{"title":"爱沙尼亚偏远地区离网混合电力供应的经济可行性。第2部分:电网延伸距离盈亏平衡的确定","authors":"V. Bolgov, K. Janson","doi":"10.1109/PQ.2016.7724111","DOIUrl":null,"url":null,"abstract":"The paper considers the implementation of an off-grid hybrid power supply as an alternative to construction of a grid connection in sparsely populated remote areas in Estonia. In the previous part, the proper configurations of the off-grid hybrid system and component sizes were determined through optimization procedures at different typical meteorological conditions including coastal and inland ones. In this part, levelized costs of energy (LCOEs) were found for a newly built grid connection under the same load demands and interest rates. They were compared with the LCOEs for the off-grid systems in order to find breakeven grid extension distances. As a result, the recommendations on the expedience of off-grid hybrid power supply were obtained for different regions of Estonia.","PeriodicalId":6470,"journal":{"name":"2016 Electric Power Quality and Supply Reliability (PQ)","volume":"32 1","pages":"187-192"},"PeriodicalIF":0.0000,"publicationDate":"2016-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Economical feasibility of off-grid hybrid power supply for estonian remote areas—part 2: Determination of breakeven grid extension distances\",\"authors\":\"V. Bolgov, K. Janson\",\"doi\":\"10.1109/PQ.2016.7724111\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper considers the implementation of an off-grid hybrid power supply as an alternative to construction of a grid connection in sparsely populated remote areas in Estonia. In the previous part, the proper configurations of the off-grid hybrid system and component sizes were determined through optimization procedures at different typical meteorological conditions including coastal and inland ones. In this part, levelized costs of energy (LCOEs) were found for a newly built grid connection under the same load demands and interest rates. They were compared with the LCOEs for the off-grid systems in order to find breakeven grid extension distances. As a result, the recommendations on the expedience of off-grid hybrid power supply were obtained for different regions of Estonia.\",\"PeriodicalId\":6470,\"journal\":{\"name\":\"2016 Electric Power Quality and Supply Reliability (PQ)\",\"volume\":\"32 1\",\"pages\":\"187-192\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 Electric Power Quality and Supply Reliability (PQ)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PQ.2016.7724111\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 Electric Power Quality and Supply Reliability (PQ)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PQ.2016.7724111","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Economical feasibility of off-grid hybrid power supply for estonian remote areas—part 2: Determination of breakeven grid extension distances
The paper considers the implementation of an off-grid hybrid power supply as an alternative to construction of a grid connection in sparsely populated remote areas in Estonia. In the previous part, the proper configurations of the off-grid hybrid system and component sizes were determined through optimization procedures at different typical meteorological conditions including coastal and inland ones. In this part, levelized costs of energy (LCOEs) were found for a newly built grid connection under the same load demands and interest rates. They were compared with the LCOEs for the off-grid systems in order to find breakeven grid extension distances. As a result, the recommendations on the expedience of off-grid hybrid power supply were obtained for different regions of Estonia.