国防部合同中工程变更需求的可能性和成本影响

Q3 Decision Sciences
J. Ellis, E. White, J. Ritschel, Shawn M. Valentine, B. Lucas, Ian S. Cordell
{"title":"国防部合同中工程变更需求的可能性和成本影响","authors":"J. Ellis, E. White, J. Ritschel, Shawn M. Valentine, B. Lucas, Ian S. Cordell","doi":"10.1108/JDAL-02-2018-0002","DOIUrl":null,"url":null,"abstract":"\nPurpose\nThere appears to be no empirical-based method in the literature for estimating if an engineering change proposal (ECP) will occur or the dollar amount incurred. This paper aims to present an empirically based approach to address this shortfall.\n\n\nDesign/methodology/approach\nUsing the cost assessment data enterprise database, 533 contracts were randomly selected via a stratified sampling plan to build two regression models: one to predict the likelihood of a contract experiencing an ECP and the other to determine the expected median per cent increase in baseline contract cost if an ECP was likely. Both models adopted a stepwise approach. A validation set was placed aside prior to any model building.\n\n\nFindings\nNot every contract incurs an ECP; approximately 80 per cent of the contracts in the database did not have an ECP. The likelihood of an ECP and the additional amount incurred appears to be statistically independent of acquisition phase, branch of service, commodity, contract type or any other factor except for the basic contract amount and the number of contract line item numbers; both of these later variables equally affected the contract percentage increase because of an ECP. The combined model overall bested current anecdotal approaches to ECP withhold.\n\n\nOriginality/value\nThis paper both serves as a published reference point for ECP withholds in the archival forum and presents an empirically based method for determining per cent ECP withhold to use.\n","PeriodicalId":32838,"journal":{"name":"Journal of Defense Analytics and Logistics","volume":"92 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-08-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Likelihood and cost impact of engineering change requirements for DoD contracts\",\"authors\":\"J. Ellis, E. White, J. Ritschel, Shawn M. Valentine, B. Lucas, Ian S. Cordell\",\"doi\":\"10.1108/JDAL-02-2018-0002\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nPurpose\\nThere appears to be no empirical-based method in the literature for estimating if an engineering change proposal (ECP) will occur or the dollar amount incurred. This paper aims to present an empirically based approach to address this shortfall.\\n\\n\\nDesign/methodology/approach\\nUsing the cost assessment data enterprise database, 533 contracts were randomly selected via a stratified sampling plan to build two regression models: one to predict the likelihood of a contract experiencing an ECP and the other to determine the expected median per cent increase in baseline contract cost if an ECP was likely. Both models adopted a stepwise approach. A validation set was placed aside prior to any model building.\\n\\n\\nFindings\\nNot every contract incurs an ECP; approximately 80 per cent of the contracts in the database did not have an ECP. The likelihood of an ECP and the additional amount incurred appears to be statistically independent of acquisition phase, branch of service, commodity, contract type or any other factor except for the basic contract amount and the number of contract line item numbers; both of these later variables equally affected the contract percentage increase because of an ECP. The combined model overall bested current anecdotal approaches to ECP withhold.\\n\\n\\nOriginality/value\\nThis paper both serves as a published reference point for ECP withholds in the archival forum and presents an empirically based method for determining per cent ECP withhold to use.\\n\",\"PeriodicalId\":32838,\"journal\":{\"name\":\"Journal of Defense Analytics and Logistics\",\"volume\":\"92 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-08-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Defense Analytics and Logistics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/JDAL-02-2018-0002\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Decision Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Defense Analytics and Logistics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/JDAL-02-2018-0002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Decision Sciences","Score":null,"Total":0}
引用次数: 0

摘要

目的在文献中似乎没有基于经验的方法来估计工程变更提案(ECP)是否会发生或产生的金额。本文旨在提出一种基于经验的方法来解决这一不足。设计/方法/方法使用成本评估数据企业数据库,通过分层抽样计划随机选择533个合同,建立两个回归模型:一个用于预测合同经历ECP的可能性,另一个用于确定如果可能发生ECP,基线合同成本的预期中位数增长百分比。两个模型都采用了逐步方法。在任何模型构建之前,先放置一个验证集。并非每个合同都会发生ECP;数据库中大约80%的合同没有ECP。发生ECP的可能性和产生的额外金额在统计上似乎与采购阶段、服务部门、商品、合同类型或任何其他因素无关,但基本合同金额和合同项目编号的数量除外;由于ECP,后两个变量对合同百分比的增加都有同样的影响。综合模型总体上优于目前对ECP隐瞒的轶事方法。原创性/价值本文既作为档案论坛中ECP保留的出版参考点,又提出了一种基于经验的方法来确定要使用的ECP保留的百分比。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Likelihood and cost impact of engineering change requirements for DoD contracts
Purpose There appears to be no empirical-based method in the literature for estimating if an engineering change proposal (ECP) will occur or the dollar amount incurred. This paper aims to present an empirically based approach to address this shortfall. Design/methodology/approach Using the cost assessment data enterprise database, 533 contracts were randomly selected via a stratified sampling plan to build two regression models: one to predict the likelihood of a contract experiencing an ECP and the other to determine the expected median per cent increase in baseline contract cost if an ECP was likely. Both models adopted a stepwise approach. A validation set was placed aside prior to any model building. Findings Not every contract incurs an ECP; approximately 80 per cent of the contracts in the database did not have an ECP. The likelihood of an ECP and the additional amount incurred appears to be statistically independent of acquisition phase, branch of service, commodity, contract type or any other factor except for the basic contract amount and the number of contract line item numbers; both of these later variables equally affected the contract percentage increase because of an ECP. The combined model overall bested current anecdotal approaches to ECP withhold. Originality/value This paper both serves as a published reference point for ECP withholds in the archival forum and presents an empirically based method for determining per cent ECP withhold to use.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
0.90
自引率
0.00%
发文量
5
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信