{"title":"周转检查性能测量工具","authors":"Ilker Cankara, M. Al-Azmi","doi":"10.2118/195139-MS","DOIUrl":null,"url":null,"abstract":"\n Turnaround Inspections, or alternatively called Testing and Inspection (T&I) activities are critically important for the integrity of oil and gas facilities, and if not planned and executed properly, can easily lead to catastrophic failures that may possibly result in injuries, fatalities, property damage, and production losses. Measuring the performance of the teams planning and conducting T&Is, and feeding the measurement findings into the existing plans to achieve continuous improvement, is key to the success of these operations posing high risk. This paper provides detailed information on the structure, design criteria, applicability, and benefits of a T&I Performance measurement tool, developed for a hydrocarbon producing department running several gas oil separation, gas compression and utility plants, and continuously performing T&Is of various magnitudes, based on annual equipment inspection schedules. During the design and development stage, several expectations from Operational Excellence Program, Safety Management System, and Corporate Maintenance Council, were incorporated into the tool. The mentioned alignment with various management systems strengthens the measurement coverage, and if used properly, the tool can bridge multiple gaps identified in various programs. The tool provides a single dashboard \"T&I KPI\" in the form of a composite index, expressed with four (4) major components, which are namely, HSE (Health, Safety and Environment), Cost& Profitability, Reliability, and Effectiveness. These major components are further broken down to planning and executional success factors, obtained from the actual worksite data and planning compliance checklists. Accidents recorded, availability of job safety analysis, confined space, scaffold, and critical lift plans, compliance to corporate requirements prior to execution of the work, work quality, scheduling performance, and budgetary discipline are among the success factors that feed into the performance readiness and execution measurement calculations. The tool can be utilized for T&I activities governed by an annual schedule, a set of critical equipment to be opened up during planned/unplanned shutdowns, or for a multi-component unit with its associated equipment to be tested and inspected under a single scope, such as a gas compressor system. It drives actions as different aspects of the T&I activities are reviewed with a solid scoring methodology that clearly indicates the areas of improvement, which can then be addressed with corrective actions to prevent reoccurrence. Continuous and consistent utilization of the tool can lead to reduction in the accident frequencies, T&I durations, and outages of critical equipment, vessels, and storage tanks, which could possibly impact plant output rates.","PeriodicalId":10908,"journal":{"name":"Day 2 Tue, March 19, 2019","volume":"16 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-03-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Turnaround Inspections Performance Measurement Tool\",\"authors\":\"Ilker Cankara, M. Al-Azmi\",\"doi\":\"10.2118/195139-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Turnaround Inspections, or alternatively called Testing and Inspection (T&I) activities are critically important for the integrity of oil and gas facilities, and if not planned and executed properly, can easily lead to catastrophic failures that may possibly result in injuries, fatalities, property damage, and production losses. Measuring the performance of the teams planning and conducting T&Is, and feeding the measurement findings into the existing plans to achieve continuous improvement, is key to the success of these operations posing high risk. This paper provides detailed information on the structure, design criteria, applicability, and benefits of a T&I Performance measurement tool, developed for a hydrocarbon producing department running several gas oil separation, gas compression and utility plants, and continuously performing T&Is of various magnitudes, based on annual equipment inspection schedules. During the design and development stage, several expectations from Operational Excellence Program, Safety Management System, and Corporate Maintenance Council, were incorporated into the tool. The mentioned alignment with various management systems strengthens the measurement coverage, and if used properly, the tool can bridge multiple gaps identified in various programs. The tool provides a single dashboard \\\"T&I KPI\\\" in the form of a composite index, expressed with four (4) major components, which are namely, HSE (Health, Safety and Environment), Cost& Profitability, Reliability, and Effectiveness. These major components are further broken down to planning and executional success factors, obtained from the actual worksite data and planning compliance checklists. Accidents recorded, availability of job safety analysis, confined space, scaffold, and critical lift plans, compliance to corporate requirements prior to execution of the work, work quality, scheduling performance, and budgetary discipline are among the success factors that feed into the performance readiness and execution measurement calculations. The tool can be utilized for T&I activities governed by an annual schedule, a set of critical equipment to be opened up during planned/unplanned shutdowns, or for a multi-component unit with its associated equipment to be tested and inspected under a single scope, such as a gas compressor system. It drives actions as different aspects of the T&I activities are reviewed with a solid scoring methodology that clearly indicates the areas of improvement, which can then be addressed with corrective actions to prevent reoccurrence. Continuous and consistent utilization of the tool can lead to reduction in the accident frequencies, T&I durations, and outages of critical equipment, vessels, and storage tanks, which could possibly impact plant output rates.\",\"PeriodicalId\":10908,\"journal\":{\"name\":\"Day 2 Tue, March 19, 2019\",\"volume\":\"16 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-03-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, March 19, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/195139-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, March 19, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/195139-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

周转检查,或称为测试和检查(T&I)活动对于油气设施的完整性至关重要,如果计划和执行不当,很容易导致灾难性故障,可能导致人员伤亡、财产损失和生产损失。测量团队计划和执行t&i的绩效,并将测量结果提供给现有计划以实现持续改进,是这些高风险操作成功的关键。本文详细介绍了T&I性能测量工具的结构、设计标准、适用性和效益,该工具是为烃类生产部门开发的,该部门运行多个油气分离、气体压缩和公用设施工厂,并根据年度设备检查计划连续执行各种规模的T&I。在设计和开发阶段,来自运营卓越计划、安全管理系统和企业维护委员会的几个期望被纳入该工具。提到的与各种管理系统的一致性加强了度量覆盖范围,并且如果使用得当,该工具可以弥合在各种计划中确定的多个差距。该工具以复合指数的形式提供了一个单一的仪表板“T&I KPI”,由四(4)个主要组件表示,即HSE(健康、安全和环境)、成本和盈利能力、可靠性和有效性。这些主要组成部分进一步分解为计划和执行成功因素,从实际工作现场数据和计划遵从性检查表中获得。记录的事故、工作安全分析的可用性、密闭空间、脚手架和关键的升降计划、在工作执行前对公司要求的遵守、工作质量、调度绩效和预算纪律都是成功的因素,这些因素被输入到性能准备和执行测量计算中。该工具可用于按年度计划进行的T&I活动,在计划/计划外停机期间打开的一组关键设备,或在单一范围内测试和检查多组件单元及其相关设备,例如气体压缩机系统。它驱动行动,因为T&I活动的不同方面是用可靠的评分方法进行审查的,该方法清楚地指出了改进的领域,然后可以通过纠正措施来解决,以防止再次发生。持续、一致地使用该工具可以减少事故频率、T&I持续时间以及关键设备、船舶和储罐的中断,而这些可能会影响工厂的产量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Turnaround Inspections Performance Measurement Tool
Turnaround Inspections, or alternatively called Testing and Inspection (T&I) activities are critically important for the integrity of oil and gas facilities, and if not planned and executed properly, can easily lead to catastrophic failures that may possibly result in injuries, fatalities, property damage, and production losses. Measuring the performance of the teams planning and conducting T&Is, and feeding the measurement findings into the existing plans to achieve continuous improvement, is key to the success of these operations posing high risk. This paper provides detailed information on the structure, design criteria, applicability, and benefits of a T&I Performance measurement tool, developed for a hydrocarbon producing department running several gas oil separation, gas compression and utility plants, and continuously performing T&Is of various magnitudes, based on annual equipment inspection schedules. During the design and development stage, several expectations from Operational Excellence Program, Safety Management System, and Corporate Maintenance Council, were incorporated into the tool. The mentioned alignment with various management systems strengthens the measurement coverage, and if used properly, the tool can bridge multiple gaps identified in various programs. The tool provides a single dashboard "T&I KPI" in the form of a composite index, expressed with four (4) major components, which are namely, HSE (Health, Safety and Environment), Cost& Profitability, Reliability, and Effectiveness. These major components are further broken down to planning and executional success factors, obtained from the actual worksite data and planning compliance checklists. Accidents recorded, availability of job safety analysis, confined space, scaffold, and critical lift plans, compliance to corporate requirements prior to execution of the work, work quality, scheduling performance, and budgetary discipline are among the success factors that feed into the performance readiness and execution measurement calculations. The tool can be utilized for T&I activities governed by an annual schedule, a set of critical equipment to be opened up during planned/unplanned shutdowns, or for a multi-component unit with its associated equipment to be tested and inspected under a single scope, such as a gas compressor system. It drives actions as different aspects of the T&I activities are reviewed with a solid scoring methodology that clearly indicates the areas of improvement, which can then be addressed with corrective actions to prevent reoccurrence. Continuous and consistent utilization of the tool can lead to reduction in the accident frequencies, T&I durations, and outages of critical equipment, vessels, and storage tanks, which could possibly impact plant output rates.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信