{"title":"光伏高穿入分输配电线路接地故障过电压","authors":"Yu Li, F. Katiraei","doi":"10.1109/TDC.2016.7519862","DOIUrl":null,"url":null,"abstract":"Ground fault over-voltage (GFOV) study is an indispensable utility planning study for circuits with high penetration of PV. This paper presented mechanism of GFOV on sub-transmission circuit and distribution circuit caused by both rotating machine generation and PV inverter generation. GFOV on a real sub-transmission circuit with different penetration level of PV was modeled and simulated in PSCAD/EMTDC. Simulation results were analyzed according to the voltage arrester TOV curve as sub-transmission level study criteria and ITIC curve as distribution level study criteria. Based on comparing GFOV caused by rotating machine generation and by PV inverter generation, analysis results were discussed in detail. GFOV mitigation measures were also discussed in this paper.","PeriodicalId":6497,"journal":{"name":"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","volume":"58 1","pages":"1-4"},"PeriodicalIF":0.0000,"publicationDate":"2016-05-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Ground fault over-voltage on sub-transmission and distribution circuit with high penetration of PV\",\"authors\":\"Yu Li, F. Katiraei\",\"doi\":\"10.1109/TDC.2016.7519862\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Ground fault over-voltage (GFOV) study is an indispensable utility planning study for circuits with high penetration of PV. This paper presented mechanism of GFOV on sub-transmission circuit and distribution circuit caused by both rotating machine generation and PV inverter generation. GFOV on a real sub-transmission circuit with different penetration level of PV was modeled and simulated in PSCAD/EMTDC. Simulation results were analyzed according to the voltage arrester TOV curve as sub-transmission level study criteria and ITIC curve as distribution level study criteria. Based on comparing GFOV caused by rotating machine generation and by PV inverter generation, analysis results were discussed in detail. GFOV mitigation measures were also discussed in this paper.\",\"PeriodicalId\":6497,\"journal\":{\"name\":\"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)\",\"volume\":\"58 1\",\"pages\":\"1-4\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-05-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDC.2016.7519862\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2016.7519862","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

接地故障过电压(GFOV)研究是光伏高渗透电路不可缺少的公用事业规划研究。本文介绍了旋转发电机发电和光伏逆变器发电对分输配电线路产生GFOV的机理。在PSCAD/EMTDC软件中对不同光伏穿透水平的实际子传输电路的GFOV进行了建模和仿真。以避雷器TOV曲线作为亚传输级研究准则,ITIC曲线作为配电级研究准则,对仿真结果进行了分析。通过对旋转机发电和光伏逆变器发电两种方式的GFOV进行比较,对分析结果进行了详细讨论。本文还讨论了GFOV的缓解措施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Ground fault over-voltage on sub-transmission and distribution circuit with high penetration of PV
Ground fault over-voltage (GFOV) study is an indispensable utility planning study for circuits with high penetration of PV. This paper presented mechanism of GFOV on sub-transmission circuit and distribution circuit caused by both rotating machine generation and PV inverter generation. GFOV on a real sub-transmission circuit with different penetration level of PV was modeled and simulated in PSCAD/EMTDC. Simulation results were analyzed according to the voltage arrester TOV curve as sub-transmission level study criteria and ITIC curve as distribution level study criteria. Based on comparing GFOV caused by rotating machine generation and by PV inverter generation, analysis results were discussed in detail. GFOV mitigation measures were also discussed in this paper.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信