{"title":"基于经济规模的废电厂经济分析——以梅拉普提废电厂为例","authors":"Hendrik Amrico, R. Dalimi","doi":"10.24036/jptk.v6i2.33223","DOIUrl":null,"url":null,"abstract":"Jakarta's dense population creates problems with the high daily waste production, which reaches 7,500 tons. On the other hand, the open dumping method in the final waste treatment creates another problem in the form of greenhouse gas emissions. The regional government also issued a policy to reduce greenhouse gas emissions to achieve net zero emission by 2050. The solution that then emerged for the two problems above was to convert waste into electrical energy through incineration technology. This study aims to conduct an economic analysis in the context of implementing incineration technology. The results showed that the minimum capacity for economic feasibility was 8 MW with an LCoE of IDR 2,578.32/kWh, 429 tonnes of waste per day, an IRR of 8.63%, and an NPV of IDR 115,038,835,638.12 at an investment value of IDR 505.877.074.317","PeriodicalId":55675,"journal":{"name":"Jurnal Pendidikan Teknologi dan Kejuruan","volume":"15 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Economic Analysis Of Waste Power Plants Based On The Economic Scale-Case Study Merah Putih Waste Power Plant\",\"authors\":\"Hendrik Amrico, R. Dalimi\",\"doi\":\"10.24036/jptk.v6i2.33223\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Jakarta's dense population creates problems with the high daily waste production, which reaches 7,500 tons. On the other hand, the open dumping method in the final waste treatment creates another problem in the form of greenhouse gas emissions. The regional government also issued a policy to reduce greenhouse gas emissions to achieve net zero emission by 2050. The solution that then emerged for the two problems above was to convert waste into electrical energy through incineration technology. This study aims to conduct an economic analysis in the context of implementing incineration technology. The results showed that the minimum capacity for economic feasibility was 8 MW with an LCoE of IDR 2,578.32/kWh, 429 tonnes of waste per day, an IRR of 8.63%, and an NPV of IDR 115,038,835,638.12 at an investment value of IDR 505.877.074.317\",\"PeriodicalId\":55675,\"journal\":{\"name\":\"Jurnal Pendidikan Teknologi dan Kejuruan\",\"volume\":\"15 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-05-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Pendidikan Teknologi dan Kejuruan\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24036/jptk.v6i2.33223\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Pendidikan Teknologi dan Kejuruan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24036/jptk.v6i2.33223","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

雅加达人口密集,每天产生的垃圾高达7500吨。另一方面,露天倾倒法在最终废物处理中产生了另一个问题,即温室气体排放。当地政府还发布了一项减少温室气体排放的政策,到2050年实现净零排放。解决上述两个问题的办法是通过焚烧技术将垃圾转化为电能。本研究的目的是在实施焚烧技术的背景下进行经济分析。结果表明,经济可行性的最小容量为8 MW, LCoE为2,578.32/kWh,每天产生429吨废物,IRR为8.63%,投资价值为505.877.074.317,净现值为115,038,835,638.12印尼盾
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Economic Analysis Of Waste Power Plants Based On The Economic Scale-Case Study Merah Putih Waste Power Plant
Jakarta's dense population creates problems with the high daily waste production, which reaches 7,500 tons. On the other hand, the open dumping method in the final waste treatment creates another problem in the form of greenhouse gas emissions. The regional government also issued a policy to reduce greenhouse gas emissions to achieve net zero emission by 2050. The solution that then emerged for the two problems above was to convert waste into electrical energy through incineration technology. This study aims to conduct an economic analysis in the context of implementing incineration technology. The results showed that the minimum capacity for economic feasibility was 8 MW with an LCoE of IDR 2,578.32/kWh, 429 tonnes of waste per day, an IRR of 8.63%, and an NPV of IDR 115,038,835,638.12 at an investment value of IDR 505.877.074.317
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
20
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信