{"title":"挖掘复杂成熟河流储层潜力降低地质不确定性——以渤海湾D-X油田再开发规划为例","authors":"Yifan He","doi":"10.2523/IPTC-19415-MS","DOIUrl":null,"url":null,"abstract":"\n D-X oilfield implemented an infill adjustment from 2013 to 2015, adding 101 development wells, two central processing platforms and two wellhead platforms.\n After the adjustment, the oil field greatly improved the engineering processing capacity, but it had also entered a period of rapid decline. In order to mitigate the decline and improve the recovery rate, 65 adjustment wells were implemented in this oilfield after the first adjustment. Based on the new drilling data and production data, earlier inefficient well management was turned a more efficient well management, where the engineering processing space is fully utilized, the decline of oil field is alleviated, and the development effect is greatly improved.\n This this paper expounds how to excavate the potential again after the redevelopment project in large fluvial facies oilfield in Bohai bay, taking this oilfield as an example.","PeriodicalId":11267,"journal":{"name":"Day 3 Thu, March 28, 2019","volume":"42 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-03-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Tap the Potentials and Reduce the Geological Uncertainties of Mature Complex Fluvial Reservoir: Case Study Redevelopment Plan of D-X Oilfield in Bohai Bay\",\"authors\":\"Yifan He\",\"doi\":\"10.2523/IPTC-19415-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n D-X oilfield implemented an infill adjustment from 2013 to 2015, adding 101 development wells, two central processing platforms and two wellhead platforms.\\n After the adjustment, the oil field greatly improved the engineering processing capacity, but it had also entered a period of rapid decline. In order to mitigate the decline and improve the recovery rate, 65 adjustment wells were implemented in this oilfield after the first adjustment. Based on the new drilling data and production data, earlier inefficient well management was turned a more efficient well management, where the engineering processing space is fully utilized, the decline of oil field is alleviated, and the development effect is greatly improved.\\n This this paper expounds how to excavate the potential again after the redevelopment project in large fluvial facies oilfield in Bohai bay, taking this oilfield as an example.\",\"PeriodicalId\":11267,\"journal\":{\"name\":\"Day 3 Thu, March 28, 2019\",\"volume\":\"42 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-03-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Thu, March 28, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2523/IPTC-19415-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, March 28, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2523/IPTC-19415-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

D-X油田在2013年至2015年期间进行了充填调整,增加了101口开发井、2个中央处理平台和2个井口平台。油田经过调整后,工程处理能力大大提高,但也进入了快速衰退期。为了减缓下降趋势,提高采收率,在第一次调整后,该油田共实施了65口调整井。根据新的钻井数据和生产数据,实现了早期低效井管理向高效井管理转变,充分利用了工程处理空间,缓解了油田的衰退,大大提高了开发效果。本文以该油田为例,阐述了渤海湾大型河流相油田改造工程后如何重新挖掘潜力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Tap the Potentials and Reduce the Geological Uncertainties of Mature Complex Fluvial Reservoir: Case Study Redevelopment Plan of D-X Oilfield in Bohai Bay
D-X oilfield implemented an infill adjustment from 2013 to 2015, adding 101 development wells, two central processing platforms and two wellhead platforms. After the adjustment, the oil field greatly improved the engineering processing capacity, but it had also entered a period of rapid decline. In order to mitigate the decline and improve the recovery rate, 65 adjustment wells were implemented in this oilfield after the first adjustment. Based on the new drilling data and production data, earlier inefficient well management was turned a more efficient well management, where the engineering processing space is fully utilized, the decline of oil field is alleviated, and the development effect is greatly improved. This this paper expounds how to excavate the potential again after the redevelopment project in large fluvial facies oilfield in Bohai bay, taking this oilfield as an example.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信