately, but the management needs to integrate their financial performance reports. In addition, the fabrication planning must meet specific operational goals, such as meeting external clients’ requirements on quality and short order due dates, avoiding internal fabricating interruptions due to inevitable equipment breakdowns, and minimizing overall manufacturing and stock holding costs. Motivated by helping multinational corporations deal with the issues mentioned earlier, this study aims to optimize a finite production rate (FPR)-based supplier-retailer cooperative problem with multi-shipment, rework, subcontracting, probabilistic failure, and expedited rate. Wherein using an outsourcer and expedited-rate help shorten the needed batch producing time significantly; the rework of defects and corrective action on unanticipated breakdown assist in up-keeping the quality and avoiding fabricating delay. We develop an FPR-based model to cautiously represent the considered manufacturing features and activities involved in transporting end products and retailers’ stock holding. Model’s formulating and investigating assists us in gaining the function of operating costs. In addition, optimization procedures with a proposed algorithm help us verify its convexity and decide the model’s best fabricating runtime solution. Finally, we validate how this study works and what important information our model can disclose using a numerical example to facilitate management’s decision-making to end our work.","PeriodicalId":51356,"journal":{"name":"International Journal of Industrial Engineering Computations","volume":"1 1","pages":""},"PeriodicalIF":1.6000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Optimizing an FPR-based supplier-retailer integrated problem with an outsourcer, rework, expedited rate, and probabilistic breakdown\",\"authors\":\"Y. Chiu, Chih-Yun Ke, Tiffany Chiu, Tsu-Ming Yeh\",\"doi\":\"10.5267/j.ijiec.2022.5.004\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Internal supply chains exist in many global enterprises, where manufacturing tasks and sales jobs operate separately, but the management needs to integrate their financial performance reports. In addition, the fabrication planning must meet specific operational goals, such as meeting external clients’ requirements on quality and short order due dates, avoiding internal fabricating interruptions due to inevitable equipment breakdowns, and minimizing overall manufacturing and stock holding costs. Motivated by helping multinational corporations deal with the issues mentioned earlier, this study aims to optimize a finite production rate (FPR)-based supplier-retailer cooperative problem with multi-shipment, rework, subcontracting, probabilistic failure, and expedited rate. Wherein using an outsourcer and expedited-rate help shorten the needed batch producing time significantly; the rework of defects and corrective action on unanticipated breakdown assist in up-keeping the quality and avoiding fabricating delay. We develop an FPR-based model to cautiously represent the considered manufacturing features and activities involved in transporting end products and retailers’ stock holding. Model’s formulating and investigating assists us in gaining the function of operating costs. In addition, optimization procedures with a proposed algorithm help us verify its convexity and decide the model’s best fabricating runtime solution. Finally, we validate how this study works and what important information our model can disclose using a numerical example to facilitate management’s decision-making to end our work.\",\"PeriodicalId\":51356,\"journal\":{\"name\":\"International Journal of Industrial Engineering Computations\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Industrial Engineering Computations\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.5267/j.ijiec.2022.5.004\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Industrial Engineering Computations","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.5267/j.ijiec.2022.5.004","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 1

摘要

许多全球性企业都存在内部供应链,制造任务和销售工作是分开运作的,但管理层需要整合他们的财务绩效报告。此外,制造计划必须满足特定的运营目标,例如满足外部客户对质量和短订单交货期的要求,避免由于不可避免的设备故障而导致内部制造中断,并最大限度地降低整体制造和库存成本。为了帮助跨国公司解决上述问题,本研究旨在优化一个基于有限生产率(FPR)的多批次、返工、分包、概率失效和加速率的供应商-零售商合作问题。其中,使用外包商和加速速度有助于显著缩短所需的批量生产时间;对缺陷的返工和对意外故障的纠正措施有助于保持质量和避免制造延误。我们开发了一个基于fpr的模型,以谨慎地表示所考虑的制造特征和涉及运输最终产品和零售商库存的活动。模型的建立和研究有助于我们获得运营成本函数。此外,该算法的优化过程有助于我们验证其凸性并确定模型的最佳制造运行时解。最后,我们验证了这项研究是如何工作的,以及我们的模型可以使用一个数值例子来披露哪些重要信息,以促进管理层的决策,以结束我们的工作。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Optimizing an FPR-based supplier-retailer integrated problem with an outsourcer, rework, expedited rate, and probabilistic breakdown
Internal supply chains exist in many global enterprises, where manufacturing tasks and sales jobs operate separately, but the management needs to integrate their financial performance reports. In addition, the fabrication planning must meet specific operational goals, such as meeting external clients’ requirements on quality and short order due dates, avoiding internal fabricating interruptions due to inevitable equipment breakdowns, and minimizing overall manufacturing and stock holding costs. Motivated by helping multinational corporations deal with the issues mentioned earlier, this study aims to optimize a finite production rate (FPR)-based supplier-retailer cooperative problem with multi-shipment, rework, subcontracting, probabilistic failure, and expedited rate. Wherein using an outsourcer and expedited-rate help shorten the needed batch producing time significantly; the rework of defects and corrective action on unanticipated breakdown assist in up-keeping the quality and avoiding fabricating delay. We develop an FPR-based model to cautiously represent the considered manufacturing features and activities involved in transporting end products and retailers’ stock holding. Model’s formulating and investigating assists us in gaining the function of operating costs. In addition, optimization procedures with a proposed algorithm help us verify its convexity and decide the model’s best fabricating runtime solution. Finally, we validate how this study works and what important information our model can disclose using a numerical example to facilitate management’s decision-making to end our work.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
5.70
自引率
9.10%
发文量
35
审稿时长
20 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信