影响特立尼达和多巴哥公共部门项目三重限制的因素

IF 1.3 Q3 MANAGEMENT
Leighton Ellis, Hector Martin, Syra Ramcharitar
{"title":"影响特立尼达和多巴哥公共部门项目三重限制的因素","authors":"Leighton Ellis, Hector Martin, Syra Ramcharitar","doi":"10.1680/JMAPL.18.00047","DOIUrl":null,"url":null,"abstract":"The dynamic construction industry has seen many advances over the years, yet schedule delay, cost overrun and reduced quality are still prevalent, with little to no sign of improvement. Additionall...","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":"80 1","pages":""},"PeriodicalIF":1.3000,"publicationDate":"2019-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Factors influencing triple constraints in public sector projects in Trinidad and Tobago\",\"authors\":\"Leighton Ellis, Hector Martin, Syra Ramcharitar\",\"doi\":\"10.1680/JMAPL.18.00047\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The dynamic construction industry has seen many advances over the years, yet schedule delay, cost overrun and reduced quality are still prevalent, with little to no sign of improvement. Additionall...\",\"PeriodicalId\":44163,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Management Procurement and Law\",\"volume\":\"80 1\",\"pages\":\"\"},\"PeriodicalIF\":1.3000,\"publicationDate\":\"2019-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Management Procurement and Law\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/JMAPL.18.00047\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/JMAPL.18.00047","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 6

摘要

多年来,充满活力的建筑行业取得了许多进步,但进度延迟、成本超支和质量下降仍然普遍存在,几乎没有改善的迹象。Additionall……
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Factors influencing triple constraints in public sector projects in Trinidad and Tobago
The dynamic construction industry has seen many advances over the years, yet schedule delay, cost overrun and reduced quality are still prevalent, with little to no sign of improvement. Additionall...
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
4.00
自引率
16.70%
发文量
32
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信