登巴萨市一个公共加油站的燃油站的太阳能发电厂筹划分析

I. P. Juliawan, I. N. Setiawan, I. W. Sukerayasa
{"title":"登巴萨市一个公共加油站的燃油站的太阳能发电厂筹划分析","authors":"I. P. Juliawan, I. N. Setiawan, I. W. Sukerayasa","doi":"10.24843/spektrum.2022.v09.i01.p10","DOIUrl":null,"url":null,"abstract":"Utilization of renewable energy as a source of electrical energy is an environmentallyfriendly energy development, one of which is the use of solar energy by developing solar PV onthe roof of buildings as a medium for installing solar modules. In this study, a rooftop solar PVplan was carried out at the Nangka Utara gas station as a source of electrical energy whichaims to reduce the cost of PLN electricity bills. The rooftop solar PV system at the Nangka Utaragas station uses an On-grid solar PV system without batteries, using 36 units of 415 Wpmonocrystalline solar modules and one 15kW inverter unit. Planning for rooftop solar PV of theNangka Utara gas station with a capacity of 14.9 kWp with the resulting energy production of20.43 MWh per year. The initial investment cost required is IDR. 101.179,000 with a paybackperiod of 5 years and 8 months.","PeriodicalId":30870,"journal":{"name":"Jurnal Ilmiah Spektrum","volume":"5 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ANALISA PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA SEBAGAI ENERGI PENGGERAK POMPA MINYAK PADA STASIUN PENGISIAN BAHAN BAKAR UMUM DI KOTA DENPASAR\",\"authors\":\"I. P. Juliawan, I. N. Setiawan, I. W. Sukerayasa\",\"doi\":\"10.24843/spektrum.2022.v09.i01.p10\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Utilization of renewable energy as a source of electrical energy is an environmentallyfriendly energy development, one of which is the use of solar energy by developing solar PV onthe roof of buildings as a medium for installing solar modules. In this study, a rooftop solar PVplan was carried out at the Nangka Utara gas station as a source of electrical energy whichaims to reduce the cost of PLN electricity bills. The rooftop solar PV system at the Nangka Utaragas station uses an On-grid solar PV system without batteries, using 36 units of 415 Wpmonocrystalline solar modules and one 15kW inverter unit. Planning for rooftop solar PV of theNangka Utara gas station with a capacity of 14.9 kWp with the resulting energy production of20.43 MWh per year. The initial investment cost required is IDR. 101.179,000 with a paybackperiod of 5 years and 8 months.\",\"PeriodicalId\":30870,\"journal\":{\"name\":\"Jurnal Ilmiah Spektrum\",\"volume\":\"5 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Ilmiah Spektrum\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24843/spektrum.2022.v09.i01.p10\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ilmiah Spektrum","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24843/spektrum.2022.v09.i01.p10","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

利用可再生能源作为电能来源是一种环保的能源发展,其中一种是利用太阳能,在建筑物屋顶上发展太阳能光伏,作为安装太阳能组件的介质。在这项研究中,在Nangka Utara加油站进行了屋顶太阳能pv计划,作为电能的来源,旨在降低PLN电费成本。Nangka Utaragas电站的屋顶太阳能光伏系统使用无电池的并网太阳能光伏系统,使用36个415mw单晶太阳能模块和一个15kW逆变器。规划theNangka Utara加油站的屋顶太阳能光伏发电,容量为14.9 kWp,每年发电量为20.43 MWh。所需初始投资成本为印尼盾。101.179,000,投资回收期为5年零8个月。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ANALISA PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA SEBAGAI ENERGI PENGGERAK POMPA MINYAK PADA STASIUN PENGISIAN BAHAN BAKAR UMUM DI KOTA DENPASAR
Utilization of renewable energy as a source of electrical energy is an environmentallyfriendly energy development, one of which is the use of solar energy by developing solar PV onthe roof of buildings as a medium for installing solar modules. In this study, a rooftop solar PVplan was carried out at the Nangka Utara gas station as a source of electrical energy whichaims to reduce the cost of PLN electricity bills. The rooftop solar PV system at the Nangka Utaragas station uses an On-grid solar PV system without batteries, using 36 units of 415 Wpmonocrystalline solar modules and one 15kW inverter unit. Planning for rooftop solar PV of theNangka Utara gas station with a capacity of 14.9 kWp with the resulting energy production of20.43 MWh per year. The initial investment cost required is IDR. 101.179,000 with a paybackperiod of 5 years and 8 months.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信