{"title":"影响特立尼达和多巴哥公共部门项目三重限制的因素","authors":"Leighton Ellis, Hector Martin, Syra Ramcharitar","doi":"10.1680/JMAPL.18.00047","DOIUrl":null,"url":null,"abstract":"The dynamic construction industry has seen many advances over the years, yet schedule delay, cost overrun and reduced quality are still prevalent, with little to no sign of improvement. Additionall...","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":null,"pages":null},"PeriodicalIF":1.3000,"publicationDate":"2019-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Factors influencing triple constraints in public sector projects in Trinidad and Tobago\",\"authors\":\"Leighton Ellis, Hector Martin, Syra Ramcharitar\",\"doi\":\"10.1680/JMAPL.18.00047\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The dynamic construction industry has seen many advances over the years, yet schedule delay, cost overrun and reduced quality are still prevalent, with little to no sign of improvement. Additionall...\",\"PeriodicalId\":44163,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Management Procurement and Law\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.3000,\"publicationDate\":\"2019-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Management Procurement and Law\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/JMAPL.18.00047\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/JMAPL.18.00047","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
Factors influencing triple constraints in public sector projects in Trinidad and Tobago
The dynamic construction industry has seen many advances over the years, yet schedule delay, cost overrun and reduced quality are still prevalent, with little to no sign of improvement. Additionall...