马来西亚一新建医院大楼的霉菌生长风险-问题与解决办法

Q2 Engineering
Hairul Faizi Parham, N. Ishak, Zahiruddin Fitri Abu Hassan
{"title":"马来西亚一新建医院大楼的霉菌生长风险-问题与解决办法","authors":"Hairul Faizi Parham, N. Ishak, Zahiruddin Fitri Abu Hassan","doi":"10.22452/jdbe.sp2018no1.2","DOIUrl":null,"url":null,"abstract":"Post Construction Assessment (PCA) provides critical feedback for project stakeholders to be able to evaluate and design construction processes as well as building maintainability. This paper aims to evaluate the problems caused by indoor environmental quality (IEQ) contaminants, particularly mold growth during PCA in a newly built hospital and to identify the potential solutions. Mold growth risk analysis which is a part of IEQ monitoring during PCA has not been widely emphasized, and thus leads to the creation of uncertainties in many new public hospitals in Malaysia. IEQ exercises were not prioritized during PCA not until when new mold growth occurred and were alleviated. Questionnaires were distributed to hospital projects’ stakeholders to identify the criteria of PCA with regards to mold growth in the new hospital’s indoor air. Results showed that post construction defects coupled with building design and construction quality as well as building operational issues was significant criteria that should be evaluated during the PCA of a newly built hospital. Stakeholders’ firm viewpoint on the key criteria is to be applied as a valuable input for identifying possible solutions as significant inputs in PCA for a newly built hospital.","PeriodicalId":37954,"journal":{"name":"Journal of Design and Built Environment","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2018-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Mold Growth Risk in a Newly Built Hospital Building in Malaysia – Problems and Solutions\",\"authors\":\"Hairul Faizi Parham, N. Ishak, Zahiruddin Fitri Abu Hassan\",\"doi\":\"10.22452/jdbe.sp2018no1.2\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Post Construction Assessment (PCA) provides critical feedback for project stakeholders to be able to evaluate and design construction processes as well as building maintainability. This paper aims to evaluate the problems caused by indoor environmental quality (IEQ) contaminants, particularly mold growth during PCA in a newly built hospital and to identify the potential solutions. Mold growth risk analysis which is a part of IEQ monitoring during PCA has not been widely emphasized, and thus leads to the creation of uncertainties in many new public hospitals in Malaysia. IEQ exercises were not prioritized during PCA not until when new mold growth occurred and were alleviated. Questionnaires were distributed to hospital projects’ stakeholders to identify the criteria of PCA with regards to mold growth in the new hospital’s indoor air. Results showed that post construction defects coupled with building design and construction quality as well as building operational issues was significant criteria that should be evaluated during the PCA of a newly built hospital. Stakeholders’ firm viewpoint on the key criteria is to be applied as a valuable input for identifying possible solutions as significant inputs in PCA for a newly built hospital.\",\"PeriodicalId\":37954,\"journal\":{\"name\":\"Journal of Design and Built Environment\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-06-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Design and Built Environment\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22452/jdbe.sp2018no1.2\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Design and Built Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22452/jdbe.sp2018no1.2","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 2

摘要

施工后评估(PCA)为项目利益相关者提供关键的反馈,以便能够评估和设计施工过程以及建筑的可维护性。本文旨在评价某新建医院室内环境质量(IEQ)污染物引起的问题,特别是在PCA期间霉菌的生长,并确定潜在的解决方案。霉菌生长风险分析是PCA期间IEQ监测的一部分,尚未得到广泛强调,因此导致马来西亚许多新公立医院产生不确定性。在PCA期间,直到新的霉菌生长发生并缓解,IEQ练习才被优先考虑。调查问卷分发给医院项目的利益相关者,以确定PCA在新医院室内空气中霉菌生长方面的标准。结果表明,建筑设计、施工质量和建筑运行问题是新建医院PCA评估的重要标准。利益相关者对关键标准的坚定观点将作为有价值的投入,用于确定可能的解决方案,作为新建医院PCA的重要投入。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Mold Growth Risk in a Newly Built Hospital Building in Malaysia – Problems and Solutions
Post Construction Assessment (PCA) provides critical feedback for project stakeholders to be able to evaluate and design construction processes as well as building maintainability. This paper aims to evaluate the problems caused by indoor environmental quality (IEQ) contaminants, particularly mold growth during PCA in a newly built hospital and to identify the potential solutions. Mold growth risk analysis which is a part of IEQ monitoring during PCA has not been widely emphasized, and thus leads to the creation of uncertainties in many new public hospitals in Malaysia. IEQ exercises were not prioritized during PCA not until when new mold growth occurred and were alleviated. Questionnaires were distributed to hospital projects’ stakeholders to identify the criteria of PCA with regards to mold growth in the new hospital’s indoor air. Results showed that post construction defects coupled with building design and construction quality as well as building operational issues was significant criteria that should be evaluated during the PCA of a newly built hospital. Stakeholders’ firm viewpoint on the key criteria is to be applied as a valuable input for identifying possible solutions as significant inputs in PCA for a newly built hospital.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Design and Built Environment
Journal of Design and Built Environment Engineering-Architecture
CiteScore
1.70
自引率
0.00%
发文量
7
审稿时长
16 weeks
期刊介绍: The Journal of Design and Built Environment (JDBE) is a SCOPUS-indexed and free open access publication by the Faculty of Built Environment, University of Malaya. Published biannually, JDBE usually contains four academic papers of wide-ranging topics reporting on issues in the built environment, i.e. architecture and design including landscape architecture, urban and regional planning and studies, building and quantity surveys and real estate studies and management.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信