{"title":"成功钻出最长水平含酸气井","authors":"Amna Yaaqob Khamis Salem Aladsani, J. Aranda, M. Ahmed, Salah Al Qallabi, I. Bankole, Mubashir Ahmed, Ashim Dutta, M. Baslaib, Omar Aljeelani, Fahad Alrumaithi, Z. Hajri, Mohamed Anwar, Adel Al Hammadi","doi":"10.2118/193017-MS","DOIUrl":null,"url":null,"abstract":"\n Objective/Scope; ADNOC onshore has overcome yet another challenge in drilling longest horizontal well 10,000 ft in aggressive environment having ±30% H2S and ±10 CO2 with reservoir temperature around ±300°F. This project is part of the country strategy in meeting energy growth in sour gas wells for the coming future development.\n Methods, Procedure, Process; the strategy is to enhance the well productivity by minimizing the footprint and drilling long horizontal well in harsh environment by achieving maximum accessible reservoir contact. A detailed well design was generated for each zone separately that touched different aspects from the planning phase to the execution and production in safe operating manner. It required an integrated approach bringing together many different technical and operation solution to achieve the drilling of long horizontal well. The well design was reviewed at each step was agreed\n One the challenges to start drilling Sour Gas exploration well was penetrating multiple high temperature high pressure reservoirs with minimum geosteering to maintain smooth trajectory thru the structure of the reservoir to enhance well accessibility intervention. The objective was achieved by using rig capable to drill long horizontal well and drilling fluid which is compatible with logging tools that contains low salinity and low solids which assists in enhance the efficiency of the tools and achieving the target of drilling 10,000 ft horizontal sour gas well. The torque and drag calculation were reviewed and accordingly the drilling assemblies were selected. The well was completed with specialized material that will withstand the temperature and pressure changes during production and toxic environment having ±30% H2S and ±10 CO2. Moreover, this was also subjected to comprehensive review of HSE rules and regulations including safety and precautions while drilling.\n Results, Observations, conclusions; Drilling and developing sour gas well with more than ±30% H2S and ±10 CO2 is an accomplishment. ADNOC onshore has studied the opportunity of drilling long horizontal well achieving maximum reservoir contact with the minimum footprintwhich will assist in reducing the cost of the future wells. Over the past years, ADNOC onshore has developed experience in drilling long horizontal wells in sour wells keeping in mind the safety and environmental aspects. A team of professional expects and support is available to achieve the objective safely & efficiently.\n Novel/Additive Information; Developing sour gas wells has always been challenge due to the sour environment and accessing deeper horizon that require advance theology. Sour gas opens new marketing channels for ADNOC by maximizing the investment opportunities for the future investors and stakeholders. This will open new cost, maximizing the productivity without compromising the safety and allow drilling long horizontal wells in challenging atmosphere. The paper will describe the various issues faced while drilling sour gas well.","PeriodicalId":11208,"journal":{"name":"Day 2 Tue, November 13, 2018","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Successful Drilling Longest Horizontal Sour Gas Well\",\"authors\":\"Amna Yaaqob Khamis Salem Aladsani, J. Aranda, M. Ahmed, Salah Al Qallabi, I. Bankole, Mubashir Ahmed, Ashim Dutta, M. Baslaib, Omar Aljeelani, Fahad Alrumaithi, Z. Hajri, Mohamed Anwar, Adel Al Hammadi\",\"doi\":\"10.2118/193017-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Objective/Scope; ADNOC onshore has overcome yet another challenge in drilling longest horizontal well 10,000 ft in aggressive environment having ±30% H2S and ±10 CO2 with reservoir temperature around ±300°F. This project is part of the country strategy in meeting energy growth in sour gas wells for the coming future development.\\n Methods, Procedure, Process; the strategy is to enhance the well productivity by minimizing the footprint and drilling long horizontal well in harsh environment by achieving maximum accessible reservoir contact. A detailed well design was generated for each zone separately that touched different aspects from the planning phase to the execution and production in safe operating manner. It required an integrated approach bringing together many different technical and operation solution to achieve the drilling of long horizontal well. The well design was reviewed at each step was agreed\\n One the challenges to start drilling Sour Gas exploration well was penetrating multiple high temperature high pressure reservoirs with minimum geosteering to maintain smooth trajectory thru the structure of the reservoir to enhance well accessibility intervention. The objective was achieved by using rig capable to drill long horizontal well and drilling fluid which is compatible with logging tools that contains low salinity and low solids which assists in enhance the efficiency of the tools and achieving the target of drilling 10,000 ft horizontal sour gas well. The torque and drag calculation were reviewed and accordingly the drilling assemblies were selected. The well was completed with specialized material that will withstand the temperature and pressure changes during production and toxic environment having ±30% H2S and ±10 CO2. Moreover, this was also subjected to comprehensive review of HSE rules and regulations including safety and precautions while drilling.\\n Results, Observations, conclusions; Drilling and developing sour gas well with more than ±30% H2S and ±10 CO2 is an accomplishment. ADNOC onshore has studied the opportunity of drilling long horizontal well achieving maximum reservoir contact with the minimum footprintwhich will assist in reducing the cost of the future wells. Over the past years, ADNOC onshore has developed experience in drilling long horizontal wells in sour wells keeping in mind the safety and environmental aspects. A team of professional expects and support is available to achieve the objective safely & efficiently.\\n Novel/Additive Information; Developing sour gas wells has always been challenge due to the sour environment and accessing deeper horizon that require advance theology. Sour gas opens new marketing channels for ADNOC by maximizing the investment opportunities for the future investors and stakeholders. This will open new cost, maximizing the productivity without compromising the safety and allow drilling long horizontal wells in challenging atmosphere. The paper will describe the various issues faced while drilling sour gas well.\",\"PeriodicalId\":11208,\"journal\":{\"name\":\"Day 2 Tue, November 13, 2018\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-11-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, November 13, 2018\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/193017-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, November 13, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/193017-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

目的/范围;ADNOC陆上公司克服了另一个挑战,在恶劣的环境中钻出最长的水平井,井长10,000英尺,含±30% H2S和±10 CO2,储层温度约为±300°F。该项目是国家战略的一部分,旨在为未来的发展满足酸气井的能源增长。方法、程序、过程;该策略是通过最小化占地面积和在恶劣环境下钻长水平井,实现最大可达油藏接触面,从而提高油井产能。每个区域的详细井设计都是单独生成的,涉及从规划阶段到执行和安全生产的不同方面。这需要一种综合的方法,将许多不同的技术和操作解决方案结合起来,以实现长水平井的钻井。开始钻Sour Gas探井面临的挑战之一是在最小的地质导向下穿透多个高温高压储层,以保持通过储层结构的平滑轨迹,以提高油井的可达性。通过使用能够钻长水平井的钻机,以及与含有低矿化度和低固体含量的测井工具兼容的钻井液,可以帮助提高工具的效率,并实现钻10,000英尺水平含硫气井的目标,实现了这一目标。对扭矩和阻力计算进行了校核,并据此选择了钻井组合。该井采用了特殊材料,该材料可以承受生产过程中的温度和压力变化,以及含有±30% H2S和±10 CO2的有毒环境。此外,还需要对HSE法规进行全面审查,包括钻井时的安全和预防措施。结果、观察、结论;H2S含量超过±30%、CO2含量超过±10的含硫气井的钻探和开发是一项成就。ADNOC陆上公司已经研究了钻长水平井的机会,以最小的占地面积实现最大的油藏接触,这将有助于降低未来钻井的成本。在过去的几年里,ADNOC在考虑安全和环境因素的情况下,积累了在酸井中钻长水平井的经验。一个专业的期望和支持团队可以安全有效地实现目标。小说/添加剂信息;由于酸性环境和进入更深的层位,开发含硫气井一直是一个挑战。酸气通过最大化未来投资者和利益相关者的投资机会,为ADNOC开辟了新的营销渠道。这将带来新的成本,在不影响安全性的情况下最大限度地提高生产率,并允许在具有挑战性的环境中钻出长水平井。本文将阐述在开采含硫气井时所面临的各种问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Successful Drilling Longest Horizontal Sour Gas Well
Objective/Scope; ADNOC onshore has overcome yet another challenge in drilling longest horizontal well 10,000 ft in aggressive environment having ±30% H2S and ±10 CO2 with reservoir temperature around ±300°F. This project is part of the country strategy in meeting energy growth in sour gas wells for the coming future development. Methods, Procedure, Process; the strategy is to enhance the well productivity by minimizing the footprint and drilling long horizontal well in harsh environment by achieving maximum accessible reservoir contact. A detailed well design was generated for each zone separately that touched different aspects from the planning phase to the execution and production in safe operating manner. It required an integrated approach bringing together many different technical and operation solution to achieve the drilling of long horizontal well. The well design was reviewed at each step was agreed One the challenges to start drilling Sour Gas exploration well was penetrating multiple high temperature high pressure reservoirs with minimum geosteering to maintain smooth trajectory thru the structure of the reservoir to enhance well accessibility intervention. The objective was achieved by using rig capable to drill long horizontal well and drilling fluid which is compatible with logging tools that contains low salinity and low solids which assists in enhance the efficiency of the tools and achieving the target of drilling 10,000 ft horizontal sour gas well. The torque and drag calculation were reviewed and accordingly the drilling assemblies were selected. The well was completed with specialized material that will withstand the temperature and pressure changes during production and toxic environment having ±30% H2S and ±10 CO2. Moreover, this was also subjected to comprehensive review of HSE rules and regulations including safety and precautions while drilling. Results, Observations, conclusions; Drilling and developing sour gas well with more than ±30% H2S and ±10 CO2 is an accomplishment. ADNOC onshore has studied the opportunity of drilling long horizontal well achieving maximum reservoir contact with the minimum footprintwhich will assist in reducing the cost of the future wells. Over the past years, ADNOC onshore has developed experience in drilling long horizontal wells in sour wells keeping in mind the safety and environmental aspects. A team of professional expects and support is available to achieve the objective safely & efficiently. Novel/Additive Information; Developing sour gas wells has always been challenge due to the sour environment and accessing deeper horizon that require advance theology. Sour gas opens new marketing channels for ADNOC by maximizing the investment opportunities for the future investors and stakeholders. This will open new cost, maximizing the productivity without compromising the safety and allow drilling long horizontal wells in challenging atmosphere. The paper will describe the various issues faced while drilling sour gas well.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信