高架单轨公路有效利用预备产品组合固定技术

L. Shyrin, A. Herasymenko, O. Koptovets, S. Felonenko
{"title":"高架单轨公路有效利用预备产品组合固定技术","authors":"L. Shyrin, A. Herasymenko, O. Koptovets, S. Felonenko","doi":"10.33271/crpnmu/72.077","DOIUrl":null,"url":null,"abstract":"Purpose. Justification of the parameters and design of the system of combined fastening of the monorail pond of the suspended monorail roads in formation underground workings to reduce dynamic loads on the elements of the arch fastening and the mining massif during the delivery of large-tonnage loads and equipment to preparatory pits and assembly chambers. The methods. The recommended method of substantiating the technological schemes of auxiliary transport, focused on the use of multifunctional mining equipment of the new generation, adapted to the modern conditions of performing assembly and dismantling works and preparing new mining pillars for cleaning extraction, which is based on the modeling of the parameters of the interaction of the rolling stock of suspended monorail roads with arch fastening elements and side rocks during transportation of large-tonnage cargoes. Findings. According to the results of research into the operational parameters of suspended monorail roads as part of a highly adaptive transport and technological system for the delivery of large-tonnage cargo, it was established that to reduce dynamic loads on the elements of the arch fastening and the mining massif in the specific conditions of the mines of Western Donbass, the most promising option is the two-level anchor fastening of the monorail stand and preparatory product. The originality. Innovative technical solutions to increase the operational reliability of the arch attachment during the transportation of large-tonnage loads and reduce dynamic loads on the mining massif by redistributing them to adjacent links of the monorail pond and modernizing the transport and technological system are substantiated. Practical implementation. It has been proven that during the intensification of cleaning and preparatory work, reasonable technical and technological solutions meet the requirements for the timely preparation of new mining pillars and are considered as a promising direction for improving the current schemes of auxiliary transport for the mines of the region and ensuring the operational parameters of mining transport equipment of a high technical level in the specific conditions of the mines of the Western Donbass.","PeriodicalId":10466,"journal":{"name":"Collection of Research Papers of the National Mining University","volume":"9 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Technology of combined fixing of preparatory products for efficient use of suspended monorail roads\",\"authors\":\"L. Shyrin, A. Herasymenko, O. Koptovets, S. Felonenko\",\"doi\":\"10.33271/crpnmu/72.077\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Purpose. Justification of the parameters and design of the system of combined fastening of the monorail pond of the suspended monorail roads in formation underground workings to reduce dynamic loads on the elements of the arch fastening and the mining massif during the delivery of large-tonnage loads and equipment to preparatory pits and assembly chambers. The methods. The recommended method of substantiating the technological schemes of auxiliary transport, focused on the use of multifunctional mining equipment of the new generation, adapted to the modern conditions of performing assembly and dismantling works and preparing new mining pillars for cleaning extraction, which is based on the modeling of the parameters of the interaction of the rolling stock of suspended monorail roads with arch fastening elements and side rocks during transportation of large-tonnage cargoes. Findings. According to the results of research into the operational parameters of suspended monorail roads as part of a highly adaptive transport and technological system for the delivery of large-tonnage cargo, it was established that to reduce dynamic loads on the elements of the arch fastening and the mining massif in the specific conditions of the mines of Western Donbass, the most promising option is the two-level anchor fastening of the monorail stand and preparatory product. The originality. Innovative technical solutions to increase the operational reliability of the arch attachment during the transportation of large-tonnage loads and reduce dynamic loads on the mining massif by redistributing them to adjacent links of the monorail pond and modernizing the transport and technological system are substantiated. Practical implementation. It has been proven that during the intensification of cleaning and preparatory work, reasonable technical and technological solutions meet the requirements for the timely preparation of new mining pillars and are considered as a promising direction for improving the current schemes of auxiliary transport for the mines of the region and ensuring the operational parameters of mining transport equipment of a high technical level in the specific conditions of the mines of the Western Donbass.\",\"PeriodicalId\":10466,\"journal\":{\"name\":\"Collection of Research Papers of the National Mining University\",\"volume\":\"9 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Collection of Research Papers of the National Mining University\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33271/crpnmu/72.077\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Collection of Research Papers of the National Mining University","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33271/crpnmu/72.077","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

目的。为减小大吨位载荷及设备向预备坑、装配室输送过程中拱系构件和矿体所受动载荷,对悬挂式单轨公路地下工场单轨塘联合紧固系统进行了参数论证和设计。的方法。建议的辅助运输技术方案的具体化方法,重点是使用新一代的多功能采矿设备,适应进行装配和拆卸工作和准备新的矿柱进行清洁提取的现代条件;建立了大吨位货物运输过程中悬索式单轨公路车辆与拱系构件及侧岩相互作用参数的模型。发现。根据对悬挂式单轨公路作为大吨位货物运输的高适应性运输和技术系统的一部分的运行参数的研究结果,确定了在顿巴斯西部矿山的具体条件下,为了减少拱桥紧固元件和采矿体的动载荷,最有希望的选择是单轨支架和预备产品的两级锚固紧固。的创意。提出了创新的技术解决方案,通过将大吨位载荷重新分配到单轨矿坑的相邻环节以及实现运输和技术系统的现代化,提高拱桥附件在运输过程中的运行可靠性,减少矿体的动载荷。实际的实现。实践证明,在加强清理准备工作的过程中,合理的技术和工艺方案能够满足及时准备新矿柱的要求,是改进该地区矿山现有辅助运输方案,保证西顿巴斯矿山具体条件下高技术水平矿山运输设备运行参数的一个有希望的方向。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Technology of combined fixing of preparatory products for efficient use of suspended monorail roads
Purpose. Justification of the parameters and design of the system of combined fastening of the monorail pond of the suspended monorail roads in formation underground workings to reduce dynamic loads on the elements of the arch fastening and the mining massif during the delivery of large-tonnage loads and equipment to preparatory pits and assembly chambers. The methods. The recommended method of substantiating the technological schemes of auxiliary transport, focused on the use of multifunctional mining equipment of the new generation, adapted to the modern conditions of performing assembly and dismantling works and preparing new mining pillars for cleaning extraction, which is based on the modeling of the parameters of the interaction of the rolling stock of suspended monorail roads with arch fastening elements and side rocks during transportation of large-tonnage cargoes. Findings. According to the results of research into the operational parameters of suspended monorail roads as part of a highly adaptive transport and technological system for the delivery of large-tonnage cargo, it was established that to reduce dynamic loads on the elements of the arch fastening and the mining massif in the specific conditions of the mines of Western Donbass, the most promising option is the two-level anchor fastening of the monorail stand and preparatory product. The originality. Innovative technical solutions to increase the operational reliability of the arch attachment during the transportation of large-tonnage loads and reduce dynamic loads on the mining massif by redistributing them to adjacent links of the monorail pond and modernizing the transport and technological system are substantiated. Practical implementation. It has been proven that during the intensification of cleaning and preparatory work, reasonable technical and technological solutions meet the requirements for the timely preparation of new mining pillars and are considered as a promising direction for improving the current schemes of auxiliary transport for the mines of the region and ensuring the operational parameters of mining transport equipment of a high technical level in the specific conditions of the mines of the Western Donbass.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信