{"title":"电网网络的路径输送","authors":"Falk Flade","doi":"10.25162/JGO-2020-0005","DOIUrl":null,"url":null,"abstract":"Poland’s shift westward as a result of World War II influenced the further development of both Polish and Eastern European electricity networks. During the appropriation of the new western territories, the center of the national power grid shifted from the Central Industrial District to Upper Silesia. Lower Silesia’s power grid, in turn, which had not been integrated into the national power grid until the mid-1950s, became a hub for electricity transmissions between East Germany, Poland, Czechoslovakia, and Hungary. High-voltage lines constructed before the war, as well as cross-border cooperation between the lignite mine in Turow and the coal power plant in Hirschfelde, were decisive factors in this development. They formed the starting point for an international, interconnected network which encompassed the entire Eastern Bloc from the mid-1960s.","PeriodicalId":54097,"journal":{"name":"JAHRBUCHER FUR GESCHICHTE OSTEUROPAS","volume":"70 1","pages":"78-94"},"PeriodicalIF":0.1000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Pfadabhängigkeiten in der Stromnetzinfrastruktur\",\"authors\":\"Falk Flade\",\"doi\":\"10.25162/JGO-2020-0005\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Poland’s shift westward as a result of World War II influenced the further development of both Polish and Eastern European electricity networks. During the appropriation of the new western territories, the center of the national power grid shifted from the Central Industrial District to Upper Silesia. Lower Silesia’s power grid, in turn, which had not been integrated into the national power grid until the mid-1950s, became a hub for electricity transmissions between East Germany, Poland, Czechoslovakia, and Hungary. High-voltage lines constructed before the war, as well as cross-border cooperation between the lignite mine in Turow and the coal power plant in Hirschfelde, were decisive factors in this development. They formed the starting point for an international, interconnected network which encompassed the entire Eastern Bloc from the mid-1960s.\",\"PeriodicalId\":54097,\"journal\":{\"name\":\"JAHRBUCHER FUR GESCHICHTE OSTEUROPAS\",\"volume\":\"70 1\",\"pages\":\"78-94\"},\"PeriodicalIF\":0.1000,\"publicationDate\":\"2020-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"JAHRBUCHER FUR GESCHICHTE OSTEUROPAS\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.25162/JGO-2020-0005\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"HISTORY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"JAHRBUCHER FUR GESCHICHTE OSTEUROPAS","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25162/JGO-2020-0005","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"HISTORY","Score":null,"Total":0}
引用次数: 0

摘要

第二次世界大战的结果是波兰向西转移,影响了波兰和东欧电网的进一步发展。在西部新领土的侵占过程中,国家电网的中心从中央工业区转移到上西里西亚。下西里西亚的电网直到20世纪50年代中期才被纳入国家电网,成为东德、波兰、捷克斯洛伐克和匈牙利之间的输电枢纽。战前修建的高压线,以及图罗褐煤矿和赫施费尔德煤电厂之间的跨界合作,是这一发展的决定性因素。从1960年代中期开始,它们形成了一个包括整个东方集团的相互联系的国际网络的起点。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Pfadabhängigkeiten in der Stromnetzinfrastruktur
Poland’s shift westward as a result of World War II influenced the further development of both Polish and Eastern European electricity networks. During the appropriation of the new western territories, the center of the national power grid shifted from the Central Industrial District to Upper Silesia. Lower Silesia’s power grid, in turn, which had not been integrated into the national power grid until the mid-1950s, became a hub for electricity transmissions between East Germany, Poland, Czechoslovakia, and Hungary. High-voltage lines constructed before the war, as well as cross-border cooperation between the lignite mine in Turow and the coal power plant in Hirschfelde, were decisive factors in this development. They formed the starting point for an international, interconnected network which encompassed the entire Eastern Bloc from the mid-1960s.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信