使用1英寸切削齿PDC钻头,在两天内完成一期井作业:成熟油田钻井优化案例记录

B. Sayogyo, Aditya Hermawan, Bastian Andoni
{"title":"使用1英寸切削齿PDC钻头,在两天内完成一期井作业:成熟油田钻井优化案例记录","authors":"B. Sayogyo, Aditya Hermawan, Bastian Andoni","doi":"10.4043/31638-ms","DOIUrl":null,"url":null,"abstract":"\n Mahakam Block is a huge oil and gas concession managed by PT. Pertamina Hulu Mahakam (PHM) and located in deltaic and offshore environment in East Kalimantan, Indonesia. Until today, the field has produced oil and gas for more than 50 years and categorized as \"brown field\" due to its declining production and marginal reserve potential. This condition has led to numerous effort to boost efficiency in well delivery from drilling perspective such that the reserve could be produced more economically.\n One of the effort that has been done to create a well to be more economical is by increasing the Rate of Penetration (ROP). An increase in ROP would directly impact on well duration that could be finished faster in such that it would also impact on much lower well cost. There are several key factors that influence ROP, yet the most crucial part is coming from drilling bit design that is used to drill the formation. Incompatibility between bit design with formation and directional drive type would often result in slow drilling progress and thus would make a well less profitable. To support this idea, the operator has launched a campaign called MAXIDRILL with aim to have a persistent excellent drilling performance from ROP perspective. Selective approach to different bit designs and bit suppliers has brought the operator to conduct the first trial in Indonesia utilizing a one inch PDC cutter drill bit.\n Besides the effort to increase well economics by increasing ROP using various bit designs through MAXIDRILL Campaign, PHM also tries to implement new set of well architecture dedicated specifically for developing the shallow hydrocarbon zone in Mahakam in general, and in Tunu Field in particular. With this new type of architecture, it allows drilling with 9-1/2″ hole to be done straight from 20″ Conductor Pipe down to well final target depth in single phase, where next 3-1/2″ production tubing will be run and cemented in place. The new design of architecture is called \"One Phase Well\". This novel innovation was initiated in 2019, where to date, the operator has drilled more than 30 wells without any incident.\n With the learning curve that has turned into industrialization steps. More and more shorter well duration is born with these two initiatives, MAXIDRILL and One Phase Well. Ultimately, with the spirit of these two initiatives for bringing down well duration in gain for much better well economics has successfully set a two record breaking performance in Mahakam: 1) Being the fastest On Bottom ROP and 2) Being the fastest well ever delivered in Mahakam and Indonesia which is under two days.","PeriodicalId":11011,"journal":{"name":"Day 3 Thu, March 24, 2022","volume":"19 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-03-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Delivering a One Phase Well Under Two Days with a One Inch Cutter PDC Drill Bit: A Record Breaking Performance in Mature Field, Drilling Optimization Case History\",\"authors\":\"B. Sayogyo, Aditya Hermawan, Bastian Andoni\",\"doi\":\"10.4043/31638-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Mahakam Block is a huge oil and gas concession managed by PT. Pertamina Hulu Mahakam (PHM) and located in deltaic and offshore environment in East Kalimantan, Indonesia. Until today, the field has produced oil and gas for more than 50 years and categorized as \\\"brown field\\\" due to its declining production and marginal reserve potential. This condition has led to numerous effort to boost efficiency in well delivery from drilling perspective such that the reserve could be produced more economically.\\n One of the effort that has been done to create a well to be more economical is by increasing the Rate of Penetration (ROP). An increase in ROP would directly impact on well duration that could be finished faster in such that it would also impact on much lower well cost. There are several key factors that influence ROP, yet the most crucial part is coming from drilling bit design that is used to drill the formation. Incompatibility between bit design with formation and directional drive type would often result in slow drilling progress and thus would make a well less profitable. To support this idea, the operator has launched a campaign called MAXIDRILL with aim to have a persistent excellent drilling performance from ROP perspective. Selective approach to different bit designs and bit suppliers has brought the operator to conduct the first trial in Indonesia utilizing a one inch PDC cutter drill bit.\\n Besides the effort to increase well economics by increasing ROP using various bit designs through MAXIDRILL Campaign, PHM also tries to implement new set of well architecture dedicated specifically for developing the shallow hydrocarbon zone in Mahakam in general, and in Tunu Field in particular. With this new type of architecture, it allows drilling with 9-1/2″ hole to be done straight from 20″ Conductor Pipe down to well final target depth in single phase, where next 3-1/2″ production tubing will be run and cemented in place. The new design of architecture is called \\\"One Phase Well\\\". This novel innovation was initiated in 2019, where to date, the operator has drilled more than 30 wells without any incident.\\n With the learning curve that has turned into industrialization steps. More and more shorter well duration is born with these two initiatives, MAXIDRILL and One Phase Well. Ultimately, with the spirit of these two initiatives for bringing down well duration in gain for much better well economics has successfully set a two record breaking performance in Mahakam: 1) Being the fastest On Bottom ROP and 2) Being the fastest well ever delivered in Mahakam and Indonesia which is under two days.\",\"PeriodicalId\":11011,\"journal\":{\"name\":\"Day 3 Thu, March 24, 2022\",\"volume\":\"19 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-03-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Thu, March 24, 2022\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4043/31638-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, March 24, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/31638-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

Mahakam区块是由PT. Pertamina Hulu Mahakam (PHM)管理的一个巨大的油气特许权,位于印度尼西亚东加里曼丹的三角洲和海上环境中。到目前为止,该油田已经生产了50多年的石油和天然气,由于其产量下降和边际储量潜力,被归类为“棕色油田”。从钻井的角度来看,这种情况导致了大量的努力来提高钻井效率,以便更经济地开采储量。为了提高经济效益,人们所做的一项努力是提高机械钻速(ROP)。机械钻速的提高将直接影响井的工期,从而可以更快地完成作业,从而大大降低井的成本。影响机械钻速的关键因素有几个,但最关键的部分是用于钻入地层的钻头设计。钻头设计与地层和定向驱动类型之间的不兼容通常会导致钻井进度缓慢,从而降低井的利润。为了支持这一想法,作业者发起了一项名为MAXIDRILL的活动,旨在从ROP的角度获得持续优异的钻井性能。通过选择不同的钻头设计和钻头供应商,作业者在印度尼西亚使用1英寸PDC切削钻头进行了首次试验。除了通过MAXIDRILL Campaign使用各种钻头设计提高机械钻速来提高井的经济效益外,PHM还试图实施一套新的井结构,专门用于开发Mahakam的浅层油气带,特别是在Tunu油田。采用这种新型结构,9-1/2″井眼可以直接从20″导电管到井的最终目标深度,在此阶段下入3-1/2″生产油管并进行固井。这种新的建筑设计被称为“一期井”。这项创新始于2019年,迄今为止,运营商已经钻了30多口井,没有发生任何事故。随着学习曲线转变为工业化的步骤。随着MAXIDRILL和One Phase well这两项计划的推出,井的持续时间越来越短。最终,凭借这两项举措的精神,缩短了井的持续时间,获得了更好的油井经济效益,成功地在Mahakam创造了两个破纪录的表现:1)成为最快的底部ROP; 2)在Mahakam和印度尼西亚,在两天内成为最快的交付井。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Delivering a One Phase Well Under Two Days with a One Inch Cutter PDC Drill Bit: A Record Breaking Performance in Mature Field, Drilling Optimization Case History
Mahakam Block is a huge oil and gas concession managed by PT. Pertamina Hulu Mahakam (PHM) and located in deltaic and offshore environment in East Kalimantan, Indonesia. Until today, the field has produced oil and gas for more than 50 years and categorized as "brown field" due to its declining production and marginal reserve potential. This condition has led to numerous effort to boost efficiency in well delivery from drilling perspective such that the reserve could be produced more economically. One of the effort that has been done to create a well to be more economical is by increasing the Rate of Penetration (ROP). An increase in ROP would directly impact on well duration that could be finished faster in such that it would also impact on much lower well cost. There are several key factors that influence ROP, yet the most crucial part is coming from drilling bit design that is used to drill the formation. Incompatibility between bit design with formation and directional drive type would often result in slow drilling progress and thus would make a well less profitable. To support this idea, the operator has launched a campaign called MAXIDRILL with aim to have a persistent excellent drilling performance from ROP perspective. Selective approach to different bit designs and bit suppliers has brought the operator to conduct the first trial in Indonesia utilizing a one inch PDC cutter drill bit. Besides the effort to increase well economics by increasing ROP using various bit designs through MAXIDRILL Campaign, PHM also tries to implement new set of well architecture dedicated specifically for developing the shallow hydrocarbon zone in Mahakam in general, and in Tunu Field in particular. With this new type of architecture, it allows drilling with 9-1/2″ hole to be done straight from 20″ Conductor Pipe down to well final target depth in single phase, where next 3-1/2″ production tubing will be run and cemented in place. The new design of architecture is called "One Phase Well". This novel innovation was initiated in 2019, where to date, the operator has drilled more than 30 wells without any incident. With the learning curve that has turned into industrialization steps. More and more shorter well duration is born with these two initiatives, MAXIDRILL and One Phase Well. Ultimately, with the spirit of these two initiatives for bringing down well duration in gain for much better well economics has successfully set a two record breaking performance in Mahakam: 1) Being the fastest On Bottom ROP and 2) Being the fastest well ever delivered in Mahakam and Indonesia which is under two days.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信